GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC.
Federal contract award, General Dynamics Information Technology, $665,344,888
Key CONT_AWD_0142_9700_DAAB0700DE252_9700. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 248 days before this system saw it. One version on record.
Cite this row
6cf95d70dfe5771b61b70e350f9e73e45423c32608fa61f09ebd15cd1161c7cfThe source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $665,344,888 | first version | March 1, 2012 | December 31, 2025 | 2026-09-05T01:08:42Z | historical sweep | 6cf95d70dfe5 |
Archived copy
None on file. An archived copy is optional corroboration and never a condition of this filing’s provenance, which is the stored response and its hash above; see the methodology page.
What the amount is made of
94 recorded actions, so the amount is the award's current total across all of them. 63 of them obligated money. Measured 2026-09-15, when USAspending reported a total obligation of $665,344,888.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| December 4, 2025 | 93 | FUNDING ONLY ACTION | −$1,126,599 | DEOBLIGATE EXCESS FUNDING ON OPTIONS THREE AND FIVE FOR LMP |
| August 20, 2025 | 92 | FUNDING ONLY ACTION | −$513,832 | DEOBLIGATE EXCESS FUNDING ON OPTION 4 FOR LMP |
| October 31, 2023 | 91 | FUNDING ONLY ACTION | −$3,259,579 | DEOBLIGATE EXCESS FUNDING ON OPTIONS 3, 4, AND 5. |
| June 16, 2022 | 90 | FUNDING ONLY ACTION | −$4,222,041 | DEOBLIGATE EXCESS FUNDING ON BASE AND OPTIONS 1, 2, AND 3. REALIGN FUNDS ON OPTIONS 2 AND 3 TO CORRECT A NULO. |
| August 19, 2021 | 89 | OTHER ADMINISTRATIVE ACTION | no money | NOVATION AGREEMENT TO CHANGE CONTRACT INFORMATION FROM CSRA TO DGIT. |
| December 30, 2020 | 88 | OTHER ADMINISTRATIVE ACTION | no money | MODIFICATION TO CHANGE THE ADMINISTRATION OFFICE FROM DCMA MANASSAS (S2404A) TO ARMY CONTRACTING COMMAND-ROCK ISLAND (W52P1J). |
| October 2, 2018 | 87 | FUNDING ONLY ACTION | +$47,919 | REOBLIGATE FUNDING ON SLIN 1298AA. |
| September 26, 2018 | 86 | FUNDING ONLY ACTION | −$58,333 | IGF:OT;:IGF DE-OBLIGATION OF FUNDS |
| March 13, 2018 | 85 | FUNDING ONLY ACTION | no money | LMP SUSTAINMENT SERVICES |
| December 8, 2017 | 84 | FUNDING ONLY ACTION | no money | IGF::OT::IGF LMP SUSTAINMENT SERVICES |
| October 16, 2017 | 83 | FUNDING ONLY ACTION | +$2,164,549 | IGF::OT::IGF LMP SUSTAINMENT SERVICES |
| October 2, 2017 | 82 | OTHER ADMINISTRATIVE ACTION | no money | IGF::OT::IGF LMP SUSTAINMENT SERVICES |
| July 24, 2017 | 81 | FUNDING ONLY ACTION | no money | IGF::OT::IGF LMP SUSTAINMENT SERVICES |
| May 19, 2017 | 80 | FUNDING ONLY ACTION | +$7,849,868 | IGF::OT::IGF LMP SUSTAINMENT SERVICES |
| May 3, 2017 | 79 | EXERCISE AN OPTION | +$2,575,254 | IGF::OT::IGF LMP SUSTAINMENT SERVICES |
| March 24, 2017 | 78 | FUNDING ONLY ACTION | +$2,000,000 | IGF::OT::IGF LMP SUSTAINMENT SERVICES |
| March 24, 2017 | 76 | OTHER ADMINISTRATIVE ACTION | no money | IGF::OT::IGF LMP SUSTAINMENT SERVICES |
| March 23, 2017 | 77 | FUNDING ONLY ACTION | −$2,000,000 | IGF::OT::IGF LMP SUSTAINMENT SERVICES |
| December 28, 2016 | 75 | CHANGE ORDER | −$3,838,867 | IGF::OT::IGF LMP SUSTAINMENT SERVICES |
| December 8, 2016 | 74 | FUNDING ONLY ACTION | no money | IGF::OT::IGF LMP SUSTAINMENT SERVICES |
| September 28, 2016 | 73 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$18,863 | IGF::OT::IGF DISA MIGRATION - OPTION |
| September 28, 2016 | 72 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$8,930,268 | IGF::OT::IGF HOSTING RESOURCE SERVICES |
| August 29, 2016 | 71 | FUNDING ONLY ACTION | +$2,826,761 | IGF::OT::IGF LOGISTICS MODERNIZATION PROGRAM SUPPORT SERVICES |
| August 18, 2016 | 70 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | IGF::OT::IGF U.S. ARMY LOGISTICS MODERNIZATION PROGRAM CORE AND COMPONENT 1 TRANSITION OF SERVICES |
| July 15, 2016 | 69 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | IGF::OT::IGF INCORPORATE REVISED REQUIREMENT FOR ADDITIONAL FACILITIES SPACES FOR JUL 2016 - SEP 2016. |
| June 2, 2016 | 68 | FUNDING ONLY ACTION | no money | IGF::OT::IGF EXTEND THE DISA MIGRATION OPTION EFFORT FROM 30 SEP 2016 TO 28 DEC 2016. REALIGNED FUNDS FROM OPTION PERIOD TWO&THREE TO OPTION PERIOD FOUR |
| May 2, 2016 | 67 | FUNDING ONLY ACTION | +$9,259,757 | IGF::OT::IGF PROVIDE FUNDING FOR CLINS 1500 (MODERNIZATION), 1502 (TRAVEL) AND 1505 (FEE). NO COST EXTENSION TO DISA MIGRATION OPTION CLINS. INCORPORATE UPDATED PWS |
| March 4, 2016 | 66 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | IGF::OT::IGF:: INCORPORATE REVISED PWS/ RE-ALIGN DISA FUNDING FROM PREVIOUS PERIOD TO CURRENT PERIOD. |
| January 28, 2016 | 65 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,000,000 | IGF::OT::IGF INCORPORATE DISA MIGRATION OPTION WITH PERIOD OF PERFORMANCE OF 31 JAN 2016 - 30 SEP 2016 |
| January 28, 2016 | 64 | EXERCISE AN OPTION | +$14,715,603 | IGF::OT::IGF EXERCISE THE FULL OPTION PERIOD FOUR AND INCORPORATED UPDATED PWS AND CDRLS |
| December 29, 2015 | 63 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,233,115 | IGF::OT::IGF INCORPORATE ADDITIONAL FACILITIES SPACE PART 2 EXTEND THE CURRENT DISA MIGRATION SUPPORT EFFORT TO ALLOW TIME FOR EXECUTION OF THE DISA MIGRATION OPTION. |
| December 22, 2015 | 62 | OTHER ADMINISTRATIVE ACTION | +$17,165,720 | IGF::OT::IGF INCORPORATE THE DISA MIGRATION OPTION, THE ADDT'L FACILITIES PART 2 AND UPDATED PWS |
| November 3, 2015 | 61 | FUNDING ONLY ACTION | +$172,723 | IGF::OT::IGF PROVIDE ADDITIONAL FUNDING FOR FACILITIES/ODCS AND FEE CLIN. |
| October 21, 2015 | 60 | FUNDING ONLY ACTION | +$6,589,596 | IGF::OT::IGF LOGISTICS MODERNIZATION SERVICES INCLUDES ANY AND ALL ACTIVITIES RELATED TO PRODUCTION SUPPORT, SOLUTION AND APPLICATIONS MANAGEMENT, MANAGEMENT OF CHANGE REQUESTS (SUSTAINMENT AND EXPANSION); MANAGEMENT OF USER AND SECURITY ROLES AND ACCOUNTS; ALL ASPECTS OF SYSTEM SECURITY INCLUDING PROCESSES AND POLICIES, ACCESS MONITORING, DOCUMENTATION AND SPECIAL PROJECTS; ARCHITECT ACTIVITIES, ARCHIVE ACTIVITIES, AND ALL PRODUCTION SUPPORT SOLUTION EXTENSION (PSSE) ACTIVITIES DRIVEN BY THE NUMBER OF ANTICIPATED EXTERNAL HELP DESK TICKETS REFLECTIVE OF CURRENT DEMAND RATE FOR CLIENT FORECASTED HIGH PRIORITY BREAK/FIX AND SMALL ENHANCEMENTS ACROSS MULTIPLE BUSINESS AREAS. LMP MODERNIZATION EFFORT FUNDING INCREASE FOR OPTION PERIOD THREE. |
| September 29, 2015 | 59 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,748,817 | IGF::OT::IGF PROVIDE INCREMENTAL FUNDING FOR CLIN 1400 (LMP MODERNIZATION). INCORPORATE REVISED REQUIREMENT FOR ORIGINAL 100 TOS FACILITIES SPACES AND INCORPORATE REQUIREMENT FOR ADDITIONAL FACILITIES SPACES, AS REQUIRED. |
| September 3, 2015 | 58 | FUNDING ONLY ACTION | no money | IGF::OT::IGF CORRECT FUNDING DE-OBLIGATION. REPLACE FUNDS ON CLIN 1400AG AND DE-OB FUNDS FROM 1400AC |
| August 31, 2015 | 57 | OTHER ADMINISTRATIVE ACTION | +$9,938,597 | IGF::OT::IGF 1. PROVIDE FULL FUNDING FOR CLINS 1402, 1403, 1404 AND 1405. 2. DE-OBLIGATE FUNDING FROM SUBCLIN 1400AG TO ACCOMMODATE A GOVERNMENT REQUIREMENT OUTSIDE OF LMP TASK ORDER 0142. 3. REALIGN FUNDING FROM CLIN 1404 (C1 TOS SUPPORT) TO CLIN 1401 (CORE&C1 TOS ODCS) TO ACCOMMODATE A GREATER SQUARE FOOTAGE FOR TOS-RELATED GOVERNMENT CUBICLES/WORKSTATIONS. |
| July 21, 2015 | 56 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | IGF::OT::IGF EXTEND THE SUPPORT OF THE REFERENCED PRINTERS FROM 30 JUN 2015 TO 28 DEC 2015. |
| June 30, 2015 | 55 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,262,285 | IGF::OT::IGF HIGH-PERFORMANCE ANALYTIC APPLIANCE (HANA) SOFTWARE LICENSES AND STORAGE ARRAY NETWORK (SAN) STORAGE |
| June 30, 2015 | 54 | FUNDING ONLY ACTION | +$552,723 | IGF::OT::IGF PROVIDE FULL FUNDING FOR CLIN 1401 GOVT FACILITIES. RE-ALIGN FUNDING FROM BASE PERIOD CLIN 1100 AND OPTION PERIOD ONE CLIN 1200 TO OPTION PERIOD THREE CLINS 1400, 1402 AND 1405 TO ALLOW FOR ADDITIONAL HOURS FOR COMPLETION OF OPTION PERIOD THREE REQUIREMENTS. |
| May 1, 2015 | 53 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$125,000 | IGF::OT::IGF HEWLETT PACKARD (HP) HIGH PERFORMANCE ANALYTICAL APPLIANCE (HANA) |
| April 24, 2015 | 52 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$6,000,000 | IGF::OT::IGF DEFENSE INFORMATION SYSTEMS AGENCY (DISA) MIGRATION SUPPORT |
| March 27, 2015 | 51 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$727,459 | DATA CENTER SERVICES. IGF::OT::IGF |
| March 13, 2015 | 50 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | IGF::OT::IGF RE-ALGIN FUNDING FROM OPTION PERIOD TWO CLINS 1300, 1303 AND 1305 TO OPTION PERIOD THREE CLINS 1400, 1403 AND 1405 TO ALLOW FOR A LARGER NUMBER OF OPTION PERIOD THREE REQUIREMENTS TO BE COMPLETED. |
| March 2, 2015 | 49 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | IGF::OT::IGF REALIGN FUNDING FROM CLINS 1302, 1304 AND 1305 TO CLIN 1404 TO ACCOMODATE ADDITIONAL C1 TOS SUPPORT DURING OPTION PERIOD THREE. |
| February 11, 2015 | 48 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$6,097,284 | INCORPORATE INCREMENT 2 WAVE 3 RESOURCES |
| December 17, 2014 | 47 | EXERCISE AN OPTION | +$69,132,254 | EXERCISE OPTION PERIOD THREE FOR CORE SERVICES AND C1 TOS SUPPORT. ALL CLINS WERE EVALUATED AND INCORPORATED INTO THE TASK ORDER VIA MODIFICATION 32. OPTION PERIOD THREE IS INCREMENTALLY FUNDED. |
| December 2, 2014 | 46 | FUNDING ONLY ACTION | +$3,421,230 | PROVIDE FULL FUNDING FOR CLINS 1300 AND 1305 |
| October 29, 2014 | 45 | OTHER ADMINISTRATIVE ACTION | no money | INCORPORATE UPDATED ATTACHMENTS 0010, 0011, 0012, 0013 AND 0014 AND INCORPORATE ATTACHMENT 0015 "WORKSTATIONS AND LAPTOPS" TO SUPPORT THE RESIDUAL HARDWARE BUY BACK EFFORT AWARDED ON MODIFICATION 42 |
| September 29, 2014 | 44 | FUNDING ONLY ACTION | +$6,719,513 | INCREMENTAL FUNIDNG FOR THE EXTENSION OF HOSTING RESOURCES EFFORT |
| September 29, 2014 | 43 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$939,658 | MODIFICATION 43 INCORPORATES THE EXTENSION OF DATA CENTER SERVICES |
| September 26, 2014 | 42 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,224,874 | RESIDUAL HARDWARE BUY BACK FOR DATA CENTER EQUIPMENT TRANSFERRING TO THE GOVERNMENT |
| September 26, 2014 | 41 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,499,739 | INCORPORATE ADDITIONAL INCREMENT 2 SUSTAINMENT RESOURCES |
| September 26, 2014 | 40 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$20,345,523 | INCORPORATE THE EXTENSION OF HOSTING RESOURCES |
| September 3, 2014 | 39 | FUNDING ONLY ACTION | +$31,422,595 | INCREMENTAL FUNDING MODIFICATION ONLY |
| August 7, 2014 | 38 | FUNDING ONLY ACTION | no money | U.S. ARMY LOGISTICS MODERNIZATION PROGRAM (LMP) CORE SERVICES. |
| May 21, 2014 | 37 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | RE-ALIGN NTE CEILING AMOUNTS FROM CLIN 1302 TO CLIN 1303 TO ACCOMMODATE ADDITIONAL LMP REQUIREMENTS FOR CONTRACT YEAR 2014 |
| April 1, 2014 | 36 | OTHER ADMINISTRATIVE ACTION | +$53,701,603 | PROVIDE INCREMENTAL FUNDING FOR CLINS 1300, 1301, 1302, 1303, 1304 AND 1305. ALSO, RE-ALIGN FUNDING FROM SUBCLIN 1302AA TO 1303AE AS A RESULT OF THE WRONG FUNDING TYPE BEING OBLIGATED VIA MODIFICATION 32 |
| March 19, 2014 | 35 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | RE-ALIGN FUNDS FROM CLINS 1301AA AND 1305AA TO FUND THE FFP CLIN 2399AA FOR SOFTWARE LICENSES AND MAINTENANCE |
| March 4, 2014 | 34 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$22,487 | INCORPORATE GTAS TESTING HARDWARE AS CLIN 2300 |
| January 21, 2014 | 33 | OTHER ADMINISTRATIVE ACTION | no money | CORRECT SUBCLIN UNIT OF ISSUE FROM "SV" TO "LO" AND INCORPORATE THE CDRL ATTACHMENT. |
| December 26, 2013 | 32 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$62,000,000 | IGF::OT::IGF INCORPORATE OPTION PERIODS TWO, THREE AND FOUR; EXERCISE OPTION PERIOD TWO |
| November 13, 2013 | 31 | FUNDING ONLY ACTION | +$5,001,680 | FULLY FUND CLINS 1200, 1202 AND 2200 |
| October 24, 2013 | 30 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | EXTEND POP FOR CLIN 2299 (CAST/FORTIFY-FFP) |
| September 27, 2013 | 29 | FUNDING ONLY ACTION | +$655,054 | INCREMENTAL FUNDING FOR CLIN 2200 |
| September 11, 2013 | 28 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$97,390 | INCORPORATE CLIN 1297 FOR THE LOGSA BO/BI SME EFFORT |
| August 29, 2013 | 27 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$19,199,139 | INCORPORATE THE CAST/FORTIFY (FFP) REQUIREMENT, RE-ALIGN FUNDS FROM CLIN 1202 (CORE TRAVEL) TO CLIN 1201 (CORE GOV FACILITIES), PROVIDE INCREMENTAL FUNDING FOR CLINS 1200, 1201 AND 2200 |
| June 12, 2013 | 26 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | REPLACE DE-OBLIGATED FUNDS FROM CLIN 2200AC WITH CLIN 2200AE. RE-ALING FUNDS FROM CLIN 1102 TO CLIN 1200 |
| June 10, 2013 | 25 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | INCORPORATE REVISED TO 0142 PWS AND A SEPARATE ATTACHMENT CONTAINING APPLICABLE CDRLS |
| June 3, 2013 | 24 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$489,029 | INCORPORATE THE AUDIT READINESS REQUIREMENT |
| May 1, 2013 | 23 | OTHER ADMINISTRATIVE ACTION | no money | MODIFICATION TO CORRECT SECTION A NARRATIVES. |
| April 26, 2013 | 22 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$35,021,068 | FOR THE US ARMY LOGISTICS MODERNIZATION PROGRAM (LMP) CORE SERVICES. |
| April 16, 2013 | 21 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | EXTENSION OF POP FOR CLIN 1198 AND FUND RE-ALIGNMENT FROM CLIN 1102 TO CLINS 1101 AND 1201. |
| April 8, 2013 | 20 | FUNDING ONLY ACTION | no money | RE-ALIGN FUNDS IN THE AMOUNT OF $1,200,000.00 FROM BASE PERIOD TO OPTION PERIOD ONE |
| March 7, 2013 | 19 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | EXTEND EWM CLIN 1199 PERIOD OF PERFORMANCE |
| March 5, 2013 | 18 | FUNDING ONLY ACTION | +$355,260 | INCREMENTAL FUNDING FOR CLIN 2200, LMP CORE SUSTAINMENT |
| January 28, 2013 | 17 | FUNDING ONLY ACTION | +$61,484,187 | INCREMENTAL FUNDING FOR CLINS 1200, 1201, 1202, AND 2200 |
| December 28, 2012 | 16 | EXERCISE AN OPTION | +$57,152,000 | EXERCISE OPTION PERIOD ONE AND INCREMENTALLY FUND LINE ITEMS. |
| December 11, 2012 | 15 | FUNDING ONLY ACTION | +$82,075 | INCREMENTAL FUNDING FOR CLIN 2100. ALL CLINS FOR THE BASE PERIOD ARE FULLY FUNDED AS A RESULT OF THIS MODIFICATION. |
| November 29, 2012 | 14 | OTHER ADMINISTRATIVE ACTION | no money | MOVE FUNDS FROM CLIN 1102 TO 1101 |
| October 16, 2012 | 13 | FUNDING ONLY ACTION | +$8,703,710 | PROVIDE FUNDING TO FULLY FUND CLIN 1100 |
| October 10, 2012 | 12 | FUNDING ONLY ACTION | +$24,468,367 | INCREMENTAL FUNDING FOR CLINS 1101, 1102, AND 2100 |
| September 28, 2012 | 11 | FUNDING ONLY ACTION | +$23,437 | INCREMENTAL FUNDING FOR CLIN 2100 |
| September 20, 2012 | 10 | FUNDING ONLY ACTION | +$2,413,118 | INCREMENTAL FUNDING FOR CLINS 1101 AND 2100. |
| September 19, 2012 | 9 | FUNDING ONLY ACTION | +$242,517 | MODIFICATION 09 TO TASK ORDER 0142. SUPPORT CHANGE REQUEST DATABASE, A6 DENIALS. |
| August 29, 2012 | 8 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$912,403 | JM&L EWM TRAINING MATERIAL |
| July 26, 2012 | 7 | FUNDING ONLY ACTION | +$10,749,911 | INCREMENTAL FUNDING FOR CLINS 1100, 1101, 1102, AND 2100 |
| June 26, 2012 | 6 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$6,672,362 | JOINT MUNITIONS&LETHALITY (JM&L) EXTENDED WAREHOUSE MANAGEMENT (EWM) FUNCTIONALITY |
| May 15, 2012 | 5 | FUNDING ONLY ACTION | +$8,810,000 | INCREMENTAL FUNDING FOR CLIN 1100 |
| May 9, 2012 | 4 | OTHER ADMINISTRATIVE ACTION | no money | LMP CORE SERVICES: CORRECT LINE OF ACCOUNTING |
| April 13, 2012 | 3 | FUNDING ONLY ACTION | +$47,296,704 | INCREMENTAL FUNDING TO TASK ORDER 0142. 282P000928 CLIN 2100 $43,402,000.00 FFP LMP SUSTAINMENT 282P000328 CLIN 2100 $1,072,000.00 FFP LMP SUSTAINMENT 282P000428 CLIN 2100 $1,085,000.00 FFP LMP SUSTAINMENT 282P001028 CLIN 1102 $1,737,703.72 CPFF TRAVEL |
| March 23, 2012 | 2 | OTHER ADMINISTRATIVE ACTION | no money | FUNDING CORE BASE PERIOD |
| March 14, 2012 | 1 | FUNDING ONLY ACTION | +$1,690,990 | FUNDING CORE¿ BASE PERIOD |
| March 1, 2012 | base | not on file | +$28,412,102 | FUNDING CORE BASE PERIOD IGF::OT::IGF |
Last refreshed November 4, 2026 at 2:31 PM UTC.