LEIDOS, INC.
Federal contract award, Leidos, $561,160,177
Key CONT_AWD_HC102820F0500_9700_HC102820D0001_9700. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 158 days before this system saw it. One version on record.
Cite this row
623af7a3b69e0b3c829a701bf1b08a22b866eb38201c05e902b3a344ad9d03ceThe source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $561,160,177 | first version | September 8, 2020 | March 31, 2026 | 2026-09-05T00:54:19Z | historical sweep | 623af7a3b69e |
Archived copy
https://web.archive.org/web/20260517032238/https://www.usaspending.gov/award/CONT_AWD_HC102820F0500_9700_HC102820D0001_9700 found, made by someone else, May 17, 2026
What the amount is made of
130 recorded actions, so the amount is the award's current total across all of them. 111 of them obligated money. Measured 2026-10-13, when USAspending reported a total obligation of $561,160,177.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| March 31, 2026 | P00129 | FUNDING ONLY ACTION | −$199,157 | GSM-O II MAINTENANCE AND REPAIR DODIN/DISN |
| March 26, 2026 | P00128 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$481,522 | GSM-O II MAINTENANCE AND REPAIR OF DODIN/DISN |
| December 11, 2025 | P00127 | FUNDING ONLY ACTION | no money | GSM-O II MAINTENANCE AND REPAIR |
| October 16, 2025 | P00126 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O II MAINTENANCE AND REPAIR |
| September 30, 2025 | P00125 | FUNDING ONLY ACTION | no money | GSM-O II MAINTENANCE AND REPAIR |
| September 22, 2025 | P00124 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$239,116 | GSM-O II MAINTENANCE AND REPAIR |
| September 8, 2025 | P00123 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$102,746 | GSM-O II MAINTENANCE AND REPAIR |
| August 28, 2025 | P00122 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O II MAINTENANCE AND REPAIR |
| August 26, 2025 | P00121 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,341,235 | GSM-O II MAINTENANCE AND REPAIR |
| August 15, 2025 | P00120 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O II MAINTENANCE AND REPAIR |
| August 12, 2025 | P00119 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O II MAINTENANCE AND REPAIR |
| July 30, 2025 | P00118 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$224,293 | GSM-O II MAINTENANCE AND REPAIR |
| June 26, 2025 | P00117 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,041,917 | GSM-O II MAINTENANCE AND REPAIR |
| June 12, 2025 | P00116 | OTHER ADMINISTRATIVE ACTION | −$438,171 | GSM-O II MAINTENANCE AND REPAIR |
| May 28, 2025 | P00115 | OTHER ADMINISTRATIVE ACTION | −$2,400,102 | GSM-O II MAINTENANCE AND REPAIR |
| May 9, 2025 | P00114 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$203,279 | GSM-O II MAINTENANCE AND REPAIR |
| May 5, 2025 | P00113 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$83,124 | GSM-O II MAINTENANCE AND REPAIR |
| April 30, 2025 | P00112 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$35,076 | GSM-O II MAINTENANCE AND REPAIR |
| April 22, 2025 | P00111 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$16,735 | GSM-O II TN02 MAINTENANCE AND REPAIR |
| March 25, 2025 | P00110 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$456,031 | GSM-O II MAINTENANCE AND REPAIR |
| March 21, 2025 | P00109 | OTHER ADMINISTRATIVE ACTION | no money | GSM-O II MAINTENANCE |
| March 13, 2025 | P00108 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,600,316 | GSM-O II MAINTENANCE |
| February 20, 2025 | P00107 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$119,511 | GSM-O II MAINTENANCE |
| February 18, 2025 | P00106 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$400,905 | GSM-O II MAINTENANCE |
| February 7, 2025 | P00105 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$22,132,256 | GSM-O II MAINTENANCE |
| January 29, 2025 | P00104 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,426,418 | GSM-O II MAINTENANCE |
| January 14, 2025 | P00103 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,798,130 | GSM-O II MAINTENANCE |
| January 2, 2025 | P00102 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$12,930,365 | GSM-O II MAINTENANCE |
| December 28, 2024 | P00101 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$12,594,361 | GSM-O II MAINTENANCE |
| December 20, 2024 | P00100 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$7,146,461 | GSM-O II MAINTENANCE |
| December 16, 2024 | P00099 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$53,953 | GSM-O II MAINTENANCE |
| December 11, 2024 | P00098 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,237,534 | GSM-O II MAINTENANCE |
| December 6, 2024 | P00097 | OTHER ADMINISTRATIVE ACTION | −$401,353 | GSM-O II MAINTENANCE |
| November 30, 2024 | P00096 | EXERCISE AN OPTION | +$36,637,643 | GSM-II O MAINTENANCE |
| November 22, 2024 | P00095 | FUNDING ONLY ACTION | +$110,432 | GSM-O II MAINTENANCE |
| October 22, 2024 | P00094 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$1,047,041 | MAINTENANCE AND REPAIR SUPPORT |
| October 18, 2024 | P00093 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GMS-O II MAINTENANCE |
| September 30, 2024 | P00092 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| September 27, 2024 | P00091 | OTHER ADMINISTRATIVE ACTION | −$359,741 | GMS-O II MAINTENANCE |
| September 18, 2024 | P00090 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$843,442 | GSM-O II MAINTENANCE |
| September 6, 2024 | P00089 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$3,425,427 | GSM-O II MAINTENANCE |
| August 14, 2024 | P00088 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$331,791 | GSM-O II MAINTENANCE |
| August 7, 2024 | P00087 | OTHER ADMINISTRATIVE ACTION | −$1,641,660 | GSM-O II MAINTENANCE |
| July 15, 2024 | P00086 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$134,689 | GSM-O II MAINTENANCE |
| June 18, 2024 | P00085 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$620,683 | GSM-O II MAINTENANCE |
| May 29, 2024 | P00084 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$12,051 | GSM-O II MAINTENANCE |
| May 14, 2024 | P00083 | EXERCISE AN OPTION | +$3,311,508 | GSM-O II MAINTENANCE |
| April 19, 2024 | P00082 | FUNDING ONLY ACTION | +$257,334 | GSM-O II MAINTENANCE |
| April 12, 2024 | P00081 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$787,917 | GSM-O II MAINTENANCE |
| March 22, 2024 | P00080 | FUNDING ONLY ACTION | +$67,145 | GSM-O II MAINTENANCE |
| March 21, 2024 | P00079 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,882,490 | GSM-O II MAINTENANCE |
| March 7, 2024 | P00078 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$176,562 | GSM-O II MAINTENANCE |
| February 29, 2024 | P00077 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$3,217 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| February 23, 2024 | P00076 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$25,865 | GSM-O II MAINTENANCE AND REPAIR FOR DODIN/DISN INFRASTRUCTURE |
| February 9, 2024 | P00075 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$345,298 | GSM-O II MAINTENANCE |
| February 2, 2024 | P00074 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$29,722 | GSM-O II MAINTENANCE AND REPAIR FOR DODIN/DISN INFRASTRUCTURE |
| January 29, 2024 | P00073 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$31,289,927 | GSM-O II MAINTENANCE AND REPAIR FOR DODIN/DISN INFRASTRUCTURE |
| December 29, 2023 | P00072 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$9,616,285 | GSM-O II MAINTENANCE AND REPAIR FOR DODIN/DISN INFRASTRUCTURE |
| December 15, 2023 | P00071 | EXERCISE AN OPTION | +$60,842,685 | GSM-O II MAINTENANCE AND REPAIR FOR DODIN/DISN INFRASTRUCTURE |
| November 23, 2023 | P00070 | FUNDING ONLY ACTION | +$110,649 | GSM-O II MAINTENANCE AND REPAIR FOR DODIN/DISN INFRASTRUCTURE |
| November 7, 2023 | P00069 | OTHER ADMINISTRATIVE ACTION | no money | GSM-O II MAINTENANCE AND REPAIR FOR DODIN/DISN INFRASTRUCTURE |
| October 17, 2023 | P00068 | FUNDING ONLY ACTION | no money | GSM-O II MAINTENANCE AND REPAIR FOR DODIN/DISN INFRASTRUCTURE |
| September 26, 2023 | P00067 | FUNDING ONLY ACTION | +$197,103 | GSM-O II MAINTENANCE AND REPAIR FOR DODIN/DISN INFRASTRUCTURE |
| September 22, 2023 | P00066 | FUNDING ONLY ACTION | +$124,551 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| September 21, 2023 | P00065 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$118,462 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| September 18, 2023 | P00064 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$304,401 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| August 25, 2023 | P00063 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$212,736 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| August 17, 2023 | P00062 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,204,635 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| August 9, 2023 | P00061 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$499,155 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| July 12, 2023 | P00060 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,217,509 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| June 27, 2023 | P00059 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$253,164 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| June 20, 2023 | P00058 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$62,814 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| June 1, 2023 | P00057 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$761,281 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| May 19, 2023 | P00056 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,045,253 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| April 18, 2023 | P00055 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,309,791 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| April 7, 2023 | P00054 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$16,152,461 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| March 27, 2023 | P00053 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,911,659 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| March 7, 2023 | P00052 | FUNDING ONLY ACTION | no money | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| March 1, 2023 | P00051 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$917,032 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| February 17, 2023 | P00050 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$14,688,947 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| January 30, 2023 | P00049 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$29,082,098 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| January 13, 2023 | P00048 | FUNDING ONLY ACTION | +$619,265 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| December 23, 2022 | P00047 | EXERCISE AN OPTION | +$33,242,236 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| December 22, 2022 | P00046 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$174,863 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| November 16, 2022 | P00045 | OTHER ADMINISTRATIVE ACTION | no money | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| October 25, 2022 | P00044 | OTHER ADMINISTRATIVE ACTION | no money | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| October 18, 2022 | P00043 | FUNDING ONLY ACTION | +$460,000 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| October 7, 2022 | P00042 | FUNDING ONLY ACTION | −$1,202,530 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| September 23, 2022 | P00041 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$114,645 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| September 22, 2022 | P00040 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$572,922 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| September 19, 2022 | P00039 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,471 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| September 15, 2022 | P00038 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$122,665 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| September 12, 2022 | P00037 | FUNDING ONLY ACTION | −$59,482 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| August 25, 2022 | P00036 | FUNDING ONLY ACTION | +$6,142,555 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| August 1, 2022 | P00035 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$522,857 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| July 26, 2022 | P00034 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$506,225 | FPIF LABOR |
| July 15, 2022 | P00033 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,212 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| July 13, 2022 | P00032 | FUNDING ONLY ACTION | no money | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| June 28, 2022 | P00031 | FUNDING ONLY ACTION | +$1,947,846 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| June 6, 2022 | P00030 | FUNDING ONLY ACTION | no money | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| May 9, 2022 | P00029 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| April 22, 2022 | P00028 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$35,664 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| March 31, 2022 | P00027 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$12,671,011 | MAINTENANCE AND REPAIR OF THE DODIN/DISN |
| March 21, 2022 | P00026 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$1,460 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| March 14, 2022 | P00025 | FUNDING ONLY ACTION | +$238,184 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| February 4, 2022 | P00024 | FUNDING ONLY ACTION | +$179,068 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| January 24, 2022 | P00023 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,629,563 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| December 30, 2021 | P00022 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$91,058,976 | GSM-O II MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| December 28, 2021 | P00021 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$51,290 | DODIN MAINTENANCE SUPPORT |
| December 21, 2021 | P00020 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,392,302 | DODIN MAINTENANCE SUPPORT |
| November 3, 2021 | P00019 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$245,370 | DODIN MAINTENANCE SUPPORT |
| September 30, 2021 | P00018 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,929,354 | DODIN MAINTENANCE SUPPORT |
| September 28, 2021 | P00017 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,042,457 | DODIN MAINTENANCE SUPPORT |
| September 24, 2021 | P00016 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,214,553 | DODIN MAINTENANCE SUPPORT |
| September 21, 2021 | P00015 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,242,020 | DODIN MAINTENANCE SUPPORT |
| September 15, 2021 | P00014 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$20,356 | DODIN MAINTENANCE SUPPORT |
| September 9, 2021 | P00013 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,782,110 | DODIN MAINTENANCE SUPPORT |
| August 26, 2021 | P00012 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$16,834 | DODIN MAINTENANCE SUPPORT |
| August 5, 2021 | P00011 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,187,956 | DODIN MAINTENANCE SUPPORT |
| July 21, 2021 | P00010 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$602,889 | DODIN MAINTENANCE SUPPORT |
| June 2, 2021 | P00009 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$246,986 | DODIN MAINTENANCE SUPPORT |
| May 27, 2021 | P00008 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,771,536 | DODIN MAINTENANCE SUPPORT |
| May 6, 2021 | P00007 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$32,025 | DODIN MAINTENANCE SUPPORT |
| April 30, 2021 | P00006 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$4,158,566 | DODIN MAINTENANCE SUPPORT |
| April 15, 2021 | P00005 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$55,232 | DODIN MAINTENANCE SUPPORT |
| March 19, 2021 | P00004 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,965,851 | DODIN MAINTENANCE SUPPORT |
| February 3, 2021 | P00003 | OTHER ADMINISTRATIVE ACTION | no money | DODIN MAINTENANCE SUPPORT |
| December 31, 2020 | P00002 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$60,806,821 | MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| December 14, 2020 | P00001 | EXERCISE AN OPTION | +$35,688,409 | MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |
| September 8, 2020 | base | not on file | no money | MAINTENANCE AND REPAIR OF THE DODIN/DISN INFRASTRUCTURE |