BOOZ ALLEN HAMILTON INC
Federal contract award, Booz Allen Hamilton, $90,345,893
Key CONT_AWD_DEFE0004001_8900_-NONE-_-NONE-. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 460 days before this system saw it. One version on record.
Cite this row
4ae22da5d78beabb5af97ed083a923a477252dee8a5629d9f8c1aa9fc8645d0bThe source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $90,345,893 | first version | August 13, 2009 | June 2, 2025 | 2026-09-05T00:51:38Z | historical sweep | 4ae22da5d78b |
Archived copy
None on file. An archived copy is optional corroboration and never a condition of this filing’s provenance, which is the stored response and its hash above; see the methodology page.
What the amount is made of
188 recorded actions, so the amount is the award's current total across all of them. 172 of them obligated money. Measured 2026-10-18, when USAspending reported a total obligation of $90,345,893.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| June 2, 2025 | 187 | OTHER ADMINISTRATIVE ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, ADMINISTRATIVE ACTION TO REDUCE CONTRACT CEILING, MODIFICATION 187 |
| March 28, 2022 | 186 | FUNDING ONLY ACTION | −$70,403 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, DEOBLIGATION, MODIFICATION 186 |
| July 20, 2021 | 185 | FUNDING ONLY ACTION | −$73,626 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, DEOBLIGATION, MODIFICATION 185 |
| March 4, 2019 | 184 | FUNDING ONLY ACTION | −$23,289 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, DEOBLIGATION, MODIFICATION 184 |
| September 10, 2018 | 183 | FUNDING ONLY ACTION | −$0 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, DEOBLIGATION, MODIFICATION 183 |
| April 13, 2017 | 182 | FUNDING ONLY ACTION | −$12,562 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, DEOBLIGATION, MODIFICATION 182 |
| August 19, 2016 | 181 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$21,400 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 181 |
| August 9, 2016 | 180 | FUNDING ONLY ACTION | −$45,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 180 |
| June 23, 2016 | 179 | FUNDING ONLY ACTION | −$91,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 179 |
| June 2, 2016 | 178 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$122,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, PERIOD 13 FEE POOL, AND INCREMENTAL FUNDING, MODIFICATION 178 |
| May 19, 2016 | 177 | FUNDING ONLY ACTION | +$342,668 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 177 |
| May 10, 2016 | 176 | FUNDING ONLY ACTION | +$268,670 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 176 |
| April 29, 2016 | 175 | FUNDING ONLY ACTION | +$294,350 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 175 |
| April 15, 2016 | 174 | FUNDING ONLY ACTION | +$221,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 174 |
| March 30, 2016 | 173 | FUNDING ONLY ACTION | +$1,122,965 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 173 |
| March 18, 2016 | 172 | FUNDING ONLY ACTION | +$351,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 172 |
| March 8, 2016 | 171 | FUNDING ONLY ACTION | +$136,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 171 |
| February 26, 2016 | 170 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$202,258 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, EXTEND PERIOD OF PERFORMANCE THREE MONTHS, AND UPDATE H.15 CLAUSE, MODIFICATION 170 |
| January 27, 2016 | 169 | FUNDING ONLY ACTION | +$164,930 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 169 |
| January 13, 2016 | 168 | FUNDING ONLY ACTION | +$222,462 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 168 |
| January 6, 2016 | 167 | FUNDING ONLY ACTION | +$100,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 167 |
| December 15, 2015 | 166 | FUNDING ONLY ACTION | +$374,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 166 |
| November 30, 2015 | 165 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$17,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, AND PERIOD 12 FEE POOL, MODIFICATION 164 |
| November 3, 2015 | 164 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$155,174 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, EXTEND PERIOD OF PERFORMANCE THREE MONTHS, AND UPDATE H.15 CLAUSE, MODIFICATION 164 |
| September 24, 2015 | 163 | FUNDING ONLY ACTION | +$5,400 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 163 |
| September 23, 2015 | 162 | FUNDING ONLY ACTION | +$1,342,175 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 162 |
| September 18, 2015 | 161 | FUNDING ONLY ACTION | +$889,996 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 161 |
| September 3, 2015 | 160 | FUNDING ONLY ACTION | +$396,093 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 160 |
| August 27, 2015 | 159 | FUNDING ONLY ACTION | +$392,291 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 159 |
| August 19, 2015 | 158 | FUNDING ONLY ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, FUNDING ADJUSTMENT, MODIFICATION 158 |
| August 6, 2015 | 157 | FUNDING ONLY ACTION | +$434,836 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 157 |
| July 30, 2015 | 156 | FUNDING ONLY ACTION | +$263,469 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 156 |
| July 17, 2015 | 155 | FUNDING ONLY ACTION | +$150,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 155 |
| July 16, 2015 | 154 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$783,700 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, UPDATE H.15 CLAUSE AND INCREMENTAL FUNDING, MODIFICATION 154 |
| July 13, 2015 | 153 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,940,001 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, EXTEND PERIOD OF PERFORMANCE FOUR MONTHS, INCREMENTAL FUNDING, MODIFICATION 153 |
| July 13, 2015 | 152 | FUNDING ONLY ACTION | −$1,875 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, FUNDING DEOBLIGATION, MODIFICATION 152 |
| July 8, 2015 | 151 | FUNDING ONLY ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, FUNDING DEOBLIGATION, MODIFICATION 151 |
| July 2, 2015 | 150 | FUNDING ONLY ACTION | −$173,840 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, FUNDING DEOBLIGATION, MODIFICATION 150 |
| July 1, 2015 | 149 | FUNDING ONLY ACTION | −$82,328 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, FUNDING DEOBLIGATION, MODIFICATION 149 |
| June 11, 2015 | 148 | FUNDING ONLY ACTION | +$455,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 148 |
| June 3, 2015 | 147 | FUNDING ONLY ACTION | +$130,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 147 |
| May 27, 2015 | 146 | FUNDING ONLY ACTION | +$267,178 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 146 |
| May 15, 2015 | 145 | FUNDING ONLY ACTION | +$430,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 145 |
| May 14, 2015 | 144 | FUNDING ONLY ACTION | −$430,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 144 |
| May 5, 2015 | 143 | FUNDING ONLY ACTION | +$759,263 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 143 |
| May 5, 2015 | 142 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$135,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING AND ADDITION OF CLAUSE 52.203-17, MODIFICATION 142 |
| April 28, 2015 | 141 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$430,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, UPDATE H.15 CLAUSE AND INCREMENTAL FUNDING, MODIFICATION 141 |
| April 13, 2015 | 140 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$30,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, EXTEND PERIOD OF PERFORMANCE THREE AND A HALF MONTHS, PERIOD 11 FEE POOL, INCREMENTAL FUNDING, AND INCREASE CONTRACT CEILING MODIFICATION 140 |
| March 30, 2015 | 139 | FUNDING ONLY ACTION | +$50,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 139 |
| March 25, 2015 | 138 | FUNDING ONLY ACTION | +$234,850 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 138 |
| March 19, 2015 | 137 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$227,800 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, UPDATE H.4 CLAUSE, MODIFICATION 137 |
| February 27, 2015 | 136 | FUNDING ONLY ACTION | +$2,072,040 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 136 |
| January 26, 2015 | 135 | FUNDING ONLY ACTION | +$620,812 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 135 |
| January 12, 2015 | 134 | FUNDING ONLY ACTION | +$50,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 134 |
| December 23, 2014 | 133 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$502,254 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING AND ADDITION OF CLAUSE 52.204-15, MODIFICATION 133 |
| December 8, 2014 | 132 | FUNDING ONLY ACTION | +$983,904 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 132 |
| December 1, 2014 | 131 | FUNDING ONLY ACTION | −$92,916 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 131 |
| November 14, 2014 | 130 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$260,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, PERIOD 10 FEE POOL AND INCREMENTAL FUNDING, MODIFICATION 130 |
| September 24, 2014 | 129 | FUNDING ONLY ACTION | +$113,500 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 129 |
| September 22, 2014 | 128 | FUNDING ONLY ACTION | +$506,971 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 128 |
| September 19, 2014 | 127 | FUNDING ONLY ACTION | +$625,706 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 127 |
| September 15, 2014 | 126 | FUNDING ONLY ACTION | +$441,474 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 126 |
| September 5, 2014 | 125 | FUNDING ONLY ACTION | +$169,591 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 125 |
| August 27, 2014 | 124 | FUNDING ONLY ACTION | +$387,690 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 124 |
| August 8, 2014 | 123 | FUNDING ONLY ACTION | +$294,309 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 123 |
| July 23, 2014 | 122 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$50,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING AND 6 MONTH EXTENSION, MODIFICATION 122 |
| July 15, 2014 | 121 | FUNDING ONLY ACTION | +$40,350 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 121 |
| July 3, 2014 | 120 | FUNDING ONLY ACTION | +$80,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 120 |
| June 18, 2014 | 119 | FUNDING ONLY ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 119 |
| June 10, 2014 | 118 | FUNDING ONLY ACTION | +$233,178 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 118 |
| May 30, 2014 | 117 | FUNDING ONLY ACTION | +$97,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 117 |
| May 14, 2014 | 116 | FUNDING ONLY ACTION | +$662,652 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 116 |
| May 5, 2014 | 115 | FUNDING ONLY ACTION | +$266,469 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 115 |
| April 16, 2014 | 114 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$164,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, PERIOD 9 FEE POOL AND INCREMENTAL FUNDING, MODIFICATION 114 |
| March 5, 2014 | 113 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$515,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, UPDATE KEY PERSONNEL H.8 CLAUSE AND INCREMENTAL FUNDING, MODIFICATION 113 |
| February 27, 2014 | 112 | FUNDING ONLY ACTION | +$212,019 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 112 |
| February 12, 2014 | 111 | FUNDING ONLY ACTION | −$70,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, ADMINISTRATIVE ACTION TO RECAST FUND CODES FOR PREVIOUSLY OBLIGATED FUNDS, MODIFICATION 111 |
| January 28, 2014 | 110 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$75,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING AND UPDATE KEY PERSONNEL, MODIFICATION 110 |
| January 24, 2014 | 109 | OTHER ADMINISTRATIVE ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, UPDATE H.15 CLAUSE, AND ADD H CLAUSES H.47 THROUGH H.52, MODIFICATION 109 |
| November 18, 2013 | 108 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$70,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, PERIOD 8 FEE POOL, AND CORRECT B.6 CLAUSE, MODIFICATION 108 |
| September 30, 2013 | 107 | FUNDING ONLY ACTION | +$205,200 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 107 |
| September 23, 2013 | 106 | FUNDING ONLY ACTION | +$2,753,143 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 106 |
| September 18, 2013 | 105 | FUNDING ONLY ACTION | +$1,496,073 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 105 |
| September 3, 2013 | 104 | FUNDING ONLY ACTION | +$761,734 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 103 |
| August 7, 2013 | 103 | FUNDING ONLY ACTION | +$270,823 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 103 |
| July 29, 2013 | 102 | FUNDING ONLY ACTION | +$712,612 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 102 |
| July 1, 2013 | 101 | FUNDING ONLY ACTION | +$115,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 101 |
| June 27, 2013 | 100 | FUNDING ONLY ACTION | +$564,797 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 100 |
| June 14, 2013 | 99 | FUNDING ONLY ACTION | +$214,350 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 099 |
| June 11, 2013 | 98 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,144,761 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, UPDATE KEY PERSONNEL, PERIOD 7 FEE POOL, AND ADD H.46 GOVERNMENT PROPERTY CLAUSE, MODIFICATION 098 |
| May 2, 2013 | 97 | FUNDING ONLY ACTION | +$329,715 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 097 |
| April 26, 2013 | 96 | FUNDING ONLY ACTION | +$252,303 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 096 |
| March 26, 2013 | 95 | FUNDING ONLY ACTION | +$184,845 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 095 |
| March 22, 2013 | 94 | FUNDING ONLY ACTION | +$32,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 094 |
| March 8, 2013 | 93 | FUNDING ONLY ACTION | +$177,350 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 093 |
| February 28, 2013 | 92 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$10,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, UPDATE KEY PERSONNEL , MODIFICATION 092 |
| February 13, 2013 | 91 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, ADDITION OF FEDERAL ACQUISITION REGULATION CLAUSE 52.222-17, MODIFICATION 091 |
| January 24, 2013 | 90 | FUNDING ONLY ACTION | +$169,999 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 090 |
| January 4, 2013 | 89 | FUNDING ONLY ACTION | +$45,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 089 |
| November 30, 2012 | 88 | FUNDING ONLY ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 088 |
| October 19, 2012 | 87 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$50,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING AND PERIOD 6 FEE POOL, MODIFICATION 087 |
| September 28, 2012 | 86 | FUNDING ONLY ACTION | +$309,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 086 |
| September 25, 2012 | 85 | FUNDING ONLY ACTION | +$140,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 085 |
| September 24, 2012 | 84 | FUNDING ONLY ACTION | +$1,559,796 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 084 |
| September 21, 2012 | 83 | FUNDING ONLY ACTION | +$2,435,436 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 083 |
| September 18, 2012 | 82 | FUNDING ONLY ACTION | +$2,085,041 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 082 |
| September 11, 2012 | 81 | FUNDING ONLY ACTION | +$780,249 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 081 |
| August 22, 2012 | 80 | FUNDING ONLY ACTION | +$298,531 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 080 |
| August 17, 2012 | 79 | FUNDING ONLY ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 079 |
| July 31, 2012 | 78 | FUNDING ONLY ACTION | +$1,016,620 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 078 |
| July 24, 2012 | 77 | FUNDING ONLY ACTION | +$224,183 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 077 |
| June 28, 2012 | 76 | FUNDING ONLY ACTION | +$489,500 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 076 |
| June 12, 2012 | 75 | FUNDING ONLY ACTION | +$367,972 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 075 |
| June 8, 2012 | 74 | FUNDING ONLY ACTION | +$98,304 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 074 |
| May 23, 2012 | 73 | FUNDING ONLY ACTION | +$96,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 073 |
| May 11, 2012 | 72 | FUNDING ONLY ACTION | +$387,199 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 072 |
| April 26, 2012 | 71 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$50,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, FEE PERIOD 5 AND INCREMENTAL FUNDING, MODIFICATION 071 |
| April 18, 2012 | 70 | OTHER ADMINISTRATIVE ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 ADMINISTRATIVE ACTION TO RECAST FUND CODES FOR PREVIOUSLY OBLIGATED FUNDS, MODIFICATION 070 |
| March 30, 2012 | 69 | FUNDING ONLY ACTION | +$278,927 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 069 |
| March 28, 2012 | 68 | FUNDING ONLY ACTION | +$1,416,952 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 068 |
| March 19, 2012 | 67 | EXERCISE AN OPTION | +$200,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, OPTION PERIOD, MODIFICATION 067 |
| March 2, 2012 | 66 | FUNDING ONLY ACTION | +$367,223 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 066 |
| February 27, 2012 | 65 | FUNDING ONLY ACTION | +$236,379 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 065 |
| February 24, 2012 | 64 | FUNDING ONLY ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 064 |
| February 17, 2012 | 63 | FUNDING ONLY ACTION | +$814,682 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001, INCREMENTAL FUNDING, MODIFICATION 105 |
| January 26, 2012 | 62 | FUNDING ONLY ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 062 |
| December 16, 2011 | 61 | FUNDING ONLY ACTION | +$130,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 061 |
| December 9, 2011 | 60 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$125,004 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING AND REVISED PERIOD 4 FEE POOL, MODIFICATION 060 |
| December 1, 2011 | 59 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$58,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING AND YEAR 3 INDIRECT RATE, MODIFICATION 059 |
| November 21, 2011 | 58 | FUNDING ONLY ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 058 |
| November 15, 2011 | 57 | OTHER ADMINISTRATIVE ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 FEE PERIOD 4 AND CORRECTED REPORTING REQUIREMENTS, MODIFICATION 057 |
| September 29, 2011 | 56 | FUNDING ONLY ACTION | +$100,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 056 |
| September 22, 2011 | 55 | FUNDING ONLY ACTION | +$2,300,405 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 055 |
| September 19, 2011 | 54 | FUNDING ONLY ACTION | +$427,095 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 054 |
| September 17, 2011 | 53 | FUNDING ONLY ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 053 |
| September 13, 2011 | 52 | FUNDING ONLY ACTION | +$2,114,730 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 052 |
| September 2, 2011 | 51 | FUNDING ONLY ACTION | +$63,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 051 |
| August 31, 2011 | 50 | OTHER ADMINISTRATIVE ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 FUNDING RECAST, MODIFICATION 050 |
| August 19, 2011 | 49 | FUNDING ONLY ACTION | +$905,257 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 049 |
| August 1, 2011 | 48 | FUNDING ONLY ACTION | +$1,115,638 | -ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 048 |
| July 27, 2011 | 47 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$91,117 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING AND ADDITION OF FEDERAL ACQUISITION REGULATION CLAUSE 52.222-54, MODIFICATION 047 |
| July 14, 2011 | 46 | FUNDING ONLY ACTION | +$306,979 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING AND REVISED KEY PERSONNEL/PROGRAM MANAGER, MODIFICATION 046 |
| June 7, 2011 | 45 | FUNDING ONLY ACTION | +$1,050,480 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 045 |
| May 26, 2011 | 44 | FUNDING ONLY ACTION | +$423,935 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 044 |
| May 23, 2011 | 43 | FUNDING ONLY ACTION | +$76,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 043 |
| May 6, 2011 | 42 | FUNDING ONLY ACTION | no money | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 042 |
| May 5, 2011 | 41 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$349,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, AWARD FEE POOL 3, REPORTING REQUIREMENTS, PERFORMANCE EVALUATION PLAN, MODIFICATION 041 |
| April 12, 2011 | 40 | FUNDING ONLY ACTION | +$516,618 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 040 |
| April 8, 2011 | 39 | FUNDING ONLY ACTION | +$96,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 039 |
| April 8, 2011 | 38 | FUNDING ONLY ACTION | +$55,264 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 038 |
| March 29, 2011 | 37 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$123,300 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING AND ADDITION OF GREEN CLAUSE, MODIFICATION 037 |
| March 14, 2011 | 36 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$947,373 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING AND REVISED PERFORMANCE EVALUATION PLAN, MODIFICATION 036 |
| February 17, 2011 | 35 | FUNDING ONLY ACTION | +$529,249 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 035 |
| February 9, 2011 | 34 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$32,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING AND UPDATE CLAUSE H-15, MODIFICATION 034 |
| January 14, 2011 | 33 | FUNDING ONLY ACTION | +$1,000,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 033 |
| January 11, 2011 | 32 | FUNDING ONLY ACTION | +$790,000 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 032 |
| January 11, 2011 | 31 | FUNDING ONLY ACTION | +$703,749 | ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MODIFICATION 031 |
| December 21, 2010 | 30 | FUNDING ONLY ACTION | +$300,000 | TAS::89 0338::TAS ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MOD 030 |
| December 6, 2010 | 29 | FUNDING ONLY ACTION | +$218,000 | TAS::89 0213::TAS ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, MOD 029 |
| November 16, 2010 | 28 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$656,950 | TAS::89 0318::TAS ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, AND AWARD FEE POOL, MOD 028 |
| October 20, 2010 | 27 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$100,000 | TAS::89 0318::TAS ENERGY SECTOR PLANNING AND ANALYSIS, AWARD DE-FE0004001 INCREMENTAL FUNDING, REPORTING REQUIREMENTS AND PERFORMANCE EVALUATION PLAN, MOD 027 |
| September 30, 2010 | 26 | FUNDING ONLY ACTION | +$91,000 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 INCREMENTAL FUNDING MOD 026 |
| September 27, 2010 | 25 | FUNDING ONLY ACTION | +$2,275,000 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 INCREMENTAL FUNDING MOD 025 |
| September 21, 2010 | 24 | FUNDING ONLY ACTION | +$1,946,049 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 INCREMENTAL FUNDING MOD 024 |
| September 15, 2010 | 23 | FUNDING ONLY ACTION | +$263,461 | TAS::89 0321::TAS ESPA AWARD DE-FE0004001 INCREMENTAL FUNDING MOD 023 |
| September 8, 2010 | 22 | FUNDING ONLY ACTION | +$950,372 | TAS::89 0328::TAS RECOVERY ESPA AWARD DE-FE0004001 INCREMENTAL FUNDING MOD 022 |
| September 3, 2010 | 21 | FUNDING ONLY ACTION | +$4,268,800 | TAS::89 0328::TAS ESPA AWARD DE-FE0004001 INCREMENTAL FUNDING MOD 021 |
| September 2, 2010 | 20 | FUNDING ONLY ACTION | +$161,450 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 INCREMENTAL FUNDING MOD 020 |
| August 25, 2010 | 19 | FUNDING ONLY ACTION | +$500,000 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 INCREMENTAL FUNDING MOD 019 |
| August 13, 2010 | 18 | FUNDING ONLY ACTION | +$1,167,460 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 INCREMENTAL FUNDING MOD 018 |
| August 3, 2010 | 17 | FUNDING ONLY ACTION | +$80,000 | TAS::89 0321::TAS ESPA AWARD DE-FE0004001 INCREMENTAL FUNDING MOD 017 |
| July 28, 2010 | 16 | FUNDING ONLY ACTION | +$1,743,273 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 INCREMENTAL FUNDING MOD 016 |
| July 2, 2010 | 15 | FUNDING ONLY ACTION | +$200,000 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 INCREMENTAL FUNDING MOD 015 |
| June 30, 2010 | 14 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,148,655 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 MOD 014 |
| June 29, 2010 | 13 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$50,000 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 MOD 013 |
| June 8, 2010 | 12 | FUNDING ONLY ACTION | +$1,438,585 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 MOD 012 |
| May 10, 2010 | 11 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$80,467 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 MOD 011 |
| April 30, 2010 | 10 | FUNDING ONLY ACTION | +$437,836 | TAS::89 0328::TAS RECOVERY ESPA AWARD DE-FE0004001 MOD 010 |
| April 21, 2010 | 9 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$880,218 | TAS::89 0213::TAS ESPA AWARD DE-FE0004001 MOD 009 |
| March 25, 2010 | 8 | FUNDING ONLY ACTION | +$1,651,701 | ENERGY SECTOR PLANNING&ANALYSIS SERVICES (ESPA) AWARD DE-FE0004001 MOD 008 OBLIGATES FUNDS TO INCREMENTALLY FUND AWARD |
| March 4, 2010 | 7 | FUNDING ONLY ACTION | +$1,553,364 | TAS::89 0328::TAS RECOVERY ELECTRICITY INFRASTRUCTURE ANALYSIS SUPPORT SERVICES ESPA AWARD DE-FE0004001 MOD 007 |
| February 26, 2010 | 6 | FUNDING ONLY ACTION | +$2,530,930 | ENERGY SECTOR PLANNING AND ANALYSIS SERVICES (ESPA) AWARD DE-FE0004001; MOD 006 OBLIGATES FUNDS TO INCREMNETALLY FUND AWARD |
| December 22, 2009 | 5 | FUNDING ONLY ACTION | +$498,000 | ENERGY SECTOR PLANNING AND ANALYSIS (ESPA), CONTRACT DE-FE0004001, MOD 005 OBLIGATES FUNDS WITH NO INCREASE IN TOTAL ESTIMATED COST AND MODIFIES AWARD TERMS AND CONDITIONS. |
| December 22, 2009 | 4 | OTHER ADMINISTRATIVE ACTION | +$250,000 | TAS::89 0328::TAS RECOVERY ELECTRICITY INFRASTRUCTURE ANALYSIS SUPPORT SERVICES ESPA AWARD DE-FE0004001 MOD 004 |
| November 20, 2009 | 3 | FUNDING ONLY ACTION | +$450,000 | INCREMENTAL FUNDING AND ADMIN CHANGE TO REFLECT FULL LIST OF APPROVED SUBCONTRACTORS. |
| September 28, 2009 | 2 | FUNDING ONLY ACTION | +$1,765,222 | INCREMENTAL FUNDING |
| August 16, 2009 | 1 | FUNDING ONLY ACTION | +$320,000 | INCFREMENTAL FUNDING ESPA SITE SUPPORT CONTRACT |
| August 13, 2009 | base | not on file | +$2,650,000 | ESPA SITE SUPPORT CONTRACT |