BOOZ ALLEN HAMILTON INC

Federal contract award, Booz Allen Hamilton, $51,988,784

Key CONT_AWD_N0042122F3001_9700_N0017819D7264_9700. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 101 days before this system saw it. One version on record.

Cite this row

On this site https://evidence.ourrevolution.media/filings/booz-allen-hamilton/CONT_AWD_N0042122F3001_9700_N0017819D7264_9700
At the source https://www.usaspending.gov/award/CONT_AWD_N0042122F3001_9700_N0017819D7264_9700
Observed 2026-09-05, version 1, retrieved 2026-09-05T00:51:43Z
Content hash bb4957227394fe96273de76a2f81147874e2be350126b3dca76f1ab53fdaec63

The source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.

Versions

VersionAmountChangeOccurredPublishedRetrievedHow it arrivedContent hash
1
current
$51,988,784first versionNovember 23, 2021May 27, 20262026-09-05T00:51:43Zhistorical sweepbb4957227394

Archived copy

None on file. An archived copy is optional corroboration and never a condition of this filing’s provenance, which is the stored response and its hash above; see the methodology page.

What the amount is made of

86 recorded actions, so the amount is the award's current total across all of them. 81 of them obligated money. Measured 2026-10-18, when USAspending reported a total obligation of $53,999,785.

Action dateModificationTypeObligatedDescription as recorded
July 1, 2026P00085OTHER ADMINISTRATIVE ACTIONno moneyENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS. TASKS INCLUDE: REQUIREMENTS DOCUMENTATION; INTEGRATION AND INSTALLATION; VERIFICATION AND VALIDATION; TECHNICAL AND MANAGEMENT, OPERATIONS AND SUSTAINMENT, AND RDTE SUPPORT.
June 17, 2026P00084FUNDING ONLY ACTION+$2,011,001ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS. TASKS INCLUDE: REQUIREMENTS DOCUMENTATION; INTEGRATION AND INSTALLATION; VERIFICATION AND VALIDATION; TECHNICAL AND MANAGEMENT, OPERATIONS AND SUSTAINMENT, AND RDTE SUPPORT.
May 27, 2026P00083FUNDING ONLY ACTION+$661,677ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS. TASKS INCLUDE: REQUIREMENTS DOCUMENTATION; INTEGRATION AND INSTALLATION; VERIFICATION AND VALIDATION; TECHNICAL AND MANAGEMENT, OPERATIONS AND SUSTAINMENT, AND RDTE SUPPORT.
May 5, 2026P00082FUNDING ONLY ACTION+$45,860ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS. TASKS INCLUDE: REQUIREMENTS DOCUMENTATION; INTEGRATION AND INSTALLATION; VERIFICATION AND VALIDATION; TECHNICAL AND MANAGEMENT, OPERATIONS AND SUSTAINMENT, AND RDTE SUPPORT.
April 16, 2026P00081FUNDING ONLY ACTION+$2,230,354ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS. TASKS INCLUDE: REQUIREMENTS DOCUMENTATION; INTEGRATION AND INSTALLATION; VERIFICATION AND VALIDATION; TECHNICAL AND MANAGEMENT, OPERATIONS AND SUSTAINMENT, AND RDTE SUPPORT.
March 12, 2026P00080FUNDING ONLY ACTION+$319,611ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS. TASKS INCLUDE: REQUIREMENTS DOCUMENTATION INTEGRATION & INSTALLATION VERIFICATION & VALIDATION TECHNICAL & MANAGEMENT, OPERATIONS & SUSTAINMENT, & RDT&E SUPPORT.
February 4, 2026P00079FUNDING ONLY ACTION+$39,946ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS. TASKS INCLUDE: REQUIREMENTS DOCUMENTATION INTEGRATION & INSTALLATION VERIFICATION & VALIDATION TECHNICAL & MANAGEMENT, OPERATIONS & SUSTAINMENT, & RDT&E SUPPORT.
January 30, 2026P00078FUNDING ONLY ACTION+$1,289,438ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS. TASKS INCLUDE: REQUIREMENTS DOCUMENTATION INTEGRATION & INSTALLATION VERIFICATION & VALIDATION TECHNICAL & MANAGEMENT, OPERATIONS & SUSTAINMENT, & RDT&E SUPPORT.
January 9, 2026P00077FUNDING ONLY ACTION+$1,386,600ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS. TASKS INCLUDE: REQUIREMENTS DOCUMENTATION INTEGRATION & INSTALLATION VERIFICATION & VALIDATION TECHNICAL & MANAGEMENT, OPERATIONS & SUSTAINMENT, & RDT&E SUPPORT.
December 30, 2025P00076FUNDING ONLY ACTION+$503,802ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS. TASKS INCLUDE: REQUIREMENTS DOCUMENTATION INTEGRATION & INSTALLATION VERIFICATION & VALIDATION TECHNICAL & MANAGEMENT, OPERATIONS & SUSTAINMENT, & RDT&E SUPPORT.
December 17, 2025P00075FUNDING ONLY ACTION+$177,595ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS. TASKS INCLUDE: REQUIREMENTS DOCUMENTATION INTEGRATION & INSTALLATION VERIFICATION & VALIDATION TECHNICAL & MANAGEMENT, OPERATIONS & SUSTAINMENT, & RDT&E SUPPORT.
December 1, 2025P00074FUNDING ONLY ACTION+$249,215ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS AT DIFFERENT STAGES OF THE ENGINEERING LIFECYCLE. TASKS INCLUDE TECHNICAL SUPPORT, REQUIREMENTS IDENTIFICATION & DOCUMENTATION, INTEGRATION, VERIFICATION, & RDT&E SUPPORT.
November 7, 2025P00073FUNDING ONLY ACTION+$314,897ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS. TASKS INCLUDE: REQUIREMENTS DOCUMENTATION INTEGRATION & INSTALLATION VERIFICATION & VALIDATION TECHNICAL & MANAGEMENT, OPERATIONS & SUSTAINMENT, & RDT&E SUPPORT.
November 3, 2025P00072FUNDING ONLY ACTION+$198,591ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS AT DIFFERENT STAGES OF THE ENGINEERING LIFECYCLE. TASKS INCLUDE TECHNICAL SUPPORT, INTEGRATION AND INSTALLATION, VERIFICATION AND VALIDATION, SUSTAINMENT, AND RDT&E SUPPORT.
September 11, 2025P00071FUNDING ONLY ACTION+$255,667ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS AT DIFFERENT STAGES OF THE ENGINEERING LIFECYCLE. TASKS INCLUDE TECHNICAL SUPPORT, REQUIREMENTS IDENTIFICATION & DOCUMENTATION, INTEGRATION, VERIFICATION, & RDT&E SUPPORT.
August 19, 2025P00070FUNDING ONLY ACTION+$1,220,669ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS AT DIFFERENT STAGES OF THE ENGINEERING LIFECYCLE. TASKS INCLUDE TECHNICAL SUPPORT, REQUIREMENTS IDENTIFICATION & DOCUMENTATION, INTEGRATION, VERIFICATION, & RDT&E SUPPORT.
July 28, 2025P00069FUNDING ONLY ACTION+$188,645ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS AT DIFFERENT STAGES OF THE ENGINEERING LIFECYCLE. TASKS INCLUDE TECHNICAL SUPPORT, REQUIREMENTS IDENTIFICATION & DOCUMENTATION, INTEGRATION, VERIFICATION, & RDT&E SUPPORT.
July 1, 2025P00068FUNDING ONLY ACTION+$620,285ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS AT DIFFERENT STAGES OF THE ENGINEERING LIFECYCLE. TASKS INCLUDE TECHNICAL SUPPORT, REQUIREMENTS IDENTIFICATION & DOCUMENTATION, INTEGRATION, VERIFICATION, & RDT&E SUPPORT.
June 12, 2025P00067FUNDING ONLY ACTION+$143,501THE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING TO CLIN 6000.
June 2, 2025P00066FUNDING ONLY ACTION−$2,609ENGINEERING & TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS AT DIFFERENT STAGES OF THE ENGINEERING LIFECYCLE. TASKS INCLUDE TECHNICAL SUPPORT, INSTALLATION, VERIFICATION, & SUSTAINMENT & RDT&E SUPPORT.
April 30, 2025P00065FUNDING ONLY ACTION+$120,000ENGINEERING & TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS AT DIFFERENT STAGES OF THE ENGINEERING LIFECYCLE. TASKS INCLUDE TECHNICAL & MANAGEMENT SUPPORT, REQUIREMENTS DOCUMENTATION, INSTALLATION, VALIDATION, & RDT&E SUPPORT.
March 24, 2025P00064FUNDING ONLY ACTION+$33,517INCREMENTALLY FUND AND DEOBLIGATE
March 13, 2025P00063FUNDING ONLY ACTION+$261,319INCREMENTALLY FUND AND DEOBLIGATE
February 27, 2025P00062FUNDING ONLY ACTION+$4,899,427INCREMENT FUNDING AND DEOBLIGATION
February 13, 2025P00061FUNDING ONLY ACTION+$260,580THIS PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING.
January 15, 2025P00060FUNDING ONLY ACTION+$435,878THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND CLINS 6001, 6002 AND 7001.
January 7, 2025P00059FUNDING ONLY ACTION+$65,455ADMINISTRATIVE CHANGE AND INCREMENTALLY FUND
December 9, 2024P00058FUNDING ONLY ACTION+$95,500INCREMENTALLY FUND AND ADMINISTRATIVE CHANGE
November 7, 2024P00057FUNDING ONLY ACTION+$2,440,233EXERCISE AN OPTION, INCREMENTALLY FUND, AND ADMINISTRATIVE CHANGE
October 10, 2024P00056FUNDING ONLY ACTION+$341,401INCREMENTALLY FUND, DEOBLIGATE AND REALIGN CEILING
September 13, 2024P00055FUNDING ONLY ACTION−$52,064DEOBLIGATE FUNDING AND REALIGN CEILING
August 20, 2024P00054FUNDING ONLY ACTION+$26,962INCREMENTAL FUNDING
August 6, 2024P00053FUNDING ONLY ACTION+$126,000INCREMENTAL FUNDING
July 25, 2024P00052FUNDING ONLY ACTION+$670,000INCREMENTAL FUNDING
July 10, 2024P00051FUNDING ONLY ACTION+$420,554INCREMENTALLY FUND
June 4, 2024P00050FUNDING ONLY ACTION+$838,455INCREMENTALLY FUND AND ADMINISTRATIVE CHANGE
May 14, 2024P00049FUNDING ONLY ACTION+$588,169INCREMENTALLY FUND AND DEOBLIGATE
April 24, 2024P00048FUNDING ONLY ACTION+$370,408DEOBLIGATE, INCREMENTALLY FUND, REALIGN CEILING, AND ADMINISTRATIVE CHANGE
April 1, 2024P00047FUNDING ONLY ACTION+$1,463,353INCREMENTAL FUNDING AND DEOBLIGATE
March 11, 2024P00046FUNDING ONLY ACTION+$11,162INCREMENTAL FUNDING AND DEOBLIGATE
March 5, 2024P00045FUNDING ONLY ACTION−$208,546DEOBLIGATE AND REALIGN CEILING
February 14, 2024P00044FUNDING ONLY ACTION+$955,041INCREMENTALLY FUND
January 31, 2024P00043FUNDING ONLY ACTION+$203,714INCREMENTALLY FUND
January 4, 2024P00042FUNDING ONLY ACTION+$684,063INCREMENTAL FUNDING
December 18, 2023P00041FUNDING ONLY ACTION+$54,047INCREMENTAL FUNDING AND ADMINISTRATIVE CHANGE
December 11, 2023P00040FUNDING ONLY ACTION+$2,294,087INCREMENTAL FUNDING, DEOBLIGATE, AND REALIGN CEILING
November 27, 2023P00039FUNDING ONLY ACTION+$515,000EXERCISE OPTION YEAR II AND INCREMENTALLY FUND
November 2, 2023P00038FUNDING ONLY ACTION+$8,900INCREMENTAL FUNDING
October 11, 2023P00037FUNDING ONLY ACTIONno moneyREALIGN CEILING
September 7, 2023P00036FUNDING ONLY ACTION+$199,031INCREMENTAL FUNDING
August 16, 2023P00035FUNDING ONLY ACTION+$225,064DEOBLIGATE, INCREMENTAL FUNDING, AND ADMINISTRATIVE CHANGE
August 9, 2023P00034FUNDING ONLY ACTION+$532,160DEOBLIGATIONS, INCREMENTAL FUNDING AND ADMINISTRATIVE CHANGES
July 13, 2023P00033FUNDING ONLY ACTION−$94,395DEOBLIGATIONS, INCREMENTAL FUNDING, AND ADMINISTRATIVE CHANGE
June 29, 2023P00032FUNDING ONLY ACTION−$251,571DEOBLIGATIONS AND INCREMENTAL FUNDING
June 8, 2023P00031FUNDING ONLY ACTION+$783,734INCREMENTAL FUNDING AND CEILING REALIGN
May 8, 2023P00030FUNDING ONLY ACTION+$1,629,820INCREMENTAL FUNDING
May 3, 2023P00029FUNDING ONLY ACTION+$141,913INCREMENTAL FUNDING
April 24, 2023P00028FUNDING ONLY ACTION+$800,854DEOBLIGATION, INCREMENTAL FUNDING, CEILING REALIGN, ADMINISTRATIVE CHANGES.
April 11, 2023P00027FUNDING ONLY ACTION+$95,000INCREMENTAL FUNDING
March 30, 2023P00026FUNDING ONLY ACTION+$62,000INCREMENTAL FUNDING
March 29, 2023P00025FUNDING ONLY ACTION+$68,294COST/FEE CEILING REALIGN, INCREMENTAL FUNDING, DEOB
March 6, 2023P00024FUNDING ONLY ACTION+$1,490,388DEOBLIGATION AND INCREMENTAL FUNDING
February 16, 2023P00023FUNDING ONLY ACTION+$781,842INCREMENTAL FUNDING AND ADMINISTRATIVE CHANGES
February 1, 2023P00022FUNDING ONLY ACTION+$135,652INCREMENTAL FUNDING AND ADMINISTRATIVE CHANGES
January 18, 2023P00021FUNDING ONLY ACTION+$748,199ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS AT DIFFERENT STAGES OF THE ENGINEERING LIFECYCLE. TASKS INCLUDE TECHNICAL AND MANAGEMENT SUPPORT, REQUIREMENTS IDENTIFICATION AND DOCUMENTATION, INTEGRATION AND INSTALLATION
December 22, 2022P00020FUNDING ONLY ACTION+$2,398,175INCREMENTAL FUNDING
December 7, 2022P00019FUNDING ONLY ACTION+$1,044,417CEILING REALIGNMENT AND INCREMENTAL FUNDING
November 17, 2022P00018FUNDING ONLY ACTION+$839,380ENGINEER & TECH EXPERTISE TO SUPPORT MSNE PROJECTS AT DIFF STAGES OF ENGINEER LIFECYCLE. TASKS: TECH & MANAGE SUPPORT, REQUIREMENTS ID & DOCUMENT, INTEGRATION & INSTALLATION, VERIFICATION & VALIDATION, OPS & SUSTAINMENT SUPPORT, AND RDT&E SUPPORT.
November 14, 2022P00017FUNDING ONLY ACTION+$90,000ENGINEERING/TECHNICAL SUPPORT MSNE PROJECTS . TASKS INCLUDE TECHNICAL/MANAGEMENT SUPPORT, REQUIREMENTS IDENTIFICATION/DOCUMENTATION, INTEGRATION/INSTALLATION, VERIFICATION, VALIDATION, OPERATIONS, SUSTAINMENT SUPPORT, RDT&E SUPPORT.
October 17, 2022P00016FUNDING ONLY ACTION+$100,588ADMINISTRATIVE CHANGES, DEOBLIGATION AND INCREMENTAL FUNDING
September 29, 2022P00015FUNDING ONLY ACTION+$62,846ENGINEERING AND TECHNICAL EXPERTISE REQUIRED TO SUPPORT MSNE PROJECTS
September 14, 2022P00014FUNDING ONLY ACTION+$168,561ADMINISTRATIVE CHANGES AND INCREMENTAL FUNDING
September 1, 2022P00013FUNDING ONLY ACTION+$501,916INCREMENTAL FUNDING
August 10, 2022P00012FUNDING ONLY ACTION+$2,078,145INCREMENTAL FUNDING AND ADMINISTRATIVE CHANGES.
July 11, 2022P00011FUNDING ONLY ACTION+$877,024ADMINISTRATIVE CHANGES AND INCREMENTAL FUNDING
June 29, 2022P00010FUNDING ONLY ACTION+$277,207ADMINISTRATIVE CHANGES TO SECTION J, ATTACHMENT 1 AND INCREMENTAL FUNDING.
June 15, 2022P00009FUNDING ONLY ACTION+$145,991INCREMENTAL FUNDING
June 14, 2022P00008FUNDING ONLY ACTIONno moneyADMINISTRATIVE CHANGES TO SECTIONS B AND C.
May 25, 2022P00007FUNDING ONLY ACTION+$1,746,057DEOBLIGATION AND INCREMENTAL FUNDING
May 4, 2022P00006FUNDING ONLY ACTIONno moneyCEILING REALIGNMENT AND ADMINISTRATIVE CHANGES.
April 5, 2022P00005FUNDING ONLY ACTION+$323,551INCREMENTAL FUNDING
March 23, 2022P00004FUNDING ONLY ACTION+$733,109ADMINISTRATIVE CHANGES AND INCREMENTAL FUNDING
March 16, 2022P00003FUNDING ONLY ACTION+$88,427INCREMENTAL FUNDING
March 1, 2022P00002FUNDING ONLY ACTIONno moneyCEILING REALIGNMENT
January 28, 2022P00001OTHER ADMINISTRATIVE ACTION+$5,349,044ADMIN-15
November 23, 2021basenot on file+$50,000MSNE AWWARD

Last refreshed November 4, 2026 at 2:31 PM UTC.