| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $93,386,105 | first version | June 12, 2018 | March 31, 2026 | 2026-09-05T00:51:37Z | historical sweep | 5f4cd144e884 |
Archived copy
None on file. An archived copy is optional corroboration and never a condition of this filing’s provenance, which is the stored response and its hash above; see the methodology page.
What the amount is made of
139 recorded actions, so the amount is the award's current total across all of them. 123 of them obligated money. Measured 2026-10-18, when USAspending reported a total obligation of $93,386,105.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| March 31, 2026 | P00138 | FUNDING ONLY ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| February 6, 2026 | P00137 | FUNDING ONLY ACTION | −$3,750 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 28, 2025 | P00136 | FUNDING ONLY ACTION | −$1,284 | SUPPORT FOR SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS, SYSTEMS ACQUISITION PLANNING, INTEGRATED PROJECT MANAGEMENT, AND ANALYTICS SERVICES FOR DIFFERENT DEVELOPMENT STAGES. |
| April 21, 2025 | P00135 | FUNDING ONLY ACTION | −$3,250 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| April 8, 2025 | P00134 | FUNDING ONLY ACTION | −$20,687 | THE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO DEOBLIGATE FUNDING FROM CLINS 7507, 7707 AND 9707. |
| April 7, 2025 | P00133 | FUNDING ONLY ACTION | −$28,991 | THE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO DEOBLIAGTE FUNDING. |
| March 13, 2025 | P00132 | FUNDING ONLY ACTION | −$8,868 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| February 10, 2025 | P00131 | FUNDING ONLY ACTION | −$22,754 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| January 30, 2025 | P00130 | FUNDING ONLY ACTION | −$16,194 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 19, 2024 | P00129 | FUNDING ONLY ACTION | −$1,200 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 3, 2024 | P00128 | FUNDING ONLY ACTION | −$106 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| April 9, 2024 | P00127 | FUNDING ONLY ACTION | −$8,745 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 27, 2023 | P00126 | FUNDING ONLY ACTION | −$3,820 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 13, 2023 | P00125 | FUNDING ONLY ACTION | −$11,869 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 30, 2023 | P00124 | FUNDING ONLY ACTION | −$32,494 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| April 18, 2023 | P00123 | FUNDING ONLY ACTION | −$3,000 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| March 29, 2023 | P00122 | FUNDING ONLY ACTION | −$1,164 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| January 3, 2023 | P00121 | FUNDING ONLY ACTION | −$21,683 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| November 3, 2022 | P00120 | FUNDING ONLY ACTION | −$8,335 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| October 11, 2022 | P00119 | FUNDING ONLY ACTION | −$3,500 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| August 10, 2022 | P00118 | FUNDING ONLY ACTION | −$115,786 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 28, 2022 | P00117 | FUNDING ONLY ACTION | −$20,895 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 25, 2022 | P00116 | FUNDING ONLY ACTION | −$25,358 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| June 16, 2022 | P00115 | FUNDING ONLY ACTION | −$42,899 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 25, 2022 | P00114 | FUNDING ONLY ACTION | −$30,154 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 13, 2022 | P00113 | FUNDING ONLY ACTION | −$24,514 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 2, 2022 | P00112 | FUNDING ONLY ACTION | −$193,566 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| April 19, 2022 | P00111 | FUNDING ONLY ACTION | −$9,429 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| March 25, 2022 | P00110 | FUNDING ONLY ACTION | −$127,914 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| March 21, 2022 | P00109 | FUNDING ONLY ACTION | −$934,576 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| March 14, 2022 | P00108 | FUNDING ONLY ACTION | −$66,706 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| February 24, 2022 | P00107 | FUNDING ONLY ACTION | +$3,209 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| February 10, 2022 | P00106 | FUNDING ONLY ACTION | +$463,697 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| February 2, 2022 | P00105 | FUNDING ONLY ACTION | +$56,106 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| January 11, 2022 | P00104 | FUNDING ONLY ACTION | +$137,792 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| January 10, 2022 | P00103 | FUNDING ONLY ACTION | +$230,363 | PR 1300934373-0002:SLIN 770776 WAS INCREMENTALLY FUNDED BY $7,575.00 PR 1300934374-0002:SLIN 770771 WAS INCREMENTALLY FUNDED BY $5,858.17 PR 1300936883-0001:SLIN 770536 WAS CREATED INCREMENTALLY FUNDED BY $7,461.23 PR 1300936884-0001:SLIN 700509 WAS INCREMENTALLY FUNDED BY $26,812.94 PR 1300937332-0001:SLIN 770777 WAS INCREMENTALLY FUNDED BY $15,232,65 PR 1300937459-0001:SLIN770524 WAS INCREMENTALLY FUNDED BY $32,394.81 |
| December 27, 2021 | P00102 | FUNDING ONLY ACTION | +$2,230,541 | PR 1300936768-0001:SLIN 770407 WAS INCREMENTALLY FUNDED BY $9,162.57 PR 1300937094-0002:SLIN 770534 WAS CREATED AND INCREMENTALLY FUNDED BY $117,167.98 PR 1300937162-0001:SLIN 770512 WAS INCREMENTALLY FUNDED BY $8,805.25 PR 1300940940-0004:SLIN 700001 WAS INCREMENTALLY FUNDED BY $460,000.00 PR 1300941001-0001:SLIN 770404 WAS INCREMENTALLY FUNDED BY $12,287,75 PR 1300941003-0001:SLIN770516 WAS INCREMENTALLY FUNDED BY $16,500.00 |
| December 17, 2021 | P00101 | FUNDING ONLY ACTION | −$41,165 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| December 9, 2021 | P00100 | FUNDING ONLY ACTION | +$395,095 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| December 3, 2021 | P00099 | FUNDING ONLY ACTION | +$302,059 | PR 1300937179-0111 INCREMENTALLY FUND SLIN 7707/64 PR 1300937335-0002 INCREMENTALLY FUND SLIN 7707/65 PR 1300937483-0001 INCREMENTALLY FUND SLINS 7707/66 |
| November 29, 2021 | P00098 | FUNDING ONLY ACTION | −$37,146 | PR 1300937166-0001 FUND SLIN 770514 (ACRN VY), TDL #3225R1 FROM 15,570.82 BY 16,262.09 TO $31,832.91. PR 1300937333-0004 CREATE NEXT SEQUENTIAL SLIN 770762 (ACRN ZA), TDL #3428R2 AND FUND $48,000. PR 1300940940-0002 FUND SLIN 770001 (ACRN VP), TDL #3002R1 FROM $1,671,170.00 BY $396,000 TO $2,067,170.00 PR 1300944239-0001 CREATE NEXT SEQUENTIAL SLIN (ACRN ZB), TDL #3415R2 770763 AND FUND $4,622.25 |
| November 15, 2021 | P00097 | FUNDING ONLY ACTION | +$464,884 | CLIN NUMBER-NEW CEILING AFTER REALIGNMENT 7000- $10,807,710.79 7004- $1,148,724.24 7005- $168,612.76 7006- $257,201.57 7007- $5,009.22 7011- $186.26 7014- $38,227.43 7015-$38,456.91 7017- $19,823.60 7020- $173,832.10 7028- $4,863.36 7029- $4,932.67 7033- $14,715.23 7036- $20,646.92 7037- $4,872.26 7039- $114,614.05 7040- $155,775.52 7043- $4,835.47 7045 -$5,695.66 7050 -$13,862.89 7052 -$29,999.83 7056 -$19,999.81 7058 -$67,220.74 |
| November 10, 2021 | P00096 | FUNDING ONLY ACTION | −$24,671 | CLIN NUMBER-NEW CEILING AFTER REALIGNMENT 7000- $10,741,246.15 7004- $1,148,724.24 7005- $168,612.76 7006- $257,201.57 7007- $5,009.22 7011- $186.26 7014- $38,227.43 7015-$38,456.91 7017- $19,823.60 7020- $173,832.10 7028- $4,863.36 7029- $4,932.67 7033- $14,715.23 7036- $20,646.92 7037- $4,872.26 7039- $114,614.05 7040- $155,775.52 7043- $4,835.47 7045 -$5,695.66 7050 -$13,862.89 7052 -$29,999.83 7056 -$19,999.81 7058 -$67,220.74 |
| October 15, 2021 | P00095 | FUNDING ONLY ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 16, 2021 | P00094 | FUNDING ONLY ACTION | +$3,043,281 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 9, 2021 | P00093 | FUNDING ONLY ACTION | +$230,889 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| August 25, 2021 | P00092 | FUNDING ONLY ACTION | +$288,547 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 30, 2021 | P00091 | FUNDING ONLY ACTION | +$3,971,969 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 26, 2021 | P00090 | FUNDING ONLY ACTION | +$1,908,707 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 19, 2021 | P00089 | FUNDING ONLY ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 19, 2021 | P00088 | FUNDING ONLY ACTION | +$1,640,730 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 1, 2021 | P00087 | FUNDING ONLY ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| June 21, 2021 | P00086 | FUNDING ONLY ACTION | +$32,865 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| June 17, 2021 | P00085 | FUNDING ONLY ACTION | +$1,012,425 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| June 1, 2021 | P00084 | FUNDING ONLY ACTION | +$323,274 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 19, 2021 | P00083 | FUNDING ONLY ACTION | +$1,566,465 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 14, 2021 | P00082 | FUNDING ONLY ACTION | −$1,306,394 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| April 22, 2021 | P00081 | FUNDING ONLY ACTION | +$996,049 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| March 23, 2021 | P00080 | FUNDING ONLY ACTION | +$1,837,985 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| March 11, 2021 | P00079 | FUNDING ONLY ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| February 24, 2021 | P00078 | FUNDING ONLY ACTION | +$258,613 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| February 1, 2021 | P00077 | FUNDING ONLY ACTION | +$487,761 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| January 20, 2021 | P00076 | FUNDING ONLY ACTION | +$1,390,354 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| January 19, 2021 | P00075 | FUNDING ONLY ACTION | −$34,002 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| December 29, 2020 | P00074 | FUNDING ONLY ACTION | +$408,249 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| December 22, 2020 | P00073 | FUNDING ONLY ACTION | −$15,783 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| November 25, 2020 | P00072 | FUNDING ONLY ACTION | +$5,951,610 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| November 20, 2020 | P00071 | FUNDING ONLY ACTION | +$214,833 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| November 5, 2020 | P00070 | FUNDING ONLY ACTION | +$121,815 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| October 21, 2020 | P00069 | FUNDING ONLY ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 29, 2020 | P00068 | FUNDING ONLY ACTION | +$22,488 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 28, 2020 | P00067 | FUNDING ONLY ACTION | +$376,826 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 21, 2020 | P00066 | FUNDING ONLY ACTION | +$456,945 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 15, 2020 | P00065 | FUNDING ONLY ACTION | +$3,477,975 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 1, 2020 | P00064 | FUNDING ONLY ACTION | +$221,190 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| August 5, 2020 | P00063 | FUNDING ONLY ACTION | +$229,105 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 30, 2020 | P00062 | FUNDING ONLY ACTION | +$475,217 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 29, 2020 | P00061 | FUNDING ONLY ACTION | +$236,859 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 23, 2020 | P00060 | FUNDING ONLY ACTION | +$2,847,383 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 20, 2020 | P00059 | FUNDING ONLY ACTION | +$4,469,660 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 15, 2020 | P00058 | FUNDING ONLY ACTION | +$723,498 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 1, 2020 | P00057 | FUNDING ONLY ACTION | +$1,017,909 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| June 26, 2020 | P00056 | EXERCISE AN OPTION | +$554,331 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| June 16, 2020 | P00055 | FUNDING ONLY ACTION | −$61,131 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| June 1, 2020 | P00054 | FUNDING ONLY ACTION | +$1,944,000 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 20, 2020 | P00053 | FUNDING ONLY ACTION | −$82,986 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 15, 2020 | P00052 | FUNDING ONLY ACTION | −$68,772 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 1, 2020 | P00051 | OTHER ADMINISTRATIVE ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| April 28, 2020 | P00050 | FUNDING ONLY ACTION | +$571,526 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| April 17, 2020 | P00049 | FUNDING ONLY ACTION | +$415,040 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| April 8, 2020 | P00048 | OTHER ADMINISTRATIVE ACTION | +$143,000 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| March 18, 2020 | P00047 | FUNDING ONLY ACTION | +$248,198 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| March 13, 2020 | P00046 | FUNDING ONLY ACTION | +$404,788 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| February 10, 2020 | P00045 | FUNDING ONLY ACTION | +$100,000 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| January 30, 2020 | P00044 | FUNDING ONLY ACTION | +$5,862,500 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| December 19, 2019 | P00043 | FUNDING ONLY ACTION | +$1,650,700 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| December 9, 2019 | P00042 | FUNDING ONLY ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| November 20, 2019 | P00041 | FUNDING ONLY ACTION | +$89,599 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| November 6, 2019 | P00040 | FUNDING ONLY ACTION | −$7,193 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| October 24, 2019 | P00039 | FUNDING ONLY ACTION | +$2,078,105 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| October 16, 2019 | P00038 | FUNDING ONLY ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 30, 2019 | P00037 | FUNDING ONLY ACTION | +$80,130 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 26, 2019 | P00036 | FUNDING ONLY ACTION | +$218,500 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 24, 2019 | P00035 | FUNDING ONLY ACTION | +$63,290 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 20, 2019 | P00034 | FUNDING ONLY ACTION | +$683,097 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 18, 2019 | P00033 | FUNDING ONLY ACTION | +$409,108 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 12, 2019 | P00032 | FUNDING ONLY ACTION | −$453 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| August 21, 2019 | P00031 | OTHER ADMINISTRATIVE ACTION | +$90,694 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| August 5, 2019 | P00030 | OTHER ADMINISTRATIVE ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 31, 2019 | P00029 | FUNDING ONLY ACTION | +$6,925,792 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 16, 2019 | P00028 | FUNDING ONLY ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 12, 2019 | P00027 | FUNDING ONLY ACTION | +$6,000,000 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| June 24, 2019 | P00026 | FUNDING ONLY ACTION | +$385,641 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| June 12, 2019 | P00025 | FUNDING ONLY ACTION | +$1,000,000 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| June 4, 2019 | P00024 | FUNDING ONLY ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 28, 2019 | P00023 | FUNDING ONLY ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 17, 2019 | P00022 | FUNDING ONLY ACTION | +$60,717 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 7, 2019 | P00021 | FUNDING ONLY ACTION | +$500,000 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| May 2, 2019 | P00020 | FUNDING ONLY ACTION | +$742,408 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| April 15, 2019 | P00019 | FUNDING ONLY ACTION | +$570,000 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| March 14, 2019 | P00018 | FUNDING ONLY ACTION | +$446,630 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| February 20, 2019 | P00017 | FUNDING ONLY ACTION | +$2,753,000 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| February 6, 2019 | P00016 | OTHER ADMINISTRATIVE ACTION | +$50,854 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| February 4, 2019 | P00015 | OTHER ADMINISTRATIVE ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| January 28, 2019 | P00014 | OTHER ADMINISTRATIVE ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| January 25, 2019 | P00013 | OTHER ADMINISTRATIVE ACTION | +$139,200 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| December 13, 2018 | P00012 | OTHER ADMINISTRATIVE ACTION | +$2,152,797 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| November 26, 2018 | P00011 | OTHER ADMINISTRATIVE ACTION | no money | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| November 1, 2018 | P00010 | OTHER ADMINISTRATIVE ACTION | +$108,270 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 25, 2018 | P00009 | OTHER ADMINISTRATIVE ACTION | +$2,393,248 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 24, 2018 | P00008 | OTHER ADMINISTRATIVE ACTION | +$1,135,607 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| September 12, 2018 | P00007 | OTHER ADMINISTRATIVE ACTION | +$2,168,121 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| August 24, 2018 | P00006 | OTHER ADMINISTRATIVE ACTION | −$884,697 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| August 16, 2018 | P00005 | OTHER ADMINISTRATIVE ACTION | +$50,000 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| August 14, 2018 | P00004 | OTHER ADMINISTRATIVE ACTION | +$524,921 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| August 6, 2018 | P00003 | OTHER ADMINISTRATIVE ACTION | +$255,848 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| August 1, 2018 | P00002 | OTHER ADMINISTRATIVE ACTION | +$2,454,953 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| July 31, 2018 | P00001 | OTHER ADMINISTRATIVE ACTION | +$6,594,152 | THE CONTRACTOR SHALL SUPPORT THE SCMS DIVISION IN THE PERFORMANCE OF C4SIR OPERATIONAL SYSTEMS DEVELOPMENT INCLUDING PERFORMING SYSTEMS ASSESSMENTS AND DESIGN, SYSTEMS ACQUISITION AND PROGRAM PLANNING, INTEGRATED PROJECT MANAGEMENT AND STRATEGY AND ANALYTICS SERVICES FOR DIVERSE HARDWARE RELATED PROJECTS IN DIFFERENT DEVELOPMENT STAGES. |
| June 12, 2018 | base | not on file | +$200,000 | IGF::OT::IGF |
Last refreshed November 4, 2026 at 2:31 PM UTC.