LEIDOS, INC.
Federal contract award, Leidos, $7,452,517
Key CONT_AWD_NRCHQ12T330012_3100_NRCHQ11C330060_3100. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 576 days before this system saw it. One version on record.
Cite this row
115c3c79dcc7f89f2e353df6a2959410d93d7389f7b50cef264c974125944f51The source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $7,452,517 | first version | March 12, 2012 | February 6, 2025 | 2026-09-05T00:55:13Z | historical sweep | 115c3c79dcc7 |
Archived copy
https://web.archive.org/web/20261013114153/https://www.usaspending.gov/award/CONT_AWD_NRCHQ12T330012_3100_NRCHQ11C330060_3100 captured by this system, October 13, 2026
What the amount is made of
102 recorded actions, so the amount is the award's current total across all of them. 84 of them obligated money. Measured 2026-10-11, when USAspending reported a total obligation of $7,452,517.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| February 6, 2025 | M0101 | CLOSE OUT | −$800 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| July 17, 2024 | M0100 | OTHER ADMINISTRATIVE ACTION | −$79,216 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| May 26, 2022 | M0099 | FUNDING ONLY ACTION | +$60,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| March 25, 2022 | M0098 | OTHER ADMINISTRATIVE ACTION | no money | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| March 7, 2022 | M0097 | OTHER ADMINISTRATIVE ACTION | +$25,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| January 28, 2022 | M0096 | CHANGE ORDER | no money | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| December 16, 2021 | M0095 | FUNDING ONLY ACTION | +$45,005 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 20, 2021 | M0094 | FUNDING ONLY ACTION | +$61,161 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 17, 2021 | M0093 | FUNDING ONLY ACTION | +$45,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 9, 2021 | M0092 | FUNDING ONLY ACTION | +$58,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| July 26, 2021 | M0091 | CHANGE ORDER | no money | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| July 12, 2021 | M0090 | FUNDING ONLY ACTION | +$75,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| June 21, 2021 | M0089 | FUNDING ONLY ACTION | +$20,615 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| May 21, 2021 | M0088 | FUNDING ONLY ACTION | +$25,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| April 21, 2021 | M0087 | FUNDING ONLY ACTION | +$45,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| February 16, 2021 | M0086 | FUNDING ONLY ACTION | +$15,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| February 5, 2021 | M0085 | FUNDING ONLY ACTION | +$60,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| September 8, 2020 | M0084 | OTHER ADMINISTRATIVE ACTION | no money | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| September 8, 2020 | M0083 | FUNDING ONLY ACTION | +$178,842 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 21, 2020 | M0082 | EXERCISE AN OPTION | no money | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| July 16, 2020 | M0081 | FUNDING ONLY ACTION | +$3,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| July 16, 2020 | M0080 | FUNDING ONLY ACTION | +$200,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| June 11, 2020 | M0079 | FUNDING ONLY ACTION | +$90,100 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| May 26, 2020 | M0078 | OTHER ADMINISTRATIVE ACTION | no money | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| April 22, 2020 | M0077 | FUNDING ONLY ACTION | +$220,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| April 13, 2020 | M0076 | FUNDING ONLY ACTION | +$150,000 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| September 20, 2019 | M0075 | EXERCISE AN OPTION | no money | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| September 3, 2019 | M0074 | FUNDING ONLY ACTION | +$191,215 | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 9, 2019 | M0073 | FUNDING ONLY ACTION | no money | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 7, 2019 | M0072 | EXERCISE AN OPTION | no money | (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| May 22, 2019 | M0071 | OTHER ADMINISTRATIVE ACTION | no money | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| February 27, 2019 | M0070 | FUNDING ONLY ACTION | +$100,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| January 3, 2019 | M0069 | FUNDING ONLY ACTION | +$180,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| September 27, 2018 | M0068 | FUNDING ONLY ACTION | +$360,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| September 20, 2018 | M0067 | FUNDING ONLY ACTION | +$100,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| September 5, 2018 | M0066 | FUNDING ONLY ACTION | +$64,863 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 24, 2018 | M0065 | FUNDING ONLY ACTION | +$90,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 8, 2018 | M0064 | FUNDING ONLY ACTION | +$66,315 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| July 3, 2018 | M0063 | FUNDING ONLY ACTION | +$147,878 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| June 27, 2018 | M0062 | EXERCISE AN OPTION | no money | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| May 29, 2018 | M0061 | FUNDING ONLY ACTION | +$150,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| February 14, 2018 | M0060 | FUNDING ONLY ACTION | +$50,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| September 11, 2017 | M0059 | FUNDING ONLY ACTION | +$491,463 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 23, 2017 | M0058 | OTHER ADMINISTRATIVE ACTION | no money | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| July 13, 2017 | M0057 | FUNDING ONLY ACTION | +$130,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| June 23, 2017 | M0056 | FUNDING ONLY ACTION | +$75,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| June 5, 2017 | M0055 | EXERCISE AN OPTION | +$30,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| March 24, 2017 | M0054 | FUNDING ONLY ACTION | +$40,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| February 10, 2017 | M0053 | FUNDING ONLY ACTION | +$79,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| January 4, 2017 | M0052 | FUNDING ONLY ACTION | +$50,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| September 28, 2016 | M0051 | FUNDING ONLY ACTION | +$170,258 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 5, 2016 | M0050 | FUNDING ONLY ACTION | +$100,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| July 8, 2016 | M0049 | FUNDING ONLY ACTION | +$18,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| December 8, 2015 | M0048 | FUNDING ONLY ACTION | +$25,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| September 16, 2015 | M0047 | EXERCISE AN OPTION | no money | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 5, 2015 | M0046 | OTHER ADMINISTRATIVE ACTION | no money | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| July 15, 2015 | M0045 | FUNDING ONLY ACTION | −$50,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| May 5, 2015 | M0044 | FUNDING ONLY ACTION | +$60,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| April 27, 2015 | M0043 | FUNDING ONLY ACTION | +$219,200 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| April 9, 2015 | M0042 | FUNDING ONLY ACTION | +$70,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| February 20, 2015 | M0041 | FUNDING ONLY ACTION | +$7,286 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| February 11, 2015 | M0040 | FUNDING ONLY ACTION | +$50,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| December 8, 2014 | M0039 | FUNDING ONLY ACTION | +$50,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| November 17, 2014 | M0038 | FUNDING ONLY ACTION | +$130,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| September 29, 2014 | M0037 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 26, 2014 | M0036 | FUNDING ONLY ACTION | −$20,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| August 22, 2014 | M0035 | FUNDING ONLY ACTION | +$71,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| July 29, 2014 | M0034 | FUNDING ONLY ACTION | +$56,413 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| July 8, 2014 | M0033 | FUNDING ONLY ACTION | +$120,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| June 19, 2014 | M0032 | EXERCISE AN OPTION | +$153,850 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| June 18, 2014 | M0031 | OTHER ADMINISTRATIVE ACTION | no money | IGF::OT::IGF TO ADJUST THE CEILING BACK TO CORRECT AMOUNT. |
| June 2, 2014 | M0030 | FUNDING ONLY ACTION | −$35,838 | IGF::OT::IGF DEOBLIGATE FUNDS |
| April 10, 2014 | M0029 | FUNDING ONLY ACTION | +$50,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| March 28, 2014 | M0028 | FUNDING ONLY ACTION | +$60,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| March 21, 2014 | M0027 | FUNDING ONLY ACTION | −$100,000 | IGF::OT::IGF (AD-HOC SUPPORT FOR SHORT TERM PROJECTS) |
| February 12, 2014 | M0026 | FUNDING ONLY ACTION | +$170,000 | IGF::OT::IGF - MOM FA2 IT OPERATIONS AND MAINTENANCE; TASK ORDER 12, AD-HOC SUPPORT FOR SHORT TERM PROJECTS |
| January 14, 2014 | M0025 | FUNDING ONLY ACTION | +$460,200 | IGF::OT::IGF - MOM FA2 IT OPERATIONS AND MAINTENANCE; TASK ORDER 12, AD-HOC SUPPORT FOR SHORT TERM PROJECTS |
| September 27, 2013 | M024 | FUNDING ONLY ACTION | +$50,000 | IGF::OT::IGF INCREMENTAL FUNDING AND SUBTASK FOR COMMISSIONER WORKSPACE SITE USING SHAREPOINT. MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| September 16, 2013 | M023 | FUNDING ONLY ACTION | +$7,000 | IGF::OT::IGF INCREMENTAL FUNDING AND SUBTASK FOR COMMISSIONER WORKSPACE SITE USING SHAREPOINT. MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| September 16, 2013 | M022 | FUNDING ONLY ACTION | +$186,000 | IGF::OT::IGF INCREMENTAL FUNDING AND SUBTASK FOR COMMISSIONER WORKSPACE SITE USING SHAREPOINT. MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| August 27, 2013 | M021 | FUNDING ONLY ACTION | +$10,000 | IGF::OT::IGF INCREMENTAL FUNDING AND SUBTASK FOR COMMISSIONER WORKSPACE SITE USING SHAREPOINT. MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| August 22, 2013 | M020 | FUNDING ONLY ACTION | +$26,987 | IGF::OT::IGF INCREMENTAL FUNDING AND SUBTASK FOR COMMISSIONER WORKSPACE SITE USING SHAREPOINT. MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| August 7, 2013 | M019 | FUNDING ONLY ACTION | +$25,267 | IGF::OT::IGF ADDITIONAL LABOR CATEGORIES. MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| July 18, 2013 | M018 | EXERCISE AN OPTION | +$29,000 | IGF::OT::IGF ADDITIONAL LABOR CATEGORIES. MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| July 9, 2013 | M017 | FUNDING ONLY ACTION | +$15,000 | IGF::OT::IGF MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS MOD M017 FOR ADDITIONAL FUNDING. |
| July 8, 2013 | M016 | FUNDING ONLY ACTION | +$250,000 | IGF::OT::IGF ADDITIONAL LABOR CATEGORIES. MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS. MOD M016 ADDS FUNDS. |
| May 20, 2013 | M015 | FUNDING ONLY ACTION | +$240,000 | IGF::OT::IGF ADDITIONAL LABOR CATEGORIES. MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| May 1, 2013 | M014 | FUNDING ONLY ACTION | no money | IGF::OT::IGF ADDITIONAL LABOR CATEGORIES. MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| March 27, 2013 | M013 | FUNDING ONLY ACTION | +$12,500 | IGF::OT::IGF INCREMENTAL FUNDING: MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| February 21, 2013 | M012 | FUNDING ONLY ACTION | +$22,960 | IGF::OT::IGF INCREMENTAL FUNDING: MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| January 28, 2013 | M011 | FUNDING ONLY ACTION | +$15,000 | IGF::OT::IGF INCREMENTAL FUNDING: MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| November 8, 2012 | M010 | FUNDING ONLY ACTION | +$320,000 | INCREMENTAL FINDING: MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| September 19, 2012 | M009 | FUNDING ONLY ACTION | +$11,800 | MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| September 4, 2012 | M008 | FUNDING ONLY ACTION | +$7,000 | MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| July 10, 2012 | M007 | EXERCISE AN OPTION | no money | MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| June 27, 2012 | M006 | FUNDING ONLY ACTION | +$208,000 | MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| June 12, 2012 | M005 | FUNDING ONLY ACTION | +$65,239 | MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| June 12, 2012 | M004 | FUNDING ONLY ACTION | +$85,159 | MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| May 30, 2012 | M003 | FUNDING ONLY ACTION | +$21,000 | MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS/ PROJECT ENTITLED |
| April 18, 2012 | M002 | FUNDING ONLY ACTION | +$107,000 | MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS |
| April 11, 2012 | M001 | FUNDING ONLY ACTION | +$64,794 | MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS |
| March 12, 2012 | base | not on file | +$145,000 | MOM FA2 IT OPERATIONS AND MAINTENANCE; "TASK ORDER 12," AD-HOC SUPPORT FOR SHORT TERM PROJECTS |
Last refreshed November 4, 2026 at 2:31 PM UTC.