LEIDOS, INC.
Federal contract award, Leidos, $937,884,235
Key CONT_AWD_47QFCA22F0051_4732_GS00Q14OADU122_4732. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 12 days before this system saw it. One version on record.
Cite this row
cbbfae2866ecc3a022dbe1f1ca92316b60f0a7b043704ddac13124e469602526The source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $937,884,235 | first version | September 14, 2022 | August 24, 2026 | 2026-09-05T00:54:19Z | historical sweep | cbbfae2866ec |
Archived copy
https://web.archive.org/web/20260520162627/https://www.usaspending.gov/award/CONT_AWD_47QFCA22F0051_4732_GS00Q14OADU122_4732 found, made by someone else, May 20, 2026
What the amount is made of
71 recorded actions, so the amount is the award's current total across all of them. 62 of them obligated money. Measured 2026-10-13, when USAspending reported a total obligation of $1,031,809,186.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| September 30, 2026 | P00070 | FUNDING ONLY ACTION | +$937,000 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR OY4 CLINS AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| September 29, 2026 | P00069 | FUNDING ONLY ACTION | +$19,884,038 | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND OY4 CLINS, DE-OBLIGATE FUNDS FROM OY2 AND OY3 CLINS AND RE-OBLIGATE THEM TO OY4 CLINS, REALIGN FUNDING IN OY3 AND OY4 CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| September 16, 2026 | P00068 | FUNDING ONLY ACTION | +$13,757,594 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE OY2 FUNDING, DE-OBLIGATE OY3 FUNDING, PROVIDE INCREMENTAL FUNDING TO OY4, REALLOCATE OY4 FUNDING, RE-OBLIGATE FUNDING TO OY4, AND INCORPORATE ADMINISTRATIVE CHANGES. |
| September 9, 2026 | P00067 | FUNDING ONLY ACTION | +$59,346,319 | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN OY1, OY2, OY3 AND OY4 CEILING, DEOBLIGATE OY2 FUNDING, REALIGN OY3 FUNDING, DEOBLIGATE OY3 FUNDING, PROVIDE INCREMENTAL FUNDING TO OY4, REOBLIGATE FUNDING TO OY4, AND INCORPORATE ADMINISTRATIVE CHANGES. |
| August 17, 2026 | P00066 | FUNDING ONLY ACTION | +$15,309,241 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING TO OY4 CLINS, REALLOCATE FUNDING WITHIN OY3 CLINS, DEOBLIGATE OY3 FUNDING AND REOBLIGATE THEM TO OY4, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| July 29, 2026 | P00065 | FUNDING ONLY ACTION | +$9,969,821 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OY4, INCREMENTALLY FUND OY4 AND OY3 CLINS, REALLOCATE FUNDING WITHIN OY3 CLINS, DEOBLIGATE FUNDING FROM OY3 AND REOBLIGATE THEM TO OY4, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| June 30, 2026 | P00064 | FUNDING ONLY ACTION | +$25,287,642 | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND OY3 CLINS, REALIGN OY3 FUNDING, DEOBLIGATE OY3 AWARD FEE PERIOD 7 FUNDING, DEOBLIGATE OY2 AWARD FEE PERIOD 6 FUNDING AND REOBLIGATE THEM TO OY3, AND INCORPORATE ADMINISTRATIVE CHANGES. |
| May 21, 2026 | P00063 | FUNDING ONLY ACTION | +$47,203,531 | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND OY3 CLINS, REALIGN FUNDING IN OY3 CLINS, DEOBLIGATE FUNDING IN OY3 CLINS AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. UPDATES TO ADDRESS EO 14398. |
| April 29, 2026 | P00062 | FUNDING ONLY ACTION | +$24,272,650 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDING INCREMENTAL FUNDING FOR OY3 CLINS, DEOBLIGATE FROM OY1 CLINS, DEOBLIGATE OY2 AWARD FEE FUNDING, REALIGN OY3 FUNDING, REOBLIGATE FUNDING TO OY3 AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| April 6, 2026 | P00061 | FUNDING ONLY ACTION | +$24,110,745 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING TO OY3 CLINS, REALIGN FUNDING IN OY3 CLINS, DEOBLIGATE FUNDING FROM OY3 CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| March 4, 2026 | P00060 | OTHER ADMINISTRATIVE ACTION | +$65,930,731 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING TO OY3 CLINS AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| February 24, 2026 | P00059 | OTHER ADMINISTRATIVE ACTION | +$10,070,261 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING TO OY3 CLINS, REALLOCATE FUNDING IN OY3 CLINS, DE-OBLIGATE FUNDING FROM OY2 CLINS, RE-OBLIGATE FUNDING TO OY3 CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| January 28, 2026 | P00058 | OTHER ADMINISTRATIVE ACTION | +$8,317,511 | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO OY3 CLINS, REALLOCATE FUNDING IN OY3 CLINS, DEOBLIGATE FUNDING FROM OY2 CLINS AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| December 22, 2025 | P00057 | OTHER ADMINISTRATIVE ACTION | +$14,117,073 | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING, REALLOCATE FUNDING, AND DO DEOB AND REOB. |
| December 12, 2025 | P00056 | FUNDING ONLY ACTION | +$28,210,000 | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN CEILING FROM BY, OY1, OY2 CLINS TO OY3 CLINS, INCREMENTALLY FUND OY3 CLINS, DEOBLIGATE FUNDING FROM OY2 CLINS AND REOBLIGATE THEM TO OY3 CLINS AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| November 25, 2025 | P00055 | FUNDING ONLY ACTION | +$1,512,196 | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND OY3 CLINS, REALLOCATE FUNDING WITHIN OY3 CLINS, DEOBLIGATE FUNDING FROM OY2 CLINS AND REOBLIGATE THEM TO OY3 CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| October 20, 2025 | P00054 | FUNDING ONLY ACTION | +$1,073,171 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR OY3, REALLOCATE FUNDING WITHIN OY3 AND OY2 CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| September 29, 2025 | P00053 | FUNDING ONLY ACTION | +$12,758,972 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR OY3, REALLOCATE FUNDING WITHIN OY3, DEOBLIGATE OY2 FUNDING AND REOBLIGATE THEM TO OY3, DEOBLIGATE OY2 FUNDING, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| September 12, 2025 | P00052 | FUNDING ONLY ACTION | +$8,221,193 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR OY3, REALLOCATE FUNDING WITHIN OY3,DEOBLIGATE OY2 FUNDING AND REOBLIGATE THEM TO OY3, DEOBLIGATE OY2 FUNDING, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| September 5, 2025 | P00051 | FUNDING ONLY ACTION | +$28,933,757 | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND OY3 AND OY2 CLINS, REALLOCATE FUNDING WITHIN OY2 CLINS, DE-OBLIGATE FUNDING FROM OY2 CLINS AND RE-OBLIGATE THEM TO OY3 CLINS, AND DE-OBLIGATE FUNDING FROM OY2 CLINS. |
| August 26, 2025 | P00050 | FUNDING ONLY ACTION | +$27,798,978 | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND OY3 CLINS, DE-OBLIGATE FUNDING FROM OY2 CLINS AND RE-OBLIGATE THEM TO OY3 CLINS, DE-OBLIGATE FUNDING FROM OY1 CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| August 13, 2025 | P00049 | CHANGE ORDER | +$34,640,319 | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND OY3 AND OY2 CLINS, REALLOCATE FUNDING WITHIN OY2 CLINS, DEOBLIGATE FUNDING FROM OY2 CLINS AND REOBLIGATE THEM TO OY3 CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| August 4, 2025 | P00048 | EXERCISE AN OPTION | +$635,971 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD 3, PROVIDE INCREMENTAL FUNDING FOR OY2 CLINS, REALLOCATE FUNDING IN OY2 CLINS, DEOBLIGATE FUNDING FROM OY2 CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| July 11, 2025 | P00047 | OTHER ADMINISTRATIVE ACTION | +$13,745,861 | SENTINEL |
| June 9, 2025 | P00046 | FUNDING ONLY ACTION | +$1,585,147 | SENTINEL |
| May 27, 2025 | P00045 | FUNDING ONLY ACTION | +$5,636,597 | THE PURPOSE OF THE MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE TASK ORDER, TO INCREMENTALLY FUND OY2 CLINS AND REALIGNMENT AND REALLOCATION OF FUNDS OY2 CLINS. |
| April 28, 2025 | P00044 | FUNDING ONLY ACTION | +$3,954,939 | SENTINEL |
| April 9, 2025 | P00043 | FUNDING ONLY ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO REALLOCATE FUNDING WITHIN OY2 CLINS AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| March 31, 2025 | P00042 | FUNDING ONLY ACTION | +$19,540,902 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR OY2, REALLOCATE OY2 FUNDING AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| March 14, 2025 | P00041 | OTHER ADMINISTRATIVE ACTION | +$10,997,876 | SENTINEL |
| February 25, 2025 | P00040 | OTHER ADMINISTRATIVE ACTION | +$35,975,240 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE OY2 FUNDING, PROVIDE INCREMENTAL FUNDING FOR OY2, RE-ALLOCATE OY2 FUNDING, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| January 29, 2025 | P00039 | OTHER ADMINISTRATIVE ACTION | +$7,717,786 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE OY1 FUNDING, DE-OBLIGATE OY1 FUNDS AND RE-OBLIGATE THEM TO OY2, PROVIDE INCREMENTAL FUNDING FOR OY2, RE-ALLOCATE OY2 FUNDING, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| December 20, 2024 | P00038 | OTHER ADMINISTRATIVE ACTION | +$15,075,755 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE BY, OOY1 AND OY2 FUNDING, DE-OBLIGATE OY1 FUNDS AND RE-OBLIGATE THEM TO OY2, PROVIDE INCREMENTAL FUNDING, RE-ALLOCATE OY2 FUNDING, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| November 27, 2024 | P00037 | OTHER ADMINISTRATIVE ACTION | +$985,586 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING FROM OY1 CLINS, INCREMENTAL FUND OY2 CLINS, RE-ALLOCATE FUNDING WITHIN OY2 CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| November 13, 2024 | P00036 | OTHER ADMINISTRATIVE ACTION | +$9,329,418 | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE OY1 AND OY2 FUNDING, REALLOCATE OY2 FUNDING, INCREMENTALLY FUND OY2, UPDATE ATTACHMENT D AWARD FEE DETERMINATION PLAN, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| September 30, 2024 | P00035 | OTHER ADMINISTRATIVE ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO RE-ALLOCATE OY2 FUNDING AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| September 30, 2024 | P00034 | OTHER ADMINISTRATIVE ACTION | +$5,545,405 | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM OY1 AND RE-OBLIGATE THEM TO OY2, DEOBLIGATE FUNDING FROM OY2 AND RE-OBLIGATE THEM TO OY1, PROVIDE INCREMENTAL FUNDING, REALLOCATING OY1 AND OY2 FUNDING AND MAKE ADMINISTRATIVE CHANGES. |
| September 27, 2024 | P00033 | OTHER ADMINISTRATIVE ACTION | +$20,444,311 | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM OY1 AND REOBLIGATE THEM TO OY2, DEOBLIGATE FUNDING FROM OY2 AND REOBLIGATE THEM TO OY2, INCREMENTALLY FUND OY2, REALLOCATE OY2 FUNDING, AND MAKE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| September 13, 2024 | P00032 | OTHER ADMINISTRATIVE ACTION | +$106,519,998 | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN BY CEILING FUNDS TO OY2 CEILING, DE-OBLIGATE OY1 FUNDS AND RE-OBLIGATE THEM TO OY2, RE-ALLOCATE OY2 FUNDING, PROVIDE INCREMENTAL FUNDING FOR OY1 AND OY2 CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES. |
| September 4, 2024 | P00031 | OTHER ADMINISTRATIVE ACTION | +$2,165,210 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR OY1 CLINS, REALLOCATE OY1 FUNDING AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| August 27, 2024 | P00030 | EXERCISE AN OPTION | +$36,298,159 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD 2, DE-OBLIGATE BASE YEAR FUNDS, PROVIDE INCREMENTAL FUNDING FOR OPTION YEARS 1 AND 2, REALLOCATE OPTION YEAR 1 FUNDING, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| August 1, 2024 | P00029 | FUNDING ONLY ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO REALLOCATE FUNDING OF OY1 CLINS, DEOBLIGATE BY UNEARNED AWARD FEE, REOBLIGATE FUDNING TO OY1 CLINS AND MAKE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| July 9, 2024 | P00028 | FUNDING ONLY ACTION | +$11,508,166 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR OPTION YEAR 1 CLINS AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| June 20, 2024 | P00027 | OTHER ADMINISTRATIVE ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES TO SECTION G AND J IN THE TASK ORDER. |
| June 12, 2024 | P00026 | FUNDING ONLY ACTION | +$1,413,198 | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING AND DO FUNDING REALIGNMENT FOR OY1. |
| May 21, 2024 | P00025 | FUNDING ONLY ACTION | +$7,133,458 | THE PURPOSE OF THIS MODIFICATION IS TO REOBLIGATE BY FUNDS, DEBLIGATE OY1 FUNDS, REOBLIGATE OY1 FUNDS, REALLOCATE OY1 FUNDS, PROVIDE INCREMENTAL FUNDING TO OY1 CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| May 8, 2024 | P00024 | OTHER ADMINISTRATIVE ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| April 8, 2024 | P00023 | FUNDING ONLY ACTION | +$17,828,577 | THE PURPOSE OF THIS MODIFICATION IS TO REALLOCATE OY1 FUNDS, PROVIDE INCREMENTAL FUNDING TO OY1 CLINS, DEOBLIGATE OY1 FUNDS, DEOBLIGATE BY UNEARNED AWARD FEE, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| March 4, 2024 | P00022 | OTHER ADMINISTRATIVE ACTION | +$4,830,215 | THE PURPOSE OF THIS MODIFICATION IS TO REALLOCATE OY1 FUNDS, PROVIDE INCREMENTAL FUNDING TO OY1 CLINS AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| February 15, 2024 | P00021 | OTHER ADMINISTRATIVE ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES TO SECTION G AND F IN THE TASK ORDER, AND UPDATE ATTACHMENT I, DD-254 TO REVISION 5. |
| January 24, 2024 | P00020 | OTHER ADMINISTRATIVE ACTION | +$1,061,724 | THE PURPOSE OF THIS MODIFICATION IS TO REALLOCATE OY1 FUNDING, PROVIDE INCREMENTAL FUNDING TO OY1 CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| December 21, 2023 | P00019 | OTHER ADMINISTRATIVE ACTION | +$24,898,942 | THE PURPOSE OF THIS MODIFICATION IS TO: REALIGN CEILING FROM BY TO OY1, REALLOCATE FUNDING BETWEEN OY CLINS, AND ADD INCREMENTAL FUNDING. |
| November 29, 2023 | P00018 | OTHER ADMINISTRATIVE ACTION | +$24,846,414 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| November 7, 2023 | P00017 | OTHER ADMINISTRATIVE ACTION | +$2,234,053 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| September 29, 2023 | P00016 | OTHER ADMINISTRATIVE ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO REALLOCATE FUNDING AND MAKE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| September 28, 2023 | P00015 | FUNDING ONLY ACTION | +$872,009 | THE PURPOSE OF THIS MODIFICATION TO ADD INCREMENTAL FUNDING, DEOBLIGATE FUNDING, REOBLIGATE FUNDING AND REALLOCATE FUNDING. |
| September 19, 2023 | P00014 | FUNDING ONLY ACTION | +$4,704,474 | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE BASE YEAR (BY) FUNDING AND REOBLIGATE THEM TO OPTION YEAR (OY1), OBLIGATE INCREMENTAL FUNDING, REALLOCATE OY1 FUNDING, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| September 13, 2023 | P00013 | EXERCISE AN OPTION | +$89,473,685 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD 1, OBLIGATE INCREMENTAL FUNDING, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| September 7, 2023 | P00012 | FUNDING ONLY ACTION | −$39,256,857 | THE PURPOSE OF THIS MODIFICATION IS TO REALLOCATE BY FUNDING, DEOBLIGATE FUNDING FROM BY CLINS, DEOBLIGATE BY NON-SEVERABLE FUNDING, INCREASE CLIN 0005 AND CLIN 4004 CEILING, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| August 7, 2023 | P00011 | FUNDING ONLY ACTION | +$2,067,633 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE INCREMENTAL FUNDING, REALIGN FUNDS FROM CLIN 0001 TO CLIN 0002 AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| July 28, 2023 | P00010 | FUNDING ONLY ACTION | +$6,180,041 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE INCREMENTAL FUNDING AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| June 14, 2023 | P00009 | FUNDING ONLY ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO REALLOCATE FUNDING AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| June 5, 2023 | P00008 | FUNDING ONLY ACTION | +$15,931,357 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE INCREMENTAL FUNDING AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| May 24, 2023 | P00007 | FUNDING ONLY ACTION | +$55,159,946 | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN CEILING FROM THE BY, OY3, AND OY4 TO CREATE NON-SEVERABLE CLINS FOR THE BY, INCREMENTALLY FUND THE BY SEVERABLE AND NON-SEVERABLE CLINS, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| May 2, 2023 | P00006 | FUNDING ONLY ACTION | +$96,618 | THE PURPOSE OF THIS MODIFICATION IS TO REALLOCATE FUNDING, PROVIDE INCREMENTAL FUNDING, UPDATE ATTACHMENT H, AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| April 14, 2023 | P00005 | OTHER ADMINISTRATIVE ACTION | −$1,723,409 | THE PURPOSE OF THIS MODIFICATION IS TO REALLOCATE AND DEOBLIGATE FUNDING, AND UPDATE SECTIONS E.5 AND F.5 TO THE TASK ORDER. |
| April 6, 2023 | P00004 | FUNDING ONLY ACTION | +$349,104 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| March 20, 2023 | P00003 | FUNDING ONLY ACTION | +$19,806,763 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING AND INCORPORATE ADMINISTRATIVE CHANGES TO THE TASK ORDER. |
| January 26, 2023 | P00002 | OTHER ADMINISTRATIVE ACTION | −$8,445,071 | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING BACK TO THE MISSION PARTNER. |
| November 22, 2022 | P00001 | OTHER ADMINISTRATIVE ACTION | no money | THIS MODIFICATION CORRECTS ADMINISTRATIVE DETAILS ON THE TASK ORDER AWARD. |
| September 14, 2022 | base | not on file | +$13,021,241 | THE PURPOSE OF THIS TO IS TO PROVIDE RESEARCH, DESIGN, DEVELOPMENT, INTEGRATION, T&E, INITIAL FIELDING AND OPERATION, LOGISTICS, MAINTENANCE, SUSTAINMENT, AND TRAINING FOR APPLICABLE C5ISR SYSTEMS. |
Last refreshed November 4, 2026 at 2:31 PM UTC.