GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC.

Federal contract award, General Dynamics Information Technology, $1,140,988

Key CONT_AWD_N6449823F3046_9700_N6449818D4020_9700. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 285 days before this system saw it. One version on record.

Cite this row

On this site https://evidence.ourrevolution.media/filings/general-dynamics-information-technology/CONT_AWD_N6449823F3046_9700_N6449818D4020_9700
At the source https://www.usaspending.gov/award/CONT_AWD_N6449823F3046_9700_N6449818D4020_9700
Observed 2026-09-05, version 1, retrieved 2026-09-05T01:10:14Z
Content hash e6047626c65628e6eebca2c6fb0630ada91ac4c6ac137c555e0f2541822e7bfb

The source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.

Versions

VersionAmountChangeOccurredPublishedRetrievedHow it arrivedContent hash
1
current
$1,140,988first versionFebruary 15, 2023November 24, 20252026-09-05T01:10:14Zhistorical sweepe6047626c656

Archived copy

None on file. An archived copy is optional corroboration and never a condition of this filing’s provenance, which is the stored response and its hash above; see the methodology page.

What the amount is made of

11 recorded actions, so the amount is the award's current total across all of them. 5 of them obligated money. Measured 2026-09-12, when USAspending reported a total obligation of $1,140,988.

Action dateModificationTypeObligatedDescription as recorded
November 24, 2025P00010CHANGE ORDERno moneyPERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM (BCMS), STACK GAS ANALYZER (SGA), BOILER IGNITION SYSTEM (BIS), AUTOMATIC COMBUSTION TRIM LOOP (TL), DISTILLATE PUMP/MOTOR, AND DFT SYSTEMS
June 30, 2025P00009CHANGE ORDER+$38,500PERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BCMS, SGA, BIS, AUTOMATIC COMBUSTION TL, DISTILLATE PUMP/MOTOR, AND DFT SYSTEMS, SOOT BLOWER SYSTEMS AND RELATED SYSTEMS IN SUPPORT OF NSWCPD STEAM SYSTEM BRANCH SYSTEMS
April 24, 2025P00008CHANGE ORDERno moneyPERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM (BCMS), STACK GAS ANALYZER (SGA), BOILER IGNITION SYSTEM (BIS)
February 13, 2025P00007CHANGE ORDERno moneyPERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM (BCMS), STACK GAS ANALYZER (SGA), BOILER IGNITION SYSTEM (BIS), AUTOMATIC COMBUSTION TRIM LOOP (TL), DISTILLATE PUMP/MOTOR.
January 30, 2025P00006CHANGE ORDERno moneyPERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM (BCMS), STACK GAS ANALYZER (SGA), BOILER IGNITION SYSTEM (BIS)
December 6, 2024P00005CHANGE ORDER+$20,000PERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM, STACK GAS ANALYZER, BOILER IGNITION SYSTEM, AUTOMATIC COMBUSTION TRIM LOOP, DISTILLATE PUMP/MOTOR, AND DFT SYSTEMS, SOOT BLOWER SYSTEMS AND RELATED SYSTEM
June 5, 2024P00004CHANGE ORDER+$162,406PERFORMING INSTALLATIONS, REPAIRS, UPGRADES,AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM, STACK GAS ANALYZER, BOILER IGNITION SYSTEM,AUTOMATIC COMBUSTION TRIM LOOP, DISTILLATE PUMP/MOTOR, AND DFT SYSTEMS, SOOT BLOWER SYSTEMS AND RELATED SYSTEMS.
April 18, 2024P00003CHANGE ORDERno moneyPERFORMING INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS TO BOILER COMBUSTION MONITORING SYSTEM, STACK GAS ANALYZER, BOILER IGNITION SYSTEM,AUTOMATIC COMBUSTION TRIM LOOP,DISTILLATE PUMP/MOTOR,AND DFT SYSTEMS, SOOT BLOWER SYSTEMS AND RELATED SYSTEMS.
February 14, 2024P00002CHANGE ORDERno moneyPERFORMING INSTALLATIONS, REPAIRS, UPGRADES,GROOMS TO BOILER COMBUSTION MONITORING SYSTEM (BCMS), STACK GAS ANALYZER (SGA), BOILER IGNITION SYSTEM (BIS), AUTOMATIC COMBUSTION TRIM LOOP (TL), DISTILLATE PUMP/MOTOR,DFT SYSTEMS, SOOT BLOWER SYSTEMS.
April 24, 2023P00001FUNDING ONLY ACTION+$770,082PERFORMING INSTALLATIONS, REPAIRS, UPGRADES, GROOMS TO BOILER COMBUSTION MONITORING SYSTEM, STACK GAS ANALYZER, BOILER IGNITION SYSTEM, AUTOMATIC COMBUSTION TRIM LOOP, DISTILLATE PUMP/MOTOR, AND DFT SYSTEMS SUPPORTING OF NSWCPD STEAM SBS.
February 15, 2023basenot on file+$150,000INSTALLATIONS, REPAIRS, UPGRADES, AND GROOMS