LEIDOS, INC.
Federal contract award, Leidos, $773,373,077
Key CONT_AWD_HC102820F0032_9700_HC102820D0001_9700. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 127 days before this system saw it. One version on record.
Cite this row
1fa8ad9eaa925beaf40465277ff987fd5fbf0cd8750bee2f377cd82f024a1390The source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $773,373,077 | first version | December 17, 2019 | May 1, 2026 | 2026-09-05T00:54:19Z | historical sweep | 1fa8ad9eaa92 |
Archived copy
https://web.archive.org/web/20260517214730/https://www.usaspending.gov/award/CONT_AWD_HC102820F0032_9700_HC102820D0001_9700 found, made by someone else, May 17, 2026
What the amount is made of
149 recorded actions, so the amount is the award's current total across all of them. 133 of them obligated money. Measured 2026-10-13, when USAspending reported a total obligation of $769,992,207.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| June 25, 2026 | P00148 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSMO OPERATIONS AND SUSTAINMENT |
| June 23, 2026 | P00147 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$3,380,869 | GSM-O II OPERATIONS AND SUSTAINMENT |
| May 1, 2026 | P00146 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$84,308 | GSM-O OPERATIONS AND SUSTAINMENT |
| April 2, 2026 | P00145 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$2,597,869 | GSM-O OPERATIONS AND SUSTAINMENT |
| January 30, 2026 | P00144 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$78,961 | GSM-O OPERATIONS AND SUSTAINMENT |
| November 5, 2025 | P00143 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O OPERATIONS AND SUSTAINMENT |
| October 30, 2025 | P00142 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O OPERATIONS AND SUSTAINMENT |
| October 24, 2025 | P00141 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O OPERATIONS AND SUSTAINMENT |
| September 30, 2025 | P00140 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$447,157 | GSM-O OPERATIONS AND SUSTAINMENT |
| September 29, 2025 | P00139 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O OPERATIONS AND SUSTAINMENT |
| September 23, 2025 | P00138 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$83,275 | GSM-O OPERATIONS AND SUSTAINMENT |
| September 22, 2025 | P00137 | OTHER ADMINISTRATIVE ACTION | +$104,884 | GSM-O OPERATIONS AND SUSTAINMENT |
| September 19, 2025 | P00136 | CHANGE ORDER | no money | OPERATIONS AND SUSTAINMENT SUPPORT |
| September 12, 2025 | P00135 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$678,520 | OPERATIONS AND SUSTAINMENT SUPPORT |
| September 10, 2025 | P00134 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$776,081 | OPERATIONS AND SUSTAINMENT SUPPORT |
| August 27, 2025 | P00133 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$48,688 | OPERATIONS AND SUSTAINMENT SUPPORT |
| August 21, 2025 | P00132 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$424,380 | OPERATIONS AND SUSTAINMENT SUPPORT |
| August 12, 2025 | P00131 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$624,214 | OPERATIONS AND SUSTAINMENT SUPPORT |
| July 31, 2025 | P00130 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$6,183,812 | OPERATIONS AND SUSTAINMENT SUPPORT |
| July 25, 2025 | P00129 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$840,865 | OPERATIONS AND SUSTAINMENT SUPPORT |
| July 17, 2025 | P00128 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,029,521 | OPERATIONS AND SUSTAINMENT SUPPORT |
| June 26, 2025 | P00127 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$5,473,401 | OPERATIONS AND SUSTAINMENT SUPPORT |
| June 13, 2025 | P00126 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$5,643,291 | OPERATIONS AND SUSTAINMENT SUPPORT |
| June 4, 2025 | P00125 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$7,400,345 | OPERATIONS AND SUSTAINMENT SUPPORT |
| May 19, 2025 | P00124 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$923,194 | OPERATIONS AND SUSTAINMENT SUPPORT |
| May 12, 2025 | P00123 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$837,345 | OPERATIONS AND SUSTAINMENT SUPPORT |
| April 28, 2025 | P00122 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$5,812,112 | OPERATIONS AND SUSTAINMENT SUPPORT |
| April 24, 2025 | P00121 | OTHER ADMINISTRATIVE ACTION | −$10,021,493 | OPERATIONS AND SUSTAINMENT SUPPORT |
| April 15, 2025 | P00120 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,218,616 | GMS-O II OPERATIONS |
| March 14, 2025 | P00119 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$226,819 | GMS-O II OPERATIONS |
| March 12, 2025 | P00118 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,386,101 | GMS-O II OPERATIONS |
| February 21, 2025 | P00117 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$35,096,433 | GMS-O II OPERATIONS |
| February 7, 2025 | P00116 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,730,727 | GMS-O II OPERATIONS |
| February 4, 2025 | P00115 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$447,254 | GMS-O II OPERATIONS |
| January 27, 2025 | P00114 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$14,039,372 | GMS-O II OPERATIONS |
| January 3, 2025 | P00113 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,222,483 | GMS-O II OPERATIONS |
| December 20, 2024 | P00112 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,662,643 | GSM-O II OPERATIONS |
| December 12, 2024 | P00111 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$422,330 | GSM-O II MAINTENANCE |
| December 2, 2024 | P00110 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,445,857 | GSM-O II OPERATIONS |
| November 22, 2024 | P00109 | FUNDING ONLY ACTION | +$9,656,643 | GSM-O II OPERATIONS |
| November 19, 2024 | P00108 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$9,421,719 | GSM-O II OPERATIONS |
| November 14, 2024 | P00107 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$6,227,698 | GSM-O II OPERATIONS |
| October 30, 2024 | P00106 | EXERCISE AN OPTION | +$64,521,597 | GSM-O II OPERATIONS |
| October 4, 2024 | P00105 | OTHER ADMINISTRATIVE ACTION | −$8,453,287 | GSM-O II OPERATIONS |
| September 25, 2024 | P00104 | FUNDING ONLY ACTION | +$2,285,493 | GSM-O II MAINTENANCE |
| September 20, 2024 | P00103 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,894,919 | GSM-O II MAINTENANCE |
| September 18, 2024 | P00102 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,983,478 | GSM-O II OPERATIONS |
| September 6, 2024 | P00101 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$11,890,496 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN INFRASTRUCTURE |
| August 30, 2024 | P00100 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,474,798 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN INFRASTRUCTURE |
| August 15, 2024 | P00099 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,384,393 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| July 16, 2024 | P00098 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,280,183 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| June 21, 2024 | P00097 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$2,573,756 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| June 17, 2024 | P00096 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$21,247,345 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| June 3, 2024 | P00095 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,572,835 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| May 10, 2024 | P00094 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$5,978,832 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| April 25, 2024 | P00093 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| April 18, 2024 | P00092 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,456,581 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| April 10, 2024 | P00091 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,799,160 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| April 9, 2024 | P00090 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$4,532,552 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| March 20, 2024 | P00089 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,062,187 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| March 7, 2024 | P00088 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$12,518,173 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| February 21, 2024 | P00087 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$9,540,882 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| January 29, 2024 | P00086 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,321,795 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| January 25, 2024 | P00085 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$9,784,447 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| December 14, 2023 | P00084 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$9,126,460 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| December 4, 2023 | P00083 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,352,651 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| November 21, 2023 | P00082 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$8,196,328 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| November 20, 2023 | P00081 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| November 17, 2023 | P00080 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,288,076 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| November 9, 2023 | P00079 | EXERCISE AN OPTION | +$59,225,454 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| September 29, 2023 | P00078 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$554,524 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| September 28, 2023 | P00077 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$6,607,584 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| September 27, 2023 | P00076 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,961,525 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| September 22, 2023 | P00075 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$123,414 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| September 21, 2023 | P00074 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$830,175 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| September 20, 2023 | P00073 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$4,211,537 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| September 18, 2023 | P00072 | FUNDING ONLY ACTION | +$2,284,918 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| September 15, 2023 | P00071 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$1,915,977 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| September 12, 2023 | P00070 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| September 8, 2023 | P00069 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$306,416 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| August 31, 2023 | P00068 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,302,225 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| August 23, 2023 | P00067 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$1,210,632 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| July 27, 2023 | P00066 | FUNDING ONLY ACTION | −$9,883 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| July 27, 2023 | P00065 | FUNDING ONLY ACTION | +$4,202,941 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| July 21, 2023 | P00064 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,968,510 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| July 12, 2023 | P00063 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$740,158 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| July 10, 2023 | P00062 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$7,453,911 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| June 22, 2023 | P00061 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,930,361 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| June 21, 2023 | P00060 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$5,513,560 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| June 5, 2023 | P00059 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| May 19, 2023 | P00058 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$381,886 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| May 11, 2023 | P00057 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$12,037,687 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| April 19, 2023 | P00056 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,402,509 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| March 24, 2023 | P00055 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,444,057 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| February 27, 2023 | P00054 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$27,515,768 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| February 2, 2023 | P00053 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,055,232 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| January 11, 2023 | P00052 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,891,673 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| December 16, 2022 | P00051 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,120,633 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| November 30, 2022 | P00050 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$308,991 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| November 23, 2022 | P00049 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,636,269 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| November 18, 2022 | P00048 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$5,303,523 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| November 16, 2022 | P00047 | EXERCISE AN OPTION | +$64,235,225 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| November 10, 2022 | P00046 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$652,144 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| September 28, 2022 | P00045 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$255,756 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| September 23, 2022 | P00044 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,528,911 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| August 23, 2022 | P00043 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$5,442,045 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| July 18, 2022 | P00042 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,823,869 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| June 14, 2022 | P00041 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,503,313 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| June 6, 2022 | P00040 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$9,058,315 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| June 1, 2022 | P00039 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$10,837,073 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| May 13, 2022 | P00038 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,422,950 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| May 6, 2022 | P00037 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,992,606 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| April 14, 2022 | P00036 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,871,229 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| March 30, 2022 | P00035 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$101,228 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| March 29, 2022 | P00034 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$776,754 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| March 10, 2022 | P00033 | FUNDING ONLY ACTION | +$2,000,000 | GSM-O II OPERATION AND SUSTAINMENT OF THE DODIN/DISN |
| March 9, 2022 | P00032 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | OPERATION AND SUSTAINMENT OF THE DODIN/DISN INFRASTRUCTURE |
| February 18, 2022 | P00031 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$10,063,424 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN INFRASTRUCTURE |
| February 15, 2022 | P00030 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$7,946,676 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN INFRASTRUCTURE |
| February 4, 2022 | P00029 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$948,523 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN INFRASTRUCTURE |
| January 20, 2022 | P00028 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$8,955,276 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| December 2, 2021 | P00027 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$79,296 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| November 23, 2021 | P00026 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$6,000,844 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| November 19, 2021 | P00025 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,783,045 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| November 18, 2021 | P00024 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$65,209,080 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| November 3, 2021 | P00023 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,713,636 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| September 29, 2021 | P00022 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$159,707 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| September 24, 2021 | P00021 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,060,058 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| September 14, 2021 | P00020 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$7,606,767 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| August 18, 2021 | P00019 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$263,245 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| August 9, 2021 | P00018 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,473,259 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| July 28, 2021 | P00017 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,082,207 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| June 16, 2021 | P00016 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| June 8, 2021 | P00015 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$7,082,346 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| May 18, 2021 | P00014 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,188,263 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| April 30, 2021 | P00013 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$695,721 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| April 2, 2021 | P00012 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,802,169 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| March 18, 2021 | P00011 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,888,691 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| March 5, 2021 | P00010 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,710,868 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| February 3, 2021 | P00009 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$562,063 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| January 15, 2021 | P00008 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,782,941 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| December 11, 2020 | P00007 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$5,488,405 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| December 3, 2020 | P00006 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| November 19, 2020 | P00005 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$78,164,514 | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| October 13, 2020 | P00004 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| September 25, 2020 | P00003 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | OPERATION AND SUSTAINMENT OF THE DISN INFRASTRUCTURE |
| May 29, 2020 | P00002 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$5,000,000 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN INFRASTRUCTURE |
| December 30, 2019 | P00001 | OTHER ADMINISTRATIVE ACTION | no money | OPERATION AND SUSTAINMENT OF THE DODIN/DISN INFRASTRUCTURE |
| December 17, 2019 | base | not on file | +$5,000,000 | OPERATION AND SUSTAINMENT OF THE DODIN/DISN INFRASTRUCTURE |
Last refreshed November 4, 2026 at 2:31 PM UTC.