LEIDOS, INC.
Federal contract award, Leidos, $484,368
Key CONT_AWD_N0001425C1132_9700_-NONE-_-NONE-. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 163 days before this system saw it. One version on record.
Cite this row
eb27cb233ff65bea5dfa0c4c169b3a98b24d65b5de5969ab673067d2ac299187The source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $484,368 | first version | September 16, 2025 | March 26, 2026 | 2026-09-05T00:57:04Z | historical sweep | eb27cb233ff6 |
Archived copy
https://web.archive.org/web/20261018092030/https://www.usaspending.gov/award/CONT_AWD_N0001425C1132_9700_-NONE-_-NONE- captured by this system, October 18, 2026
What the amount is made of
4 recorded actions, so the amount is the award's current total across all of them. 2 of them obligated money. Measured 2026-10-07, when USAspending reported a total obligation of $484,368.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| March 26, 2026 | P00003 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | LEIDOS WILL DESIGN A HYBRID META-OPTIC SYSTEM WITH REDUCED SIZE, WEIGHT, AND POWER (SWAP) THAT OPERATES WITH FUTURE 16KX16K FOCAL PLANE ARRAYS (FPA) FOR TARGET TRACKING IN CLUTTERED MARITIME ENVIRONMENTS. |
| February 12, 2026 | P00002 | EXERCISE AN OPTION | +$400,000 | LEIDOS WILL DESIGN A HYBRID META-OPTIC SYSTEM WITH REDUCED SIZE, WEIGHT, AND POWER (SWAP) THAT OPERATES WITH FUTURE 16KX16K FOCAL PLANE ARRAYS (FPA) FOR TARGET TRACKING IN CLUTTERED MARITIME ENVIRONMENTS. |
| December 3, 2025 | P00001 | OTHER ADMINISTRATIVE ACTION | no money | LEIDOS WILL DESIGN A HYBRID META-OPTIC SYSTEM WITH REDUCED SIZE, WEIGHT, AND POWER (SWAP) THAT OPERATES WITH FUTURE 16KX16K FOCAL PLANE ARRAYS (FPA) FOR TARGET TRACKING IN CLUTTERED MARITIME ENVIRONMENTS. |
| September 16, 2025 | base | not on file | +$84,368 | LEIDOS WILL DESIGN A HYBRID META-OPTIC SYSTEM WITH REDUCED SIZE, WEIGHT, AND POWER (SWAP) THAT OPERATES WITH FUTURE 16KX16K FOCAL PLANE ARRAYS (FPA) FOR TARGET TRACKING IN CLUTTERED MARITIME ENVIRONMENTS. |
Last refreshed November 4, 2026 at 2:31 PM UTC.