GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC.
Federal contract award, General Dynamics Information Technology, $176,936,385
Key CONT_AWD_91990018F0014_9100_HHSN316201200050W_7529. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 149 days before this system saw it. One version on record.
Cite this row
983a6beb07e687bbf29bfa53e2c89a20967bc91503623565083b9e2fdc9c9f70The source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $176,936,385 | first version | February 24, 2018 | April 9, 2026 | 2026-09-05T01:08:45Z | historical sweep | 983a6beb07e6 |
Archived copy
None on file. An archived copy is optional corroboration and never a condition of this filing’s provenance, which is the stored response and its hash above; see the methodology page.
What the amount is made of
66 recorded actions, so the amount is the award's current total across all of them. 51 of them obligated money. Measured 2026-09-15, when USAspending reported a total obligation of $176,936,385.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| April 9, 2026 | P00066 | CHANGE ORDER | no money | PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - SERVICE CATALOG CHANGES |
| January 22, 2026 | P00065 | CHANGE ORDER | no money | PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - SERVICE CATALOG CHANGES |
| December 29, 2025 | P00064 | CHANGE ORDER | no money | PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - SERVICE CATALOG CHANGES |
| September 30, 2025 | P00063 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$193,516 | PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - INCREASE MAC SUPPORT LEVEL OF EFFORT |
| August 26, 2025 | P00062 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - INCORPORATION OF ATTCH E AND FUNDING SWAP |
| June 12, 2025 | P00061 | OTHER ADMINISTRATIVE ACTION | no money | THE PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - FUNDING ACTION FOR OP 5 |
| June 5, 2025 | P00060 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$21,417,530 | THE PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - FUNDING ACTION FOR OP 5 |
| May 30, 2025 | P00059 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$496,533 | THE PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - FUNDING ACTION FOR OP 5 |
| May 1, 2025 | P00058 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,919,504 | THE PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - EXERCISE OP 5 |
| February 12, 2025 | P00057 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$1,997,418 | PIVOT-I CLIN DEOBIGATION MODIFICATION |
| November 19, 2024 | P00056 | OTHER ADMINISTRATIVE ACTION | no money | THE PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) |
| October 4, 2024 | P00055 | OTHER ADMINISTRATIVE ACTION | no money | PIVOT-I: COR REPLACEMENT |
| September 30, 2024 | P00054 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$91,272 | PIVOT-I - PIVOT-H INTEGRATION WITH SNOW TRANSITION-IN |
| September 27, 2024 | P00053 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$239,242 | PIVOT-I -CHANGES TO PWS AND SERVICE CATALOG FUNDING |
| September 25, 2024 | P00052 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$1,562,938 | PIVOT-I - DE-OB EXCESS FUNDS THROUGH OY2 |
| September 24, 2024 | P00051 | CHANGE ORDER | +$815,639 | PIVOT-I CHANGES MODIFICATION - CYBERARK, SERVICE CATALOG FUNDING AND ADDITIONAL ITEM SDWAN SITES |
| July 26, 2024 | P00050 | CHANGE ORDER | +$36,398 | PIVOT-I - CHANGE CASB TO INCLUDE ADEM FUNCTIONALITY. |
| June 20, 2024 | P00049 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$665,182 | PIVOT-I- SERVICE CATALOG INCREASE. |
| May 30, 2024 | P00048 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$232,296 | PIVOT-I - SERVICE CATALOG INCREASE |
| May 2, 2024 | P00047 | OTHER ADMINISTRATIVE ACTION | no money | PIVOT-I - REVISE/REPLACE LINES OF ACCOUNTING FOR CLINS EXECUTED ON MOD P00046 |
| April 26, 2024 | P00046 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$26,795,386 | PIVOT-I - AWARD TERM 2 EXECUTION AND PWS CHANGES. |
| September 30, 2023 | P00044 | OTHER ADMINISTRATIVE ACTION | no money | PIVOT-I. |
| September 28, 2023 | P00043 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,222,088 | PIVOT-I CORE SERVICES MIGRATOIN |
| September 27, 2023 | P00042 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,120,509 | PIVOT-I. TASK 1 PROGRAM MANAGEMENT, SUBTASK 5.3 PIVOT DC LOCATION HELP DESK SERVICE DEPOT, SUBTASK 13.4.6 EXECUTIVE SUPPORT SERVICES, AND FUNDING FOR SERVICE CATALOG AND ADJUSTMENTS TO TASK 5 AND 6. |
| September 21, 2023 | P00041 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$36,220 | PIVOT-I. PURPOSE OF THIS MODIFICATION IS TO DECREASE FUNDS FOR CLIN 5001AN AT1 TASK 13 FOR REGIONAL TECH ADJUSTMENT, UPDATE AT1 SERVICE CATALOG, AND TO INCORPORATE CLAUSE 52.204-27. |
| September 6, 2023 | P00040 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$15,291 | PIVOT-I. FUNDING INCREASE AND DE-OBLIGATION AS A RESULT OF CONSIDERATION. |
| May 31, 2023 | P00039 | OTHER ADMINISTRATIVE ACTION | no money | PIVOT-I ADD ACOR |
| April 28, 2023 | P00038 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$23,702,927 | PIVOT-I: THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE THE AWARD TERM 1. |
| April 20, 2023 | P00037 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,268 | PIVOT-I UPDATES THE PWS TO INCLUDE: ADDITIONAL DETAIL ON THE IMPLEMENTATION OF WINDOWS DEFENDER, CHANGE THE COMPLETION DATE OF THE COLO MOVE, PROVIDE FUNDING FOR ASSISTIVE TECHNOLOGY SUPPORT IN CA, AND UPDATE THE AWARD TERM PLAN. |
| March 19, 2023 | P00045 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$309,818 | PIVOT-I. MODIFICATION TO REVISED SDWAN AND DLP. |
| March 2, 2023 | P00036 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$70,550 | PIVOT-I- CO-LOCATION MOVE |
| December 7, 2022 | P00035 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | PIVOT-I SERVICE CATALOG AND KEY PERSONNEL CHANGE |
| September 30, 2022 | P00034 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | PIVOT-I PWS CHANGES. |
| September 28, 2022 | P00033 | ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | +$6,683,725 | PIVOT-I ZTA SUPPORT |
| September 27, 2022 | P00032 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$603,900 | PIVOT-I SERVICE CATALOG FUNDING |
| August 10, 2022 | P00031 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,186,739 | PIVOT-I- SERVICE CATALOG FUNDING |
| June 23, 2022 | P00030 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$77,304 | PIVOT-I- EDISCOVERY LICENSE INCREASE, MACHINE RECOVERY |
| May 2, 2022 | P00029 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$191,431 | PIVOT-I EXECUTIVE SUPPORT SERVICES |
| April 13, 2022 | P00028 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$17,413,589 | PIVOT-I OPTION PERIOD IV. |
| March 16, 2022 | P00027 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$104,646 | PIVOT-I CFE TO GFE, KEY PERSONNEL UPDATE, AWARD OP4 WITH AWARD TERM 1 |
| October 27, 2021 | P00026 | OTHER ADMINISTRATIVE ACTION | no money | PIVOT-I- NAME CHANGE FROM SRA TO GDIT. NOVATION COMPLETED BY HHS. |
| September 29, 2021 | P00025 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,387,913 | PIVOT-I SERVICE CATALOG FUNDING, CLAUSE UPDATE, MINOR INCREASE ON EXECUTIVE SUPPORT. |
| August 12, 2021 | P00024 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,442 | MOVE FROM OPTION PERIOD 03 MOVE FROM LBJ BC105B TO PCP 3211/3212 |
| May 28, 2021 | P00023 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$446,677 | SERVICE CATALOG INCREASE |
| April 29, 2021 | P00022 | EXERCISE AN OPTION | +$17,539,207 | PIVOT-I OPTION PERIOD III |
| April 23, 2021 | P00021 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$150,375 | PIVOT-I: REMOVAL OF VDI |
| March 12, 2021 | P00020 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,660 | ON-SITE TIER 2/3 SUPPORT |
| February 26, 2021 | P00019 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$38,903 | PIVOT-I ADD TEST.ED.GOV. |
| December 16, 2020 | P00018 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | PIVOT-I CORRECT CLIN 1019 AND CLIN 2019 TO REFLECT THE VALUE LISTED IN MODIFICATION P0007 AND P00013'S OPTION EXERCISE LANGUAGE |
| November 20, 2020 | P00017 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$34,882 | PIVOT-I SUPPORT FOR ZOOM. |
| September 30, 2020 | P00016 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,049,132 | PIVOT-I VPN, TASK 7/8 CHANGES |
| September 23, 2020 | P00015 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$283,338 | PIVOT I - CLEVELAND TECH, PIV-ALT, SECRETARY STUDIO, KEY PERSONNEL CHANGE |
| August 25, 2020 | P00014 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,193,429 | PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I)- LABOR ADJUSTMENT AND CATCH AND RELEASE |
| April 30, 2020 | P00013 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$16,383,234 | PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - THE PIVOT-I CONTRACTOR IS RESPONSIBLE FOR THE TECHNICAL MANAGEMENT AND INTEGRATION OF PIVOT IT INFRASTRUCTURE SERVICES |
| September 30, 2019 | P00012 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$11,694,053 | CRITICAL FUNCTIONS: PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - THE PIVOT-I CONTRACTOR IS RESPONSIBLE FOR THE TECHNICAL MANAGEMENT AND INTEGRATION OF PIVOT IT INFRASTRUCTURE SERVICES. |
| September 12, 2019 | P00011 | FUNDING ONLY ACTION | +$754,875 | CRITICAL FUNCTIONS: PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - THE PIVOT-I CONTRACTOR IS RESPONSIBLE FOR THE TECHNICAL MANAGEMENT AND INTEGRATION OF PIVOT IT INFRASTRUCTURE SERVICES. |
| August 16, 2019 | P00010 | OTHER ADMINISTRATIVE ACTION | −$127,487 | CRITICAL FUNCTIONS: PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - THE PIVOT-I CONTRACTOR IS RESPONSIBLE FOR THE TECHNICAL MANAGEMENT AND INTEGRATION OF PIVOT IT INFRASTRUCTURE SERVICES. |
| August 1, 2019 | P00009 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$178,158 | THIS REQUIREMENT IS TO PROVIDE INFORMATION TECHNOLOGY INTEGRATION SERVICES. |
| June 6, 2019 | P00008 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,070,418 | THIS REQUIREMENT IS TO ACQUIRE A WORK PLACE AS A SERVICE SOLUTION. |
| May 16, 2019 | P00007 | FUNDING ONLY ACTION | +$8,450,904 | PROVIDE COMPUTER RESOURCES FOR STAFF. |
| May 16, 2019 | P00006 | FUNDING ONLY ACTION | −$8,450,904 | THE PURPOSE OF THIS REQUIREMENT IS TO ACQUIRE THE NECESSARY INFORMATION TECHNOLOGY SERVICES FOR THE DEPARTMENT TO CARRY OUT ITS DAY TO DAY OPERATIONS. |
| April 25, 2019 | P00005 | EXERCISE AN OPTION | +$8,450,904 | CRITICAL FUNCTIONS: PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - THE PIVOT-I CONTRACTOR IS RESPONSIBLE FOR THE TECHNICAL MANAGEMENT AND INTEGRATION OF PIVOT IT INFRASTRUCTURE SERVICES. |
| February 11, 2019 | P00004 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,192,312 | CRITICAL FUNCTIONS: PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - THE PIVOT-I CONTRACTOR IS RESPONSIBLE FOR THE TECHNICAL MANAGEMENT AND INTEGRATION OF PIVOT IT INFRASTRUCTURE SERVICES. |
| December 19, 2018 | P00003 | FUNDING ONLY ACTION | +$8,554,761 | CRITICAL FUNCTIONS: PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - THE PIVOT-I CONTRACTOR IS RESPONSIBLE FOR THE TECHNICAL MANAGEMENT AND INTEGRATION OF PIVOT IT INFRASTRUCTURE SERVICES |
| November 1, 2018 | P00001 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - THE PIVOT-I CONTRACTOR IS RESPONSIBLE FOR THE TECHNICAL MANAGEMENT AND INTEGRATION OF PIVOT IT INFRASTRUCTURE SERVICES. |
| February 24, 2018 | base | not on file | +$3,308,141 | CRITICAL FUNCTIONS: PORTFOLIO OF INTEGRATED VALUE-ORIENTED TECHNOLOGIES - INTEGRATION (PIVOT-I) - THE PIVOT-I CONTRACTOR IS RESPONSIBLE FOR THE TECHNICAL MANAGEMENT AND INTEGRATION OF PIVOT IT INFRASTRUCTURE SERVICES. |