BOOZ ALLEN HAMILTON INC
Federal contract award, Booz Allen Hamilton, $22,861,331
Key CONT_AWD_KY07_9700_W15P7T10DD415_9700. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 497 days before this system saw it. One version on record.
Cite this row
553fab169c92d1f5cd6b1c23f001c8affe6703444255f8abd8dc7afbb65e7fd9The source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $22,861,331 | first version | August 27, 2015 | April 26, 2025 | 2026-09-05T00:52:06Z | historical sweep | 553fab169c92 |
Archived copy
None on file. An archived copy is optional corroboration and never a condition of this filing’s provenance, which is the stored response and its hash above; see the methodology page.
What the amount is made of
65 recorded actions, so the amount is the award's current total across all of them. 59 of them obligated money. Measured 2026-10-17, when USAspending reported a total obligation of $22,861,331.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| February 3, 2025 | 64 | FUNDING ONLY ACTION | −$17,291 | THIS TASK ORDER IS FOR CONTRACTOR PROVIDED TECHNICAL AND ENGINEERING SERVICES ASSOCIATED WITH ADVANCED CYBER ELECTROMAGNETIC ACTIVITIES. |
| May 1, 2024 | 63 | FUNDING ONLY ACTION | −$1,026 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS. |
| November 8, 2023 | 62 | FUNDING ONLY ACTION | −$304,853 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS. |
| August 22, 2023 | 61 | FUNDING ONLY ACTION | −$160 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS. |
| February 1, 2023 | 60 | FUNDING ONLY ACTION | −$91,858 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS. |
| April 26, 2022 | 59 | FUNDING ONLY ACTION | −$66,044 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS. |
| March 30, 2022 | 58 | FUNDING ONLY ACTION | −$417,390 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS |
| August 19, 2021 | 57 | FUNDING ONLY ACTION | −$20,161 | THE PURPOSE OF THIS MODIFICATION (57) IS TO DE-OBLIGATE FUNDS FROM TASK ORDER IN THE AMOUNT OF $20,161.37. |
| April 9, 2021 | 56 | FUNDING ONLY ACTION | −$169,825 | THE PURPOSE OF THIS MODIFICATION (56) IS TO DE-OBLIGATE FUNDS FROM TASK ORDER IN THE AMOUNT OF $169,824.54. |
| July 1, 2020 | 55 | FUNDING ONLY ACTION | −$390,823 | THE PURPOSE OF THIS MODIFICATION (55) IS TO DE-OBLIGATE FUNDS FROM OPTION G. |
| March 9, 2020 | 54 | FUNDING ONLY ACTION | +$1,372,185 | THE PURPOSE OF THIS MODIFICATION (54) IS TO INCREMENTALLY FUND OPTION F IN THE AMOUNT OF $1,372,184.63 FOR I2WD CYBER SUPPORT. |
| January 27, 2020 | 53 | FUNDING ONLY ACTION | +$519,053 | THE PURPOSE OF THIS MODIFICATION (53) IS TO INCREMENTALLY FUND OPTION F FOR I2WD DCO SUPPORT. |
| January 10, 2020 | 52 | FUNDING ONLY ACTION | +$376,664 | THE PURPOSE OF THIS MODIFICATION (52) IS TO INCREMENTALLY FUND OPTION F IN THE AMOUNT OF $376,663.58 FOR I2WD CYBER OCO MIRROR SUPPORT. |
| January 8, 2020 | 51 | OTHER ADMINISTRATIVE ACTION | no money | THE PURPOSE OF THIS MODIFICATION (51) IS TO REALIGN UNFUNDED OPTION G CEILING TO OPTION F. |
| December 4, 2019 | 50 | EXERCISE AN OPTION | no money | THE PURPOSE OF THIS MODIFICATION (50) IS TO EXERCISE OPTION F AND REALIGN FUNDS FROM OPTION G TO OPTION F. |
| October 30, 2019 | 49 | FUNDING ONLY ACTION | +$10,000 | THE PURPOSE OF THIS MODIFICATION (49) IS TO INCREMENTALLY FUND OPTION G TRAVEL, REALIGN MATERIAL CEILING TO TRAVEL CEILING, AND EXTEND SLINS PERIOD OF PERFORMANCE (POP) ON THE TASK ORDER THROUGH OCTOBER AND DECEMBER 2019. |
| August 16, 2019 | 48 | FUNDING ONLY ACTION | +$204,482 | THE PURPOSE OF THIS MODIFICATION (48) IS TO INCREMENTALLY FUND OPTION PERIOD (G) IN THE AMOUNT OF $204,481.52. |
| May 17, 2019 | 47 | FUNDING ONLY ACTION | +$1,211,758 | THE PURPOSE OF THIS MODIFICATION (47) IS TO INCREMENTALLY FUND OPTION PERIOD (G) IN THE AMOUNT OF $1,211,757.86. THIS ACTION INCREASES PREVIOUSLY FUNDED LABOR SLIN 7022AB TOTAL FUNDED AMOUNT IN SUPPORT OF I2WD DCO PHOENIX PROJECT. |
| May 9, 2019 | 46 | FUNDING ONLY ACTION | +$1,575,295 | THE PURPOSE OF THIS MODIFICATION (46) IS TO INCREMENTALLY FUND OPTION PERIOD (G) IN THE AMOUNT OF $1,575,294.91 FOR DCA PHOENIX SUPPORT. |
| April 17, 2019 | 45 | FUNDING ONLY ACTION | +$78,963 | THE PURPOSE OF THIS MODIFICATION (45) IS TO REVERSE DE-OBLIGATED FUNDS ON MOD (44) SLIN 7002AC IN THE AMOUNT OF $78,963.23. |
| April 5, 2019 | 44 | OTHER ADMINISTRATIVE ACTION | −$586,878 | THE PURPOSE OF THIS MODIFICATION (44) IS TO DE-OBLIGATE FUNDS FROM THE TASK ORDER IN THE AMOUNT OF ($586,878.43). |
| March 12, 2019 | 43 | FUNDING ONLY ACTION | −$400,000 | THE PURPOSE OF THIS MODIFICATION (43) IS TO DE-OBLIGATE FUNDS FROM THE TASK ORDER IN THE AMOUNT OF ($400,000.00), REALIGN FUNDS FROM MATERIAL TO TRAVEL, AND REALIGN $35,000.00 FROM OPTION G MATERIAL CEILING TO TRAVEL CEILING. |
| January 30, 2019 | 42 | FUNDING ONLY ACTION | +$679,463 | THE PURPOSE OF THIS MODIFICATION (42) IS TO INCREMENTALLY FUND THE TASK ORDER IN THE AMOUNT OF $679,462.59 AND REALIGN FUNDS FROM SLIN 7001AN (LABOR) TO 7002AD (MATERIAL), AND 7003AC (TRAVEL). ALL OF THE FUNDS ON PWD 7S8000637S WERE ERRONEOUSLY DESIGNATED AS ALL LABOR IN LIEU OF (LABOR, TRAVEL, AND MATERIAL). |
| December 7, 2018 | 41 | FUNDING ONLY ACTION | +$1,400 | THE PURPOSE OF THIS MODIFICATION (41) IS TO INCREMENTALLY FUND TASK ORDER IN THE AMOUNT OF $1,400.00 IN SUPPORT OF I2WD NETCOM/RADAR SUPPORT TRAVEL. |
| October 25, 2018 | 39 | FUNDING ONLY ACTION | +$98,448 | THE PURPOSE OF THIS MODIFICATION (39) IS TO INCREMENTALLY FUND THE TASK ORDER IN THE AMOUNT OF $98,447.95 IN SUPPORT OF I2WD TCSA AND RADAR EFFORT. |
| October 23, 2018 | 40 | FUNDING ONLY ACTION | no money | THE PURPOSE OF THIS MODIFICATION (40) IS TO REALIGN FUNDS FROM BASE INTO OPTION G IN THE AMOUNT OF $154,519.00 TO MEET MISSION REQUIREMENTS AND CORRECT MOD (38) OPTION G FUNDING SUMMARY PREVIOUSLY FUNDED AMOUNT. |
| September 28, 2018 | 38 | FUNDING ONLY ACTION | +$1,401,334 | THE PURPOSE OF THIS MODIFICATION (38) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $1,401,333.88 AND APPEND UPDATED PWS AND DD254 TO THE TASK ORDER. |
| August 28, 2018 | 37 | FUNDING ONLY ACTION | +$1,125,000 | THE PURPOSE OF THIS MODIFICATION (37) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $1,125,000.00, REALIGN $600,000 FROM LABOR TO MATERIAL CEILING, AND APPEND ENVEIL SOFTWARE END USER LICENSE AGREEMENT (EULA) TO THE TASK ORDER. |
| August 7, 2018 | 36 | FUNDING ONLY ACTION | +$920,000 | THE PURPOSE OF THIS MODIFICATION (36) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $920,000.00 TO SUPPORT I2WD CYBER ENGINEERING EFFORT. |
| July 18, 2018 | 35 | FUNDING ONLY ACTION | +$407,848 | THE PURPOSE OF THIS MODIFICATION (34) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $407,847.66 AND AMEND SLINS LINE OF ACCOUNTING (LOA). |
| June 29, 2018 | 34 | FUNDING ONLY ACTION | +$1,404,424 | THE PURPOSE OF THIS MODIFICATION (34) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $1,404,423.63 TO SUPPORT ARMY/I2WD CYBER SECURITY AND ENGINEERING PROGRAM. |
| June 5, 2018 | 33 | FUNDING ONLY ACTION | +$67,485 | THE PURPOSE OF THIS MODIFICATION (33) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $67,485.00 TO SUPPORT ARMY ADVANCED CYBER ELECTROMAGNETIC PROGRAM. |
| June 5, 2018 | 32 | EXERCISE AN OPTION | +$506,000 | THE PURPOSE OF THIS MODIFICATION (32) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $506,000.00 AND EXERCISE OPTION G. |
| May 21, 2018 | 31 | FUNDING ONLY ACTION | +$695,446 | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $695,445.89 AND REALIGN TRAVEL CEILING TO LABOR IN SUPPORT OF I2WD ADVANCED CYBER ELECTROMAGNETIC ACTIVITIES (CEMA) ENGINEERING(ACE) PROGRAM. |
| May 11, 2018 | 30 | FUNDING ONLY ACTION | +$640,427 | THE PURPOSE OF THIS MODIFICATION (30) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $640,426.59 TO SUPPORT I2WD RADAR PROGRAM. |
| April 27, 2018 | 29 | FUNDING ONLY ACTION | +$198,474 | THE PURPOSE OF THIS MODIFICATION (29) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $198,473.71. |
| April 13, 2018 | 28 | FUNDING ONLY ACTION | +$260,000 | THE PURPOSE OF THIS MODIFICATION (28) IS TO INCREMENTALLY FUND THE TASK ORDER IN THE AMOUNT OF $260,000.00 TO SUPPORT ADVANCED CYBER RADAR SUPPORT. |
| March 27, 2018 | 27 | FUNDING ONLY ACTION | +$45,379 | THE PURPOSE OF THIS MODIFICATION (27) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $45,379.18 TO SUPPORT I2WD CYBER RADAR PROGRAM. |
| February 23, 2018 | 26 | FUNDING ONLY ACTION | +$216,155 | THE PURPOSE OF THIS MODIFICATION (26) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $216,155.17 AND RENAME SLIN 0002AJ AS MATERIAL TO SUPPORT I2WD RADAR SYSTEMS AND IDENTIFICATION PROGRAM. |
| January 31, 2018 | 25 | FUNDING ONLY ACTION | +$335,043 | THE PURPOSE OF THIS MODIFICATION (25) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $335,043.00 AND APPEND WAGE DETERMINATION FOR THE FOLLOWING COUNTIES HARFORD, MD, FAIRFAX, VA, AND CAMDEN, NJ. |
| December 13, 2017 | 24 | FUNDING ONLY ACTION | +$48,951 | THE PURPOSE OF THIS MODIFICATION (24) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $48,950.90 FOR I2WD ADVANCED CYBER AND RADAR SUPPORT. |
| December 1, 2017 | 23 | CHANGE ORDER | no money | THE PURPOSE OF THIS MODIFICATION (23) IS TO APPEND ATLASSIAN GOVERNMENT END USER LICENSE AGREEMENT (EULA) TO THE CONTRACT. |
| November 22, 2017 | 22 | FUNDING ONLY ACTION | +$228,000 | THE PURPOSE OF THIS MODIFICATION (22) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $228,000.00 AND CHANGE BOOZ ALLEN HAMILTON (BAH) PAYING AND ADMINISTRATION OFFICES. PURSUANT TO DCMA GENERAL ORDER FY17-28, DATED 03 APRIL 2017, CAGE CODE 17038 ADMINISTRATION TRANSFERS FROM DCMA MANASSAS, VA TO DCMA SPRINGFIELD, NJ. |
| November 8, 2017 | 21 | FUNDING ONLY ACTION | +$716,914 | THE PURPOSE OF THIS MODIFICATION (21) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $716,914.00 AND APPEND REVISED PERFORMANCE WORK STATEMENT (PWS) AND CONTRACT SECURITY CLASSIFICATION SPECIFICATION (DD254) TO THE CONTRACT TO SUPPORT I2WD ADVANCED CYBER/RADAR PROGRAM. |
| November 3, 2017 | 20 | FUNDING ONLY ACTION | +$277,388 | THE PURPOSE OF THIS MODIFICATION (20) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $277,388.00 AND APPEND VEEAM END USER LICENSE AGREEMENT (EULA) TO THE CONTRACT TO SUPPORT I2WD ADVANCED CYBER PROGRAM. |
| September 28, 2017 | 19 | FUNDING ONLY ACTION | +$335,436 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (19) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $335,436.00 AND APPEND MAGICDRAW END USER LICENSE AGREEMENT (EULA)TO THE CONTRACT. TO SUPPORT I2WD ADVANCED CYBER ELECTROMAGNETIC ACTIVITIES (CEMA) ENGINEERING. |
| August 25, 2017 | 18 | FUNDING ONLY ACTION | +$378,927 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (18) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $378,927.00 AND EXTEND BASE PERIOD SLINS PERIOD OF PERFORMANCE (POP)TO SUPPORT I2WD ADVANCED CYBER ELECTROMAGNETIC ACTIVITIES (CEMA) ENGINEERING. |
| July 26, 2017 | 17 | FUNDING ONLY ACTION | +$994,725 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (17) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $994,724.83 AND REALIGN FUNDS FROM MATERIAL TO TRAVEL TO SUPPORT I2WD'S ADVANCED CYBER ELECTROMAGNETIC ACTIVITIES (CEMA) ENGINEERING. |
| June 22, 2017 | 16 | FUNDING ONLY ACTION | +$674,575 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (16) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $674,575.00 TO SUPPORT ARMY'S CYBER ELECTROMAGNETIC ACTIVITIES ENGINEERING. |
| May 31, 2017 | 15 | FUNDING ONLY ACTION | +$250,000 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (15) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $250,000.00 TO SUPPORT ARMY'S CYBER ELECTROMAGNETIC ACTIVITIES ENGINEERING. |
| April 7, 2017 | 14 | FUNDING ONLY ACTION | +$694,005 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (14) IS TO INCREMENTALLY FUND TASK ORDER KY07 TACTICAL CEMA SUPPORT ARCHITECTURE (TCSA) DEVELOPMENT IN THE AMOUNT OF $694,005.00 IAW FAR 52.232-22 "LIMITATIONS OF FUNDS" |
| February 7, 2017 | 13 | FUNDING ONLY ACTION | no money | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (13) IS TO REALIGN FUNDS FROM TRAVEL TO MATERIAL TO MEET MISION REQUIREMENTS IN THE AMOUNT OF $5,000.00 IAW FAR 52.232-22 "LIMITATIONS OF FUNDS" |
| February 3, 2017 | 12 | FUNDING ONLY ACTION | +$650,000 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (12) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $650,000.00. |
| December 14, 2016 | 11 | FUNDING ONLY ACTION | +$75,000 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (11) IS TO INCREMENTALLY FUND THE BASE PERIOD IN THE CUMULATIVE AMOUNT OF $75,000.00. |
| October 31, 2016 | 10 | FUNDING ONLY ACTION | +$579,405 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (10) IS TO INCREMENTALLY FUND THE BASE PERIOD IN THE CUMULATIVE AMOUNT OF $579,405.43 IAW FAR 52.232- 22 "LIMITATIONS OF FUNDS" |
| September 26, 2016 | 9 | CHANGE ORDER | no money | IGF::OT::IGF THE PURPOSE OF THIS MOD (09) IS TO EXTEND SELECTED BASE PERIOD SLINS THROUGH SEPTEMBER 30, 2017, TO ALIGN WITH MISSION REQUIREMENTS AND BASE PERIOD OF PERFORMANCE. |
| September 1, 2016 | 8 | FUNDING ONLY ACTION | +$300,000 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (08) IS TO INCREMENTALLY FUND THE BASE PERIOD IN THE AMOUNT OF $300,000.00. |
| August 17, 2016 | 7 | FUNDING ONLY ACTION | +$162,000 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (07) IS TO INCREMENTALLY FUND BASE PERIOD IN THE AMOUNT OF $162,000.00. |
| July 21, 2016 | 6 | FUNDING ONLY ACTION | +$290,000 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (06) IS TO INCREMENTALLY FUND THE BASE PERIOD IN THE AMOUNT OF $290,000.00 AND APPEND DD254 TO THE CONTRACT. |
| April 29, 2016 | 5 | FUNDING ONLY ACTION | +$148,000 | IGF::OT::IGF THE PURPOSE OF MODIFICATION (05) IS TO INCREMENTALLY FUND BASE TO IN THE AMOUNT OF $148,000.00. |
| March 10, 2016 | 4 | FUNDING ONLY ACTION | +$425,000 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (04) IS TO INCREMENTALLY FUND TASK ORDER KY07 IN ACCORDANCE WITH FAR 52.232-22(B) AND TO CHANGE THE TECHNICAL POINT OF CONTACT (TPOC) IN ACCORDANCE WITH FAR 52.243-2. 2. THE FOLLOWING SLIN IS HEREBY ADDED TO PROVIDE FUNDING FOR THE BASE PERIOD. SLIN PWD AMOUNT DESCRIPTION 0001AH 1G6R1391CV $ 400,000.00 FY16 RDT&E LABOR 0002AC 1G6R1391CV $ 25,000.00 FY16 RDT&E MAT'LS |
| February 19, 2016 | 3 | FUNDING ONLY ACTION | +$1,419,000 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (03) IS TO INCREMENTALLY FUND TASK ORDER KY07 IN ACCORDANCE WITH FAR 52.232-22. |
| January 29, 2016 | 2 | FUNDING ONLY ACTION | +$100,000 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (02) IS TO ADD FUNDING TO SLIN 0001AD AND TO CORRECT LABOR FUNDING FOR SLIN 0001AC IN ACCORDANCE WITH FAR 52.232-22. 2. THE FOLLOWING SLIN IS HEREBY ADDED TO PROVIDE FUNDING FOR THE BASE PERIOD. SLIN PWD AMOUNT DESCRIPTION 0001AD 1G6R1249CV $ 100,000.00 FY 16 RDT&E *NOTE: TRAVEL, MATERIAL, AND ODC CLINS SHALL NOT HAVE FEE APPLIED. 3. DUE TO A PRIOR ADMINISTRATIVE ERROR, THE AMOUNT IN SECTION A OF MODIFICATION (1) IS HEREBY CHANGE FOR THE FOLLOWING SLIN. SECTION B OF MODIFICATION (1) WAS NOT IMPACTED. SLIN FROM TO . 0001AC $139,591.90 $139,591.88 |
| November 6, 2015 | 1 | FUNDING ONLY ACTION | +$159,592 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (01) IS TO ADD FUNDING IN ACCORDANCE WITH FAR 52.232-22 |
| August 27, 2015 | base | not on file | +$2,070,000 | IGF::OT::IGF THIS PERFORMANCE-BASED TASK ORDER, W15P7T-10-D-D415-KY08, ENTITLED "ADVANCED CYBER ELECTROMAGNETIC ACTIVITIES (CEMA) ENGINEERING (ACE)," IS ISSUED ON A COST-PLUS-FIXED-FEE (CPFF) BASIS IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT W15P7T-10-D-D415 AND MODIFICATIONS THERETO. THE R23G ORDER NUMBER ASSOCIATED WITH THIS TASK IS R23G-0821, SOLICITATION NUMBER W56KGU-15-R-0008. |
Last refreshed November 4, 2026 at 2:31 PM UTC.