GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC.
Federal contract award, General Dynamics Information Technology, $70,483,722
Key CONT_AWD_N0017820F3012_9700_N0017819D7693_9700. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 94 days before this system saw it. One version on record.
Cite this row
7c9b3efce8bf8ffec0e317f2759c57e00e71931930276f7fd5cdbcb12a9915eaThe source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $70,483,722 | first version | May 26, 2020 | June 3, 2026 | 2026-09-05T01:08:53Z | historical sweep | 7c9b3efce8bf |
Archived copy
None on file. An archived copy is optional corroboration and never a condition of this filing’s provenance, which is the stored response and its hash above; see the methodology page.
What the amount is made of
107 recorded actions, so the amount is the award's current total across all of them. 86 of them obligated money. Measured 2026-09-15, when USAspending reported a total obligation of $70,483,722.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| June 3, 2026 | P00106 | EXERCISE AN OPTION | +$10,000 | ISEA/STEI |
| May 21, 2026 | P00105 | OTHER ADMINISTRATIVE ACTION | no money | ISEA/STEI |
| May 14, 2026 | P00104 | FUNDING ONLY ACTION | −$106,000 | ISEA/STEI |
| April 15, 2026 | P00103 | OTHER ADMINISTRATIVE ACTION | no money | ISEA/STEI |
| March 25, 2026 | P00102 | OTHER ADMINISTRATIVE ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| March 24, 2026 | P00101 | FUNDING ONLY ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| March 13, 2026 | P00100 | FUNDING ONLY ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| February 26, 2026 | P00099 | FUNDING ONLY ACTION | +$1,200,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| February 19, 2026 | P00098 | FUNDING ONLY ACTION | −$84,140 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| December 12, 2025 | P00097 | FUNDING ONLY ACTION | +$1,870,272 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| November 25, 2025 | P00096 | OTHER ADMINISTRATIVE ACTION | +$602,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| November 17, 2025 | P00095 | OTHER ADMINISTRATIVE ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| October 24, 2025 | P00094 | OTHER ADMINISTRATIVE ACTION | +$248,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 25, 2025 | P00093 | OTHER ADMINISTRATIVE ACTION | +$426,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 18, 2025 | P00092 | FUNDING ONLY ACTION | +$571,856 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| August 22, 2025 | P00091 | FUNDING ONLY ACTION | +$1,541,500 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| July 31, 2025 | P00090 | FUNDING ONLY ACTION | +$834,219 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| July 15, 2025 | P00089 | FUNDING ONLY ACTION | +$44,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| June 23, 2025 | P00088 | FUNDING ONLY ACTION | +$956,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| June 13, 2025 | P00087 | FUNDING ONLY ACTION | +$1,789,826 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| June 5, 2025 | P00086 | FUNDING ONLY ACTION | +$86,402 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| June 2, 2025 | P00085 | FUNDING ONLY ACTION | +$400,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| May 16, 2025 | P00084 | FUNDING ONLY ACTION | +$228,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| May 6, 2025 | P00083 | FUNDING ONLY ACTION | +$334,150 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| April 28, 2025 | P00082 | FUNDING ONLY ACTION | +$211,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| April 22, 2025 | P00081 | FUNDING ONLY ACTION | +$370,859 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| March 11, 2025 | P00080 | FUNDING ONLY ACTION | +$582,928 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| February 28, 2025 | P00079 | FUNDING ONLY ACTION | −$48,408 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| February 13, 2025 | P00078 | FUNDING ONLY ACTION | +$1,680,777 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| December 23, 2024 | P00077 | FUNDING ONLY ACTION | +$425,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| December 11, 2024 | P00076 | FUNDING ONLY ACTION | +$935,362 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| December 10, 2024 | P00075 | FUNDING ONLY ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| November 1, 2024 | P00074 | FUNDING ONLY ACTION | +$172,556 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 27, 2024 | P00073 | FUNDING ONLY ACTION | +$545,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 20, 2024 | P00072 | FUNDING ONLY ACTION | +$732,395 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| August 30, 2024 | P00071 | FUNDING ONLY ACTION | +$612,386 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| August 21, 2024 | P00070 | FUNDING ONLY ACTION | +$845,902 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| July 23, 2024 | P00069 | FUNDING ONLY ACTION | +$103,680 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| July 1, 2024 | P00068 | FUNDING ONLY ACTION | +$1,450,637 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| May 30, 2024 | P00067 | EXERCISE AN OPTION | +$2,628,354 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| April 30, 2024 | P00066 | FUNDING ONLY ACTION | +$555,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| March 28, 2024 | P00065 | FUNDING ONLY ACTION | +$388,909 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| March 5, 2024 | P00064 | FUNDING ONLY ACTION | +$1,000,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| February 16, 2024 | P00063 | FUNDING ONLY ACTION | +$186,781 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| January 5, 2024 | P00062 | FUNDING ONLY ACTION | +$1,913,077 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| December 19, 2023 | P00061 | FUNDING ONLY ACTION | +$319,099 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| November 21, 2023 | P00060 | FUNDING ONLY ACTION | +$458,287 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| November 3, 2023 | P00059 | FUNDING ONLY ACTION | +$540,011 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 19, 2023 | P00058 | FUNDING ONLY ACTION | +$812,099 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| August 25, 2023 | P00057 | FUNDING ONLY ACTION | +$122,432 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| August 4, 2023 | P00056 | FUNDING ONLY ACTION | +$773,871 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| July 25, 2023 | P00055 | FUNDING ONLY ACTION | +$1,180,120 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| June 13, 2023 | P00054 | FUNDING ONLY ACTION | +$28,500 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| June 1, 2023 | P00053 | FUNDING ONLY ACTION | +$130,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| May 25, 2023 | P00052 | EXERCISE AN OPTION | +$5,486,540 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| May 5, 2023 | P00051 | FUNDING ONLY ACTION | +$151,999 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| March 20, 2023 | P00050 | FUNDING ONLY ACTION | +$545,721 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| February 22, 2023 | P00049 | FUNDING ONLY ACTION | +$2,145,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| January 30, 2023 | P00048 | OTHER ADMINISTRATIVE ACTION | +$50,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| December 16, 2022 | P00047 | OTHER ADMINISTRATIVE ACTION | +$1,440,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| November 17, 2022 | P00046 | OTHER ADMINISTRATIVE ACTION | +$275,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 28, 2022 | P00045 | OTHER ADMINISTRATIVE ACTION | +$29,532 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 27, 2022 | P00044 | ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | −$32,200 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 19, 2022 | P00043 | FUNDING ONLY ACTION | +$67,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 16, 2022 | P00042 | FUNDING ONLY ACTION | +$714,285 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 9, 2022 | P00041 | OTHER ADMINISTRATIVE ACTION | −$147,780 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 6, 2022 | P00040 | FUNDING ONLY ACTION | +$1,205,087 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| August 5, 2022 | P00039 | ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | −$371,284 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| July 27, 2022 | P00038 | FUNDING ONLY ACTION | +$18,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| July 19, 2022 | P00037 | FUNDING ONLY ACTION | +$3,347,280 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| June 3, 2022 | P00036 | OTHER ADMINISTRATIVE ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| May 27, 2022 | P00035 | EXERCISE AN OPTION | +$4,688,069 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| May 13, 2022 | P00034 | ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | −$514,344 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| April 25, 2022 | P00033 | ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | −$887,458 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| April 12, 2022 | P00032 | ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| March 24, 2022 | P00031 | ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| March 10, 2022 | P00030 | ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | +$450,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| February 28, 2022 | P00029 | FUNDING ONLY ACTION | +$602,172 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| January 7, 2022 | P00028 | FUNDING ONLY ACTION | +$40,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| December 6, 2021 | P00027 | OTHER ADMINISTRATIVE ACTION | +$2,000,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| November 18, 2021 | P00026 | OTHER ADMINISTRATIVE ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 28, 2021 | P00025 | FUNDING ONLY ACTION | −$0 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| August 27, 2021 | P00024 | FUNDING ONLY ACTION | +$1,683,331 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| August 11, 2021 | P00023 | FUNDING ONLY ACTION | −$107,711 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| July 22, 2021 | P00022 | OTHER ADMINISTRATIVE ACTION | +$1,263,441 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| June 21, 2021 | P00021 | OTHER ADMINISTRATIVE ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| June 11, 2021 | P00020 | OTHER ADMINISTRATIVE ACTION | +$557,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| June 2, 2021 | P00019 | OTHER ADMINISTRATIVE ACTION | +$4,992,766 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| May 6, 2021 | P00018 | OTHER ADMINISTRATIVE ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| April 16, 2021 | P00017 | OTHER ADMINISTRATIVE ACTION | +$841,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| March 29, 2021 | P00016 | OTHER ADMINISTRATIVE ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| March 11, 2021 | P00015 | OTHER ADMINISTRATIVE ACTION | +$2,465,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| February 11, 2021 | P00014 | OTHER ADMINISTRATIVE ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| February 2, 2021 | P00013 | OTHER ADMINISTRATIVE ACTION | +$1,145,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| January 21, 2021 | P00012 | OTHER ADMINISTRATIVE ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| January 13, 2021 | P00011 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$300,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| December 10, 2020 | P00010 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$275,834 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| December 1, 2020 | P00009 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| November 24, 2020 | P00008 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,222,201 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| October 20, 2020 | P00007 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| September 1, 2020 | P00006 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,376,854 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| August 12, 2020 | P00005 | FUNDING ONLY ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| July 28, 2020 | P00004 | FUNDING ONLY ACTION | +$1,457,689 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| June 24, 2020 | P00003 | FUNDING ONLY ACTION | +$300,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| June 22, 2020 | P00002 | OTHER ADMINISTRATIVE ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT. |
| June 3, 2020 | P00001 | OTHER ADMINISTRATIVE ACTION | no money | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
| May 26, 2020 | base | not on file | +$800,000 | SPECIAL TECHNOLOGIES ENGINEERING AND INTEGRATION (STEI) SUPPORT |
Last refreshed November 4, 2026 at 2:31 PM UTC.