BOOZ ALLEN HAMILTON INC

Federal contract award, Booz Allen Hamilton, $22,861,331

Key CONT_AWD_KY07_9700_W15P7T10DD415_9700. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 497 days before this system saw it. One version on record.

Cite this row

On this site https://evidence.ourrevolution.media/filings/booz-allen-hamilton/CONT_AWD_KY07_9700_W15P7T10DD415_9700
At the source https://www.usaspending.gov/award/CONT_AWD_KY07_9700_W15P7T10DD415_9700
Observed 2026-09-05, version 1, retrieved 2026-09-05T00:52:06Z
Content hash 553fab169c92d1f5cd6b1c23f001c8affe6703444255f8abd8dc7afbb65e7fd9

The source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.

Versions

VersionAmountChangeOccurredPublishedRetrievedHow it arrivedContent hash
1
current
$22,861,331first versionAugust 27, 2015April 26, 20252026-09-05T00:52:06Zhistorical sweep553fab169c92

Archived copy

None on file. An archived copy is optional corroboration and never a condition of this filing’s provenance, which is the stored response and its hash above; see the methodology page.

What the amount is made of

65 recorded actions, so the amount is the award's current total across all of them. 59 of them obligated money. Measured 2026-10-17, when USAspending reported a total obligation of $22,861,331.

Action dateModificationTypeObligatedDescription as recorded
February 3, 202564FUNDING ONLY ACTION−$17,291THIS TASK ORDER IS FOR CONTRACTOR PROVIDED TECHNICAL AND ENGINEERING SERVICES ASSOCIATED WITH ADVANCED CYBER ELECTROMAGNETIC ACTIVITIES.
May 1, 202463FUNDING ONLY ACTION−$1,026THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS.
November 8, 202362FUNDING ONLY ACTION−$304,853THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS.
August 22, 202361FUNDING ONLY ACTION−$160THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS.
February 1, 202360FUNDING ONLY ACTION−$91,858THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS.
April 26, 202259FUNDING ONLY ACTION−$66,044THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS.
March 30, 202258FUNDING ONLY ACTION−$417,390THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS
August 19, 202157FUNDING ONLY ACTION−$20,161THE PURPOSE OF THIS MODIFICATION (57) IS TO DE-OBLIGATE FUNDS FROM TASK ORDER IN THE AMOUNT OF $20,161.37.
April 9, 202156FUNDING ONLY ACTION−$169,825THE PURPOSE OF THIS MODIFICATION (56) IS TO DE-OBLIGATE FUNDS FROM TASK ORDER IN THE AMOUNT OF $169,824.54.
July 1, 202055FUNDING ONLY ACTION−$390,823THE PURPOSE OF THIS MODIFICATION (55) IS TO DE-OBLIGATE FUNDS FROM OPTION G.
March 9, 202054FUNDING ONLY ACTION+$1,372,185THE PURPOSE OF THIS MODIFICATION (54) IS TO INCREMENTALLY FUND OPTION F IN THE AMOUNT OF $1,372,184.63 FOR I2WD CYBER SUPPORT.
January 27, 202053FUNDING ONLY ACTION+$519,053THE PURPOSE OF THIS MODIFICATION (53) IS TO INCREMENTALLY FUND OPTION F FOR I2WD DCO SUPPORT.
January 10, 202052FUNDING ONLY ACTION+$376,664THE PURPOSE OF THIS MODIFICATION (52) IS TO INCREMENTALLY FUND OPTION F IN THE AMOUNT OF $376,663.58 FOR I2WD CYBER OCO MIRROR SUPPORT.
January 8, 202051OTHER ADMINISTRATIVE ACTIONno moneyTHE PURPOSE OF THIS MODIFICATION (51) IS TO REALIGN UNFUNDED OPTION G CEILING TO OPTION F.
December 4, 201950EXERCISE AN OPTIONno moneyTHE PURPOSE OF THIS MODIFICATION (50) IS TO EXERCISE OPTION F AND REALIGN FUNDS FROM OPTION G TO OPTION F.
October 30, 201949FUNDING ONLY ACTION+$10,000THE PURPOSE OF THIS MODIFICATION (49) IS TO INCREMENTALLY FUND OPTION G TRAVEL, REALIGN MATERIAL CEILING TO TRAVEL CEILING, AND EXTEND SLINS PERIOD OF PERFORMANCE (POP) ON THE TASK ORDER THROUGH OCTOBER AND DECEMBER 2019.
August 16, 201948FUNDING ONLY ACTION+$204,482THE PURPOSE OF THIS MODIFICATION (48) IS TO INCREMENTALLY FUND OPTION PERIOD (G) IN THE AMOUNT OF $204,481.52.
May 17, 201947FUNDING ONLY ACTION+$1,211,758THE PURPOSE OF THIS MODIFICATION (47) IS TO INCREMENTALLY FUND OPTION PERIOD (G) IN THE AMOUNT OF $1,211,757.86. THIS ACTION INCREASES PREVIOUSLY FUNDED LABOR SLIN 7022AB TOTAL FUNDED AMOUNT IN SUPPORT OF I2WD DCO PHOENIX PROJECT.
May 9, 201946FUNDING ONLY ACTION+$1,575,295THE PURPOSE OF THIS MODIFICATION (46) IS TO INCREMENTALLY FUND OPTION PERIOD (G) IN THE AMOUNT OF $1,575,294.91 FOR DCA PHOENIX SUPPORT.
April 17, 201945FUNDING ONLY ACTION+$78,963THE PURPOSE OF THIS MODIFICATION (45) IS TO REVERSE DE-OBLIGATED FUNDS ON MOD (44) SLIN 7002AC IN THE AMOUNT OF $78,963.23.
April 5, 201944OTHER ADMINISTRATIVE ACTION−$586,878THE PURPOSE OF THIS MODIFICATION (44) IS TO DE-OBLIGATE FUNDS FROM THE TASK ORDER IN THE AMOUNT OF ($586,878.43).
March 12, 201943FUNDING ONLY ACTION−$400,000THE PURPOSE OF THIS MODIFICATION (43) IS TO DE-OBLIGATE FUNDS FROM THE TASK ORDER IN THE AMOUNT OF ($400,000.00), REALIGN FUNDS FROM MATERIAL TO TRAVEL, AND REALIGN $35,000.00 FROM OPTION G MATERIAL CEILING TO TRAVEL CEILING.
January 30, 201942FUNDING ONLY ACTION+$679,463THE PURPOSE OF THIS MODIFICATION (42) IS TO INCREMENTALLY FUND THE TASK ORDER IN THE AMOUNT OF $679,462.59 AND REALIGN FUNDS FROM SLIN 7001AN (LABOR) TO 7002AD (MATERIAL), AND 7003AC (TRAVEL). ALL OF THE FUNDS ON PWD 7S8000637S WERE ERRONEOUSLY DESIGNATED AS ALL LABOR IN LIEU OF (LABOR, TRAVEL, AND MATERIAL).
December 7, 201841FUNDING ONLY ACTION+$1,400THE PURPOSE OF THIS MODIFICATION (41) IS TO INCREMENTALLY FUND TASK ORDER IN THE AMOUNT OF $1,400.00 IN SUPPORT OF I2WD NETCOM/RADAR SUPPORT TRAVEL.
October 25, 201839FUNDING ONLY ACTION+$98,448THE PURPOSE OF THIS MODIFICATION (39) IS TO INCREMENTALLY FUND THE TASK ORDER IN THE AMOUNT OF $98,447.95 IN SUPPORT OF I2WD TCSA AND RADAR EFFORT.
October 23, 201840FUNDING ONLY ACTIONno moneyTHE PURPOSE OF THIS MODIFICATION (40) IS TO REALIGN FUNDS FROM BASE INTO OPTION G IN THE AMOUNT OF $154,519.00 TO MEET MISSION REQUIREMENTS AND CORRECT MOD (38) OPTION G FUNDING SUMMARY PREVIOUSLY FUNDED AMOUNT.
September 28, 201838FUNDING ONLY ACTION+$1,401,334THE PURPOSE OF THIS MODIFICATION (38) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $1,401,333.88 AND APPEND UPDATED PWS AND DD254 TO THE TASK ORDER.
August 28, 201837FUNDING ONLY ACTION+$1,125,000THE PURPOSE OF THIS MODIFICATION (37) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $1,125,000.00, REALIGN $600,000 FROM LABOR TO MATERIAL CEILING, AND APPEND ENVEIL SOFTWARE END USER LICENSE AGREEMENT (EULA) TO THE TASK ORDER.
August 7, 201836FUNDING ONLY ACTION+$920,000THE PURPOSE OF THIS MODIFICATION (36) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $920,000.00 TO SUPPORT I2WD CYBER ENGINEERING EFFORT.
July 18, 201835FUNDING ONLY ACTION+$407,848THE PURPOSE OF THIS MODIFICATION (34) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $407,847.66 AND AMEND SLINS LINE OF ACCOUNTING (LOA).
June 29, 201834FUNDING ONLY ACTION+$1,404,424THE PURPOSE OF THIS MODIFICATION (34) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $1,404,423.63 TO SUPPORT ARMY/I2WD CYBER SECURITY AND ENGINEERING PROGRAM.
June 5, 201833FUNDING ONLY ACTION+$67,485THE PURPOSE OF THIS MODIFICATION (33) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $67,485.00 TO SUPPORT ARMY ADVANCED CYBER ELECTROMAGNETIC PROGRAM.
June 5, 201832EXERCISE AN OPTION+$506,000THE PURPOSE OF THIS MODIFICATION (32) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $506,000.00 AND EXERCISE OPTION G.
May 21, 201831FUNDING ONLY ACTION+$695,446THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $695,445.89 AND REALIGN TRAVEL CEILING TO LABOR IN SUPPORT OF I2WD ADVANCED CYBER ELECTROMAGNETIC ACTIVITIES (CEMA) ENGINEERING(ACE) PROGRAM.
May 11, 201830FUNDING ONLY ACTION+$640,427THE PURPOSE OF THIS MODIFICATION (30) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $640,426.59 TO SUPPORT I2WD RADAR PROGRAM.
April 27, 201829FUNDING ONLY ACTION+$198,474THE PURPOSE OF THIS MODIFICATION (29) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $198,473.71.
April 13, 201828FUNDING ONLY ACTION+$260,000THE PURPOSE OF THIS MODIFICATION (28) IS TO INCREMENTALLY FUND THE TASK ORDER IN THE AMOUNT OF $260,000.00 TO SUPPORT ADVANCED CYBER RADAR SUPPORT.
March 27, 201827FUNDING ONLY ACTION+$45,379THE PURPOSE OF THIS MODIFICATION (27) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $45,379.18 TO SUPPORT I2WD CYBER RADAR PROGRAM.
February 23, 201826FUNDING ONLY ACTION+$216,155THE PURPOSE OF THIS MODIFICATION (26) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $216,155.17 AND RENAME SLIN 0002AJ AS MATERIAL TO SUPPORT I2WD RADAR SYSTEMS AND IDENTIFICATION PROGRAM.
January 31, 201825FUNDING ONLY ACTION+$335,043THE PURPOSE OF THIS MODIFICATION (25) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $335,043.00 AND APPEND WAGE DETERMINATION FOR THE FOLLOWING COUNTIES HARFORD, MD, FAIRFAX, VA, AND CAMDEN, NJ.
December 13, 201724FUNDING ONLY ACTION+$48,951THE PURPOSE OF THIS MODIFICATION (24) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $48,950.90 FOR I2WD ADVANCED CYBER AND RADAR SUPPORT.
December 1, 201723CHANGE ORDERno moneyTHE PURPOSE OF THIS MODIFICATION (23) IS TO APPEND ATLASSIAN GOVERNMENT END USER LICENSE AGREEMENT (EULA) TO THE CONTRACT.
November 22, 201722FUNDING ONLY ACTION+$228,000THE PURPOSE OF THIS MODIFICATION (22) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $228,000.00 AND CHANGE BOOZ ALLEN HAMILTON (BAH) PAYING AND ADMINISTRATION OFFICES. PURSUANT TO DCMA GENERAL ORDER FY17-28, DATED 03 APRIL 2017, CAGE CODE 17038 ADMINISTRATION TRANSFERS FROM DCMA MANASSAS, VA TO DCMA SPRINGFIELD, NJ.
November 8, 201721FUNDING ONLY ACTION+$716,914THE PURPOSE OF THIS MODIFICATION (21) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $716,914.00 AND APPEND REVISED PERFORMANCE WORK STATEMENT (PWS) AND CONTRACT SECURITY CLASSIFICATION SPECIFICATION (DD254) TO THE CONTRACT TO SUPPORT I2WD ADVANCED CYBER/RADAR PROGRAM.
November 3, 201720FUNDING ONLY ACTION+$277,388THE PURPOSE OF THIS MODIFICATION (20) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $277,388.00 AND APPEND VEEAM END USER LICENSE AGREEMENT (EULA) TO THE CONTRACT TO SUPPORT I2WD ADVANCED CYBER PROGRAM.
September 28, 201719FUNDING ONLY ACTION+$335,436IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (19) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $335,436.00 AND APPEND MAGICDRAW END USER LICENSE AGREEMENT (EULA)TO THE CONTRACT. TO SUPPORT I2WD ADVANCED CYBER ELECTROMAGNETIC ACTIVITIES (CEMA) ENGINEERING.
August 25, 201718FUNDING ONLY ACTION+$378,927IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (18) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $378,927.00 AND EXTEND BASE PERIOD SLINS PERIOD OF PERFORMANCE (POP)TO SUPPORT I2WD ADVANCED CYBER ELECTROMAGNETIC ACTIVITIES (CEMA) ENGINEERING.
July 26, 201717FUNDING ONLY ACTION+$994,725IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (17) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $994,724.83 AND REALIGN FUNDS FROM MATERIAL TO TRAVEL TO SUPPORT I2WD'S ADVANCED CYBER ELECTROMAGNETIC ACTIVITIES (CEMA) ENGINEERING.
June 22, 201716FUNDING ONLY ACTION+$674,575IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (16) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $674,575.00 TO SUPPORT ARMY'S CYBER ELECTROMAGNETIC ACTIVITIES ENGINEERING.
May 31, 201715FUNDING ONLY ACTION+$250,000IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (15) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $250,000.00 TO SUPPORT ARMY'S CYBER ELECTROMAGNETIC ACTIVITIES ENGINEERING.
April 7, 201714FUNDING ONLY ACTION+$694,005IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (14) IS TO INCREMENTALLY FUND TASK ORDER KY07 TACTICAL CEMA SUPPORT ARCHITECTURE (TCSA) DEVELOPMENT IN THE AMOUNT OF $694,005.00 IAW FAR 52.232-22 "LIMITATIONS OF FUNDS"
February 7, 201713FUNDING ONLY ACTIONno moneyIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (13) IS TO REALIGN FUNDS FROM TRAVEL TO MATERIAL TO MEET MISION REQUIREMENTS IN THE AMOUNT OF $5,000.00 IAW FAR 52.232-22 "LIMITATIONS OF FUNDS"
February 3, 201712FUNDING ONLY ACTION+$650,000IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (12) IS TO INCREMENTALLY FUND THE CONTRACT IN THE AMOUNT OF $650,000.00.
December 14, 201611FUNDING ONLY ACTION+$75,000IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (11) IS TO INCREMENTALLY FUND THE BASE PERIOD IN THE CUMULATIVE AMOUNT OF $75,000.00.
October 31, 201610FUNDING ONLY ACTION+$579,405IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (10) IS TO INCREMENTALLY FUND THE BASE PERIOD IN THE CUMULATIVE AMOUNT OF $579,405.43 IAW FAR 52.232- 22 "LIMITATIONS OF FUNDS"
September 26, 20169CHANGE ORDERno moneyIGF::OT::IGF THE PURPOSE OF THIS MOD (09) IS TO EXTEND SELECTED BASE PERIOD SLINS THROUGH SEPTEMBER 30, 2017, TO ALIGN WITH MISSION REQUIREMENTS AND BASE PERIOD OF PERFORMANCE.
September 1, 20168FUNDING ONLY ACTION+$300,000IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (08) IS TO INCREMENTALLY FUND THE BASE PERIOD IN THE AMOUNT OF $300,000.00.
August 17, 20167FUNDING ONLY ACTION+$162,000IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (07) IS TO INCREMENTALLY FUND BASE PERIOD IN THE AMOUNT OF $162,000.00.
July 21, 20166FUNDING ONLY ACTION+$290,000IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (06) IS TO INCREMENTALLY FUND THE BASE PERIOD IN THE AMOUNT OF $290,000.00 AND APPEND DD254 TO THE CONTRACT.
April 29, 20165FUNDING ONLY ACTION+$148,000IGF::OT::IGF THE PURPOSE OF MODIFICATION (05) IS TO INCREMENTALLY FUND BASE TO IN THE AMOUNT OF $148,000.00.
March 10, 20164FUNDING ONLY ACTION+$425,000IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (04) IS TO INCREMENTALLY FUND TASK ORDER KY07 IN ACCORDANCE WITH FAR 52.232-22(B) AND TO CHANGE THE TECHNICAL POINT OF CONTACT (TPOC) IN ACCORDANCE WITH FAR 52.243-2. 2. THE FOLLOWING SLIN IS HEREBY ADDED TO PROVIDE FUNDING FOR THE BASE PERIOD. SLIN PWD AMOUNT DESCRIPTION 0001AH 1G6R1391CV $ 400,000.00 FY16 RDT&E LABOR 0002AC 1G6R1391CV $ 25,000.00 FY16 RDT&E MAT'LS
February 19, 20163FUNDING ONLY ACTION+$1,419,000IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (03) IS TO INCREMENTALLY FUND TASK ORDER KY07 IN ACCORDANCE WITH FAR 52.232-22.
January 29, 20162FUNDING ONLY ACTION+$100,000IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (02) IS TO ADD FUNDING TO SLIN 0001AD AND TO CORRECT LABOR FUNDING FOR SLIN 0001AC IN ACCORDANCE WITH FAR 52.232-22. 2. THE FOLLOWING SLIN IS HEREBY ADDED TO PROVIDE FUNDING FOR THE BASE PERIOD. SLIN PWD AMOUNT DESCRIPTION 0001AD 1G6R1249CV $ 100,000.00 FY 16 RDT&E *NOTE: TRAVEL, MATERIAL, AND ODC CLINS SHALL NOT HAVE FEE APPLIED. 3. DUE TO A PRIOR ADMINISTRATIVE ERROR, THE AMOUNT IN SECTION A OF MODIFICATION (1) IS HEREBY CHANGE FOR THE FOLLOWING SLIN. SECTION B OF MODIFICATION (1) WAS NOT IMPACTED. SLIN FROM TO . 0001AC $139,591.90 $139,591.88
November 6, 20151FUNDING ONLY ACTION+$159,592IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION (01) IS TO ADD FUNDING IN ACCORDANCE WITH FAR 52.232-22
August 27, 2015basenot on file+$2,070,000IGF::OT::IGF THIS PERFORMANCE-BASED TASK ORDER, W15P7T-10-D-D415-KY08, ENTITLED "ADVANCED CYBER ELECTROMAGNETIC ACTIVITIES (CEMA) ENGINEERING (ACE)," IS ISSUED ON A COST-PLUS-FIXED-FEE (CPFF) BASIS IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF CONTRACT W15P7T-10-D-D415 AND MODIFICATIONS THERETO. THE R23G ORDER NUMBER ASSOCIATED WITH THIS TASK IS R23G-0821, SOLICITATION NUMBER W56KGU-15-R-0008.

Last refreshed November 4, 2026 at 2:31 PM UTC.