LEIDOS, INC.
Federal contract award, Leidos, $905,503,231
Key CONT_AWD_693KA721C00014_6920_-NONE-_-NONE-. First seen by this system September 5, 2026 through the historical sweep, new to the record, public 4 days before this system saw it. One version on record.
Cite this row
b8a1dfc0920e01466b2eaf99983b58d7a0d8c7e75dfd63aca9d2276edba3a561The source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $905,503,231 | first version | June 15, 2021 | September 1, 2026 | 2026-09-05T00:54:19Z | historical sweep | b8a1dfc0920e |
Archived copy
https://web.archive.org/web/20260517213919/https://www.usaspending.gov/award/CONT_AWD_693KA721C00014_6920_-NONE-_-NONE- found, made by someone else, May 17, 2026
What the amount is made of
68 recorded actions, so the amount is the award's current total across all of them. 67 of them obligated money. Measured 2026-10-13, when USAspending reported a total obligation of $922,108,550.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| September 22, 2026 | P00067 | FUNDING ONLY ACTION | +$16,605,319 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING FOR LIFEFLIGHT OF MAINE AND VARIOUS TASK ORDER AWARDS AND REVISIONS AS NOTED IN THE LINE ITEM DESCRIPTIONS BELOW, IN ADDITION TO REALLOCATING FUNDING FOR ERAM/ERIDS SLE. |
| September 1, 2026 | P00066 | FUNDING ONLY ACTION | +$14,643,719 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING FOR ERAM/ERIDS SLE, ES3, OFFSHORE AUTOMATION, EA TRP 2025, ADS-B, AND VARIOUS TASK ORDER AWARDS AND REVISIONS AS NOTED IN THE LINE ITEM DESCRIPTIONS BELOW, IN ADDITION TO DEOBLIGATING |
| June 24, 2026 | P00065 | FUNDING ONLY ACTION | +$42,279,155 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING FOR ERAM/ERIDS SLE, EA TRP 2025, MODE C INTRUDER, OFFSHORE, TDM-TO-IP, ES3, ADS-B, AND VARIOUS TASK ORDER AWARDS AND REVISIONS AS NOTED IN THE LINE ITEM DESCRIPTIONS BELOW, IN ADDITIO |
| April 17, 2026 | P00064 | FUNDING ONLY ACTION | +$12,373,524 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING FOR OFFSHORE, MODE C INTRUDER, ERAM/ERIDS SLE, ADS-B, INCENTIVE FEES, AND VARIOUS TASK ORDER AWARDS AND REVISIONS, AS WELL AS CORRECTING A TDM-TO-IP FUNDING LINE, AS NOTED IN THE LINE |
| March 13, 2026 | P00063 | FUNDING ONLY ACTION | +$32,191,131 | FUNDING ACTION TO SUPPORT ERAM/ERIDS SLE, OFFSHORE, TDM-TO-IP, AND VARIOUS TASK ORDER AWARDS AND REVISIONS AS NOTED IN THE LINE ITEM DESCRIPTIONS BELOW. |
| February 6, 2026 | P00062 | FUNDING ONLY ACTION | +$14,081,361 | FUNDING ACTION TO SUPPORT ERAM/ERIDS, EA TRP, OFFSHORE, EA TRP AND MODE C INTRUDER PROPOSAL PREPARATION, ES3, AND VARIOUS TASK ORDER AWARDS AND REVISIONS AS NOTED IN THE LINE ITEM DESCRIPTIONS BELOW. |
| November 25, 2025 | P00061 | FUNDING ONLY ACTION | +$30,055,267 | FUNDING ACTION TO SUPPORT ERAM/ERIDS, EAF600 SOFTWARE DEVELOPMENT, ERAM OA PROPOSAL PREPARATION, ES3, AND VARIOUS TASK ORDER AWARDS AND REVISIONS AS NOTED IN THE LINE ITEM DESCRIPTIONS BELOW. |
| September 17, 2025 | P00060 | FUNDING ONLY ACTION | +$23,931,705 | FUNDING ACTION TO SUPPORT ERAM OS UPGRADE, ERAM OFFSHORE AUTOMATION, AND VARIOUS ERAM TASK ORDERS AS NOTED IN THE LINE ITEM DESCRIPTIONS BELOW. |
| August 27, 2025 | P00059 | FUNDING ONLY ACTION | +$22,946,739 | FUNDING ACTION TO SUPPORT ERAM TRP, ERAM/ERIDS SECOND LEVEL ENGINEERING, AND ERAM OFFSHORE AUTOMATION AS NOTED IN THE LINE ITEM DESCRIPTIONS BELOW. |
| August 6, 2025 | P00058 | FUNDING ONLY ACTION | +$1,581,335 | THIS MODIFICATION INCORPORATES MULTIPLE TASK ORDERS AND ASSOCIATED SCOPE AS NOTED IN THE LINE ITEM DESCRIPTIONS BELOW. |
| July 8, 2025 | P00057 | FUNDING ONLY ACTION | +$9,272,086 | FUNDING ACTION TO SUPPORT ERAMA TRP, ERAM/ERIDS SECOND LEVEL ENGINEERING, AND ERAM OFFSHORE AUTOMATION AS NOTED IN THE LINE ITEMS DESCRIPTIONS BELOW. |
| May 27, 2025 | P00056 | FUNDING ONLY ACTION | +$12,712,473 | FUNDING ACTION TO SUPPORT ERAMA TRP, ERAM SUSTAINMENT SEG 2, ERAM ENHANCEMENT 2 (EE2) AND CAS MAINTENANCE, AS NOTED IN THE LINE ITEMS DESCRIPTIONS BELOW. |
| May 7, 2025 | P00055 | FUNDING ONLY ACTION | +$1,625,000 | THIS MODIFICATION PROVIDES FUNDING TO SUPPORT MULTIPLE ERAM TASK ORDERS AND ERAM ENHANCEMENT 2 (EE2) PROGRAM EFFORTS, AS NOTED IN THE LINE ITEMS DESCRIPTIONS BELOW. |
| April 28, 2025 | P00054 | FUNDING ONLY ACTION | +$3,070,589 | THIS MODIFICATION PROVIDES FUNDING TO SUPPORT MULTIPLE ERAM TASK ORDERS AND ERAM ENHANCEMENT 2 (EE2) PROGRAM EFFORTS, AS NOTED IN THE LINE ITEMS DESCRIPTIONS BELOW. |
| April 3, 2025 | P00053 | FUNDING ONLY ACTION | +$9,698,335 | ERAM OPERATING SYSTEM UPGRADE (OSU) - EAG200 AND EAG400 SOFTWARE DEVELOPMENT EFFORTS. |
| March 28, 2025 | P00052 | FUNDING ONLY ACTION | +$22,909,360 | THIS MODIFICATION INCORPORATES ENROUTE AUTOMATION MODERNIZATION (ERAM) TASK ORDER 14 - REVISIONS 9-11, TASK ORDER 16 REVISION 2,TASK ORDER 17 - REVISION 3, TASK ORDER 22 - REVISION 1, TASK ORDER 24 - BASE AWARD, AND TASK ORDER 26 BASE AWARD AND OBLIG |
| March 18, 2025 | P00051 | CHANGE ORDER | +$2,675,000 | FUNDING FOR ENROUTE AUTOMATION MODERNIZATION (ERAM) ENGINEERING SERVICES SEGMENT 2 CLINS: 03.21.03 ES3 SEGMENT 2 DEVELOPMENT, 03.21.06 ES3 SEG2 TRAINING, 03.22.04 ES3 SEG 2 SOFTWARE PROGRAM REPORT (PR FIXES), 03.23.18 ES3 SEG 2 CROSS PROGRAM SHARE |
| March 12, 2025 | P00050 | CHANGE ORDER | +$15,058,015 | THIS MODIFICATION PROVIDES ADDITIONAL FUNDING AND INCREASES THE NTE FOR ERAM/ERIDS OPS SLE CALENDAR YEAR 2025 AS NOTED IN THE LINE ITEM DESCRIPTIONS BELOW AND ATTACHED MODIFICATION DETAILS. |
| January 23, 2025 | P00049 | CHANGE ORDER | +$1,578,656 | MODIFICATION 49 PROVIDES AUTHORIZATION AND FUNDING IN SUPPORT OF THE TIME DIVISION MULTIPLEXING (TDM) TO INTERNET PROTOCOL (TDM-IP) PROGRAM. THE CONTRACTOR WILL PERFORM WORK UNDER THE EN ROUTE AUTOMATION MODERNIZATION (ERAM) CONTRACT AS PROPOSED IN P |
| January 22, 2025 | P00048 | CHANGE ORDER | +$1,102,383 | MOD 48 PROVIDES INCREMENTAL FUNDING CHANGES FOR VARIOUS ERAM CLINS AND INCORPORATES RECENTLY AWARDED TASK ORDER ACTIONS AS NOTED IN THE LINE ITEMS BELOW AND THE RELATED MODIFICATION DETAILS DOCUMENT. |
| January 22, 2025 | P00047 | CHANGE ORDER | +$8,850,000 | MODIFICATION 47 PROVIDES AUTHORIZATION AND FUNDING TO ALLOW THE CONTRACTOR TO CONTINUE PROVIDING DAILY OPERATIONAL SUSTAINMENT AND MAINTENANCE SUPPORT UNDER THIS CONTRACT. THE CONTRACTOR WILL CONTINUE TO SUPPORT THE ERAM SYSTEM UNDER THE CY 2025 SECO |
| December 29, 2024 | P00046 | CHANGE ORDER | +$1,589,109 | MOD 46 PROVIDES ADDITIONAL FUNDING FOR MULTIPLE EXISTING ERAM ENGINEERING SERVICES (ES3) CLINS IN SUPPORT OF COMPLETION OF THE ERAM ES3 SEGMENT 2 EFFORT AS NOTED IN THE LINE ITEMS BELOW AND THE ATTACHED MODIFICATION DETAILS DOCUMENT. |
| December 17, 2024 | P00045 | CHANGE ORDER | +$8,409,301 | MOD 45 PROVIDES INCREMENTAL FUNDING FOR VARIOUS ERAM CLINS AND INCORPORATES TASK ORDER ACTIONS THAT HAVE BEEN AWARDED SINCE THE LAST CONTRACT MODIFICATION. |
| December 3, 2024 | P00044 | CHANGE ORDER | +$9,105,000 | MODIFICATION NO. 44 IS EXECUTED AS A BILATERAL AGREEMENT TO INCREASE THE NOT-TO-EXCEED (NTE) CLIN CEILINGS WITH SUPPORTING INCREMENTAL FUNDING FOR ENROUTE AUTOMATION MODERNIZATION (ERAM)/ENROUTE INFORMATION DISPLAY SYSTEM (ERIDS)/SECOND LEVEL ENGINEE |
| September 23, 2024 | P00043 | CHANGE ORDER | +$6,201,570 | MOD 42 IS ISSUED AS A BILATERAL MODIFICATION TO PROVIDE INCREMENTAL FUNDING FOR VARIOUS ERAM CLINS AND INCORPORATE TASK ORDER ACTIONS THAT HAVE BEEN AWARDED WITHIN THE LAST 30 DAYS. |
| September 10, 2024 | P00042 | CHANGE ORDER | +$7,442,469 | MOD 42 IS ISSUED AS A BILATERAL MODIFICATION TO PROVIDE INCREMENTAL FUNDING FOR VARIOUS ERAM CLINS AND INCORPORATE TASK ORDER ACTIONS THAT HAVE BEEN AWARDED WITHIN THE LAST 30 DAYS. |
| September 9, 2024 | P00041 | CHANGE ORDER | +$7,325,478 | MODIFICATION NO. 39 IS EXECUTED AS A BILATERAL AGREEMENT TO INCREASE NOT-TO-EXCEED (NTE) CLIN CEILINGS WITH SUPPORTING INCREMENTAL FUNDING FOR ENROUTE AUTOMATION MODERNIZATION (ERAM)/ENROUTE INFORMATION DISPLAY SYSTEM (ERIDS)/SECOND LEVEL ENGINEERING |
| September 6, 2024 | P00040 | CHANGE ORDER | +$5,227,722 | MOD 40 IS ISSUED AS A BILATERAL MODIFICATION TO INCREASE THE NTE WITH SUPPORTING FUNDING FOR OFFSHORE AUTOMATION UNDER CLIN CLIN 06.24.600.02 IN SUPPORT OF ERAM SIG 2053 DEVELOPMENT AS DESCRIBED IN THE ATTACHED MODIFICATION DETAILS DOCUMENT. |
| August 16, 2024 | P00039 | CHANGE ORDER | +$20,427,428 | MODIFICATION NO. 39 IS EXECUTED AS A BILATERAL AGREEMENT TO INCREASE NOT-TO-EXCEED (NTE) CLIN CEILINGS WITH SUPPORTING INCREMENTAL FUNDING FOR ENROUTE AUTOMATION MODERNIZATION (ERAM)/ENROUTE INFORMATION DISPLAY SYSTEM (ERIDS)/SECOND LEVEL ENGINEERING |
| August 9, 2024 | P00038 | CHANGE ORDER | +$5,270,639 | MODIFICATION NO. 38 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: INCORPORATE TO #14 REV 7 AND REV 8, TO #21, AND TO PROVIDE INCREMENTAL FUNDING FOR MULTIPLE ERAM ENGINEERING SERVICES (ES3) CLINS AS NOTED BELOW AND IN |
| July 25, 2024 | P00037 | CHANGE ORDER | +$940,330 | MODIFICATION NO. 37 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO INCORPORATE TASK ORDER NO. 3 REV #5, TASK ORDER NO. 4 REV #5, TASK ORDER NO. 5 REV #6, TASK ORDER NO. 12 REV #4, AND TASK ORDER NO. 15 REV #1; |
| June 13, 2024 | P00036 | CHANGE ORDER | +$10,545,704 | MODIFICATION NO. 36 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO AUTHORIZE CLIN CEILING INCREASE AND PROVIDE FUNDING FOR OFFSHORE CLIN 06.22.07 (OFFSHORE CHANGES PROPOSAL #254); 2. TO AUTHORIZE PERFORMANCE, E |
| May 30, 2024 | P00035 | CHANGE ORDER | +$16,197,849 | MODIFICATION NO. 35 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO ADD INCREMENTAL FUNDING TO ERAM SUSTAINMENT 3 (ES3) CLINS 03.21.03, 03.22.04, 03.22.500, AND 03.22.500.01; 2. TO INCORPORATE TASK ORDER NO. 17; |
| May 24, 2024 | P00034 | CHANGE ORDER | +$21,619,400 | MODIFICATION NO. 34 IS EXECUTED AS A BILATERAL AGREEMENT TO INCREASE THE NOT-TO-EXCEED (NTE) CLIN CEILINGS WITH SUPPORTING INCREMENTAL FUNDING FOR ENROUTE AUTOMATION MODERNIZATION (ERAM)/ENROUTE INFORMATION DISPLAY SYSTEM (ERIDS)/SECOND LEVEL ENGINEE |
| May 1, 2024 | P00033 | CHANGE ORDER | +$26,585,101 | MODIFICATION NO. 33 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. ADD INCREMENTAL FUNDING TO SLE CLINS 01.24.01, 01.24.04, 01.24.08.01, 01.24.08.02, 01.24.09.01, 01.24.09.02, AND 01.24.11 2. AWARD ERAM ENHANCE |
| April 18, 2024 | P00032 | CHANGE ORDER | +$746,820 | MODIFICATION NO. 32 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO ESTABLISH CLIN CEILINGS AND NOT-TO-EXCEED FUNDING FOR TIME DIVISION MULTIPLEXING (TDM)-TO-INTERNET PROTOCOL (IP) CLINS 10.24.04 AND 10.24.05 AS R |
| March 26, 2024 | P00031 | CHANGE ORDER | +$1,686,204 | MODIFICATION NO. 31 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO AWARD ES3 CAS MAINTENANCE (PROPOSAL #228); 2. TO REVISE PERIODS OF PERFORMANCE FOR CLINS 03.21.01 AND 03.21.07; 3. TO ESTABLISH 3 NEW ES3 CLI |
| March 21, 2024 | P00030 | CHANGE ORDER | +$5,650,000 | MODIFICATION NO. 30 IS EXECUTED AS A BILATERAL AGREEMENT TO EXTEND THE PERIODS OF PERFORMANCE (POPS) AND TO INCREASE NOT-TO-EXCEED (NTE) CLIN CEILINGS WITH SUPPORTING INCREMENTAL FUNDING FOR ENROUTE AUTOMATION MODERNIZATION (ERAM)/ENROUTE INFORMATION |
| February 22, 2024 | P00029 | CHANGE ORDER | +$23,619,118 | SUMMARY OF CHANGES: MODIFICATION NO. 29 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO REALLOCATE FUNDING FROM CY 23 CLINS 01.23.01, 01.23.04, 01.23.05, 01.23.07, AND 01.23.08.01 TO CY23 CLINS 01.23.08.02 AND 0 |
| February 21, 2024 | P00028 | CHANGE ORDER | +$11,182,371 | SUMMARY OF CHANGES: MODIFICATION NO. 28 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO AWARD AUTOMATIC DEPENDENT SURVEILLANCE-BROADCAST (ADS-B) SELECTED ALTITUDE (PROPOSAL #214) 2. TO ADD FUNDING TO CLIN 07.23 |
| February 14, 2024 | P00027 | CHANGE ORDER | no money | SUMMARY OF CHANGES: MODIFICATION NO. 27 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO INCORPORATE A DECREASE TO CY23 OPS CLIN VALUES DUE TO CY23 BUDGET SHORTFALL IMPACTS (PROPOSAL #238); 2. TO AWARD CLIN 01.2 |
| January 17, 2024 | P00026 | CHANGE ORDER | +$3,906,666 | SUMMARY OF CHANGES: MODIFICATION NO. 26 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO ADD INCREMENTAL FUNDING TO CY 23 SLE CLINS 01.23.01, 01.23.04, 01.23.08.01, 01.23.09.01, 01.23.09.02, AND 01.23.11; 2. TO |
| December 25, 2023 | P00025 | CHANGE ORDER | +$10,691,000 | SUMMARY OF CHANGES: MODIFICATION NO. 25 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO ESTABLISH CLIN CEILINGS AND NOT-TO-EXCEED FUNDING FOR CY24 SLE CLINS 01.24.01, 01.24.04, 01.24.05, 01.24.07, 01.24.08.01, 0 |
| November 29, 2023 | P00024 | CHANGE ORDER | +$13,789,333 | SUMMARY OF CHANGES: MODIFICATION NO. 24 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO ADD INCREMENTAL FUNDING TO SLE CLINS 01.23.01, 01.23.04, 01.23.05, 01.23.08.01, 01.23.09.01, AND 01.23.09.02; 2. TO INCORP |
| September 22, 2023 | P00023 | CHANGE ORDER | +$870,766 | SUMMARY OF CHANGES: MODIFICATION NO. 23 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO INCORPORATE CONTRACT VALUE FOR TWO AUTHORIZED CLIN 03.22.08 NOT-TO-EXCEED EFFORTS UNDER ES3 SITE DEPLOYMENT AND LAB ENHANCE |
| September 21, 2023 | P00022 | CHANGE ORDER | +$10,170,824 | SUMMARY OF CHANGES: MODIFICATION NO. 22 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO REALLOCATE FUNDING FROM FY 22 SLE CLINS 01.22.01, 01.22.04, 01.22.05, 01.22.07, 01.22.08.01, 01.22.08.02, 01.22.09.01, 01. |
| August 7, 2023 | P00021 | CHANGE ORDER | +$12,002,837 | SUMMARY OF CHANGES: MODIFICATION NO. 21 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO DEOBLIGATE FUNDING FROM CLIN 01.21.15.005 (TASK ORDER NO. 5); 2. TO ADD FUNDING TO CLINS 01.23.01, 01.23.05, 01.23.08.01, |
| June 28, 2023 | P00020 | CHANGE ORDER | +$21,355,161 | SUMMARY OF CHANGES: MODIFICATION NO. 20 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO ADD INCREMENTAL FUNDING TO CLINS 01.23.01, 01.23.04, 01.23.05, 01.23.08.01, 01.23.09.01, 01.23.11, 06.22.01, 0 |
| June 12, 2023 | P00019 | CHANGE ORDER | +$800,000 | SUMMARY OF CHANGES: MODIFICATION NO. 19 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO AUTHORIZE NOT-TO-EXCEED CONTRACT VALUE AND FUNDING FOR EE2 EAF600 UNDER CLIN 02.23.600; AND 2. TO UPDATE SECTIONS B.3, B. |
| May 10, 2023 | P00018 | CHANGE ORDER | +$29,158,791 | SUMMARY OF CHANGES: MODIFICATION NO. 18 IS EXECUTED AS A BILATERAL AGREEMENT TO INCORPORATE THE FOLLOWING CHANGES: 1. TO ADD FUNDING TO CLINS 01.23.01, 01.23.04, 01.23.05, 01.23.07, 01.23.08.01, 01.23.08.02, 01.23.09.01, 01.23.09.02, 01.23.11, 0 |
| May 1, 2023 | P00017 | CHANGE ORDER | +$8,100,000 | CONTRACT 693KA7-21-C-00014 IS MODIFIED: 1. TO AUTHORIZE NOT-TO-EXCEED FUNDING OF $200,000.00 UNDER NEW CLIN 07.23.300; AND 2. TO UPDATE SECTIONS B.3, B.4, F.4, G.9, AND H.57. |
| April 3, 2023 | P00016 | CHANGE ORDER | +$35,114,268 | CONTRACT 693KA7-21-C-00014 IS MODIFIED: 1. TO AUTHORIZE PROPOSAL PREPARATION COSTS FOR OPS EXTENSION (PROPOSAL #232) UNDER CLIN 01.23.17; 2. TO ADD FUNDING TO CLIN 01.21.15.004 (TASK ORDER #4); 3, TO ESTABLISH NTE CONTRACT VALUE AND FUNDING F |
| January 26, 2023 | P00015 | FUNDING ONLY ACTION | +$15,900,000 | CONTRACT 693KA7-21-C-00014 IS MODIFIED: 1. TO ADD FUNDING TO CLINS 01.23.01, 01.23.04, 01.23.08.01, 01.23.08.02, 01.23.09.01, 01.23.09.02, AND 01.23.11; 2. TO ADD FUNDING TO CLINS 03.22.06, 03.21.10, AND 03.21.300; 3. TO REALIGN FUNDS BETWEEN |
| January 13, 2023 | P00014 | CHANGE ORDER | +$4,415,138 | CONTRACT 693KA7-21-C-00014 IS MODIFIED: 1. TO ADD FUNDING TO CLINS 01.22.01, TO INCREASE CLIN VALUE, AND TO REALLOCATE FUNDS FROM CLIN 01.22.05 TO CLIN 01.22.01; 2. TO ADD FUNDING TO CLIN 01.21.15.004 (TASK ORDER NO. 4); 3. TO DEFINITIZE ERID |
| December 5, 2022 | P00013 | CHANGE ORDER | +$64,694,194 | CONTRACT 693KA7-21-C-00014 IS MODIFIED: 1. TO DEFINITIZE ERAM OFFSHORE AUTOMATION (#192) WITH FUNDING, 2. TO DEFINITIZE REVISED ERAM OFFSHORE AUTOMATION (#221) WITH FUNDING, 3. TO ADD FUNDING TO CLINS 01.22.01, 01.22.08.01, 08.22.08.02, 01. |
| September 21, 2022 | P00012 | CHANGE ORDER | +$1,800,000 | CONTRACT 693KA7-21-C-00014 IS MODIFIED TO DEFINITIZE ERAM CY22/CY23 SOFTWARE RELEASE DEVELOPMENT AND IN-SERVICE SYSTEM SUPPORT (#194); TO DEFINITIZE ERIDS LOAD BALANCER SPARES (#205), TO DEFINITIZE CLIN 01.22.07 CY22 CAS AND HARDWARE SUPPORT PURCHASE |
| September 14, 2022 | P00011 | CHANGE ORDER | +$4,402,846 | CONTRACT 693KA7-21-C-00014 IS MODIFIED TO ESTABLISH NOT-TO-EXCEED AUTHORIZATIONS FOR NEW OFFSHORE CLINS 06.22.01, 06.22.03, 06.22.500.01, AND 06.22.600.01; TO ESTABLISH FUNDING BUT NO AUTHORIZATIONS AT THIS TIME FOR OFFSHORE CLINS 06.22.400.01 AND 06 |
| August 22, 2022 | P00010 | CHANGE ORDER | +$7,554,986 | CONTRACT 693KA7-21-C-00014 IS MODIFIED TO DEFINITIZE TASK ORDER NO. 4 (#201), ES3 COMPLETION, ADDED PROCUREMENT OF M&C WORKSTATION MONITORS (#210), AND ES3 ENGINEERING SERVICES (#219); TO INCREASE THE AUTHORIZATION AND FUNDING FOR NTE CLIN 01.22. |
| July 11, 2022 | P00009 | CHANGE ORDER | +$20,890,934 | CONTRACT 693KA7-21-C-00014 IS MODIFIED TO INCREASE THE AUTHORIZATIONS AND TO ADD FUNDING TO NTE CLINS 01.22.01, 01.22.08.01, 01.22.08.02, 01.22.09.01, AND 01.22.09.02; TO ADD FUNDING TO CLINS 03.21.01 AND 03.21.10; AND TO UPDATE SECTION B AND PARAGRA |
| June 17, 2022 | P00008 | CHANGE ORDER | +$10,693,273 | CONTRACT 693KA7-21-C-00014 IS MODIFIED TO INCREASE THE AUTHORIZATION AND ADD FUNDING TO NTE CLINS 01.22.04, 01.22.07, AND 01.22.11; TO DEOBLIGATE FUNDS FROM CLIN 02.21.14.003; TO ADD FUNDING TO CLINS 03.22.04 AND 03.21.06; AND TO UPDATE SECTION B AND |
| June 1, 2022 | P00007 | CHANGE ORDER | +$18,001,469 | CONTRACT 693KA7-21-C-00014 IS MODIFIED TO INCREASE THE AUTHORIZATION AND FUNDING FOR TASK ORDER NO. 3 (CLINS 02.21.14.003 AND 02.21.16.003); TO AUTHORIZE AND FUND TASK ORDER NO. 8 (CLINS 05.22.14.008 AND 05.22.16.008); TO ADD FUNDING TO CLINS 03.21.0 |
| May 11, 2022 | P00006 | FUNDING ONLY ACTION | +$4,106,279 | CONTRACT 693KA7-21-C-00014 IS MODIFIED TO ADD FUNDING TO CLINS 01.21.15.005, 03.21.05, AND 03.22.500; AND TO UPDATE PARAGRAPH G.9. |
| April 20, 2022 | P00005 | CHANGE ORDER | +$16,844,322 | CONTRACT 693KA7-21-C-00014 IS MODIFIED TO ADD FUNDING TO CLINS 01.22.04, 01.22.05, 01.22.08.01, 01.22.08.02, 01.22.09.01, 01.22.09.02, 01.21.15.005 (TASK ORDER NO. 5), 03.21.03, 03.21.05, AND 03.21.07; TO ADD CONTRACT VALUE AND FUNDING TO NTE CLINS |
| February 9, 2022 | P00004 | CHANGE ORDER | +$43,148,995 | CONTRACT 693KA7-21-C-00014 IS MODIFIED TO ADD NOT-TO-EXCEED CONTRACT VALUE AND FUNDING FOR CLINS 01.22.01, 01.22.04, 01.22.07, 01.22.08.01, 01.22.08.02, 01.22.09.01, 01.22.09.02, AND 01.22.11; TO ADD FUNDING AND CONTRACT VALUE FOR CLIN 02.21.14.003 A |
| December 15, 2021 | P00003 | CHANGE ORDER | +$19,038,075 | CONTRACT 693KA7-21-C-00014 IS MODIFIED TO ADD NOT-TO-EXCEED CONTRACT VALUE AND FUNDING FOR CLINS 01.22.01, 01.22.04, 01.22.05, 01.22.07, 01.22.08.01, 01.22.08.02, 01.22.09.01, 01.22.09.02, AND 01.22.11; TO ADD FUNDING AND CONTRACT VALUE FOR CLIN 01.2 |
| December 3, 2021 | P00002 | CHANGE ORDER | +$4,669,000 | CONTRACT 693KA7-21-C-00014 IS MODIFIED TO ADD FUNDING AND CONTRACT VALUE FOR CLINS 05.21.14.006 AND 05.21.16.0006 (TASK ORDER NO. 6); TO ADD FUNDING FOR CLINS 03.21.01, 03.21.03, 03.21.06, 03.21.10, 03.21.300, AND 03.22.500; AND TO UPDATE G.9. |
| September 2, 2021 | P00001 | CHANGE ORDER | +$44,192,259 | CONTRACT 693KA7-21-C-00014 IS MODIFIED TO DEFINITIZE ERAM SUSTAINMENT 3 (ES3) COMPLETION (#188); ADD FUNDING FOR CLINS 01.21.14.001, 01.21.14.002, 01.21.14.004, 01.21.14.005, 01.21.15.002, 01.21.16.001, 01.21.16.004, 02.21.400, 02.21.14.003, 02.21.16 |
| June 15, 2021 | base | not on file | +$6,784,369 | THE PURPOSE OF THIS CONTRACT IS TO ENHANCE AND MAINTAIN THE EN ROUTE AUTOMATION AND MODERNIZATION (ERAM), INCLUDING THE EN ROUTE INFORMATION DISPLAY SYSTEM (ERIDS), AND TO PRODUCE, IMPLEMENT, AND PROVIDE SUPPORT FOR A LIMITED NUMBER OF ERAM/ERIDS SYS |