GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC.

Federal contract award, General Dynamics Information Technology, $922,918

Key CONT_AWD_N6449821F3051_9700_N6449818D4020_9700. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 94 days before this system saw it. One version on record.

Cite this row

On this site https://evidence.ourrevolution.media/filings/general-dynamics-information-technology/CONT_AWD_N6449821F3051_9700_N6449818D4020_9700
At the source https://www.usaspending.gov/award/CONT_AWD_N6449821F3051_9700_N6449818D4020_9700
Observed 2026-09-05, version 1, retrieved 2026-09-05T01:10:20Z
Content hash bf8561cf865d3cdb4b5b80cc516eb7863026038898905a203c100eec75865cd9

The source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.

Versions

VersionAmountChangeOccurredPublishedRetrievedHow it arrivedContent hash
1
current
$922,918first versionAugust 9, 2021June 3, 20262026-09-05T01:10:20Zhistorical sweepbf8561cf865d

Archived copy

None on file. An archived copy is optional corroboration and never a condition of this filing’s provenance, which is the stored response and its hash above; see the methodology page.

What the amount is made of

10 recorded actions, so the amount is the award's current total across all of them. 7 of them obligated money. Measured 2026-09-12, when USAspending reported a total obligation of $922,918.

Action dateModificationTypeObligatedDescription as recorded
June 3, 2026P00009OTHER ADMINISTRATIVE ACTION−$23,573ENGINEERING AND TECHNICAL SERVICES
June 20, 2025P00008CHANGE ORDER+$17,000PERFORMING INSTALLATIONS
June 2, 2025P00007CHANGE ORDERno moneyPERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM (BCMS)
March 18, 2025P00006CHANGE ORDER−$6,038PERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM (BCMS).
July 29, 2024P00005CHANGE ORDERno moneyPERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM (BCMS), STACK GAS ANALYZER (SGA), BOILER IGNITION SYSTEM (BIS), AUTOMATIC COMBUSTION TRIM LOOP (TL), DISTILLATE PUMP/MOTOR, AND DFT SYSTEMS
June 10, 2024P00004FUNDING ONLY ACTION+$66,000PERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM (BCMS), STACK GAS ANALYZER (SGA), BOILER IGNITION SYSTEM (BIS), AUTOMATIC COMBUSTION TRIM LOOP (TL), DISTILLATE PUMP/MOTOR, AND DFT SYSTEMS
September 19, 2023P00003FUNDING ONLY ACTIONno moneyPERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM (BCMS), STACK GAS ANALYZER (SGA), BOILER IGNITION SYSTEM (BIS), AUTOMATIC COMBUSTION TRIM LOOP (TL),
September 29, 2022P00002FUNDING ONLY ACTION+$568,757THE PURPOSE OF THIS MODIFICATION IS TO 1) DEOBLIGATE FUNDS UNDER SLINS 0001AB 0001AC 0004AB AND 0004AC. 2) APPLY INCREMENTAL FUNDING IN THE AMOUNT OF $800,926.25. 3) EXTEND THE OVERARCHING POP END DATE FROM 2/28/2023 TO 9/13/2023
September 20, 2021P00001FUNDING ONLY ACTION+$100,771THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $100,771.12 TO CLIN 0001 (LABOR) AND CLIN 0004 (ODC).
August 9, 2021basenot on file+$200,000PERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM (BCMS), STACK GAS ANALYZER (SGA), AND RELATED SYSTEMS IN SUPPORT OF NSWCPD STEAM SYSTEM BRANCH SYSTEMS WEST COAST

Last refreshed November 4, 2026 at 2:31 PM UTC.