LEIDOS, INC.
Federal contract award, Leidos, $130,280,650
Key CONT_AWD_W56JSR19F0069_9700_W15P7T12DE001_9700. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 340 days before this system saw it. One version on record.
Cite this row
cac64723268055af375dd051c0ea015dd56e7bbf163ccd77b6c9e390f2b6c5ffThe source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $130,280,650 | first version | April 25, 2019 | September 30, 2025 | 2026-09-05T00:54:22Z | historical sweep | cac647232680 |
Archived copy
https://web.archive.org/web/20261008174614/https://www.usaspending.gov/award/CONT_AWD_W56JSR19F0069_9700_W15P7T12DE001_9700 captured by this system, October 8, 2026
What the amount is made of
100 recorded actions, so the amount is the award's current total across all of them. 85 of them obligated money. Measured 2026-10-13, when USAspending reported a total obligation of $130,280,650.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| September 30, 2025 | P00080 | FUNDING ONLY ACTION | +$342 | CUSTOM COMPUTER PROGRAMMING SERVICES |
| September 15, 2025 | P00079 | FUNDING ONLY ACTION | −$436,112 | THIS MODIFICATION, P00079, ON TASK ORDER W56JSR-19-F-0069 IS TO DE-OBLIGATE REMAINING FUNDING FROM MULTIPLE SLINS. |
| June 5, 2025 | P00078 | OTHER ADMINISTRATIVE ACTION | no money | MOD P0078 ON W56JSR-19-F-0069 TO CORRECT LINE OF ACCOUNTING ERROR ON PREVIOUS MOD. W56JSR-19-F-0069 IS FOR MAINTENANCE AND SUSTAINMENT FOR MULTIPLE PROGRAMS OF RECORD AND SOFTWARE SYSTEMS. |
| September 27, 2024 | P00077 | FUNDING ONLY ACTION | −$64,691 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING UNDER OPTION YEAR 3. |
| September 27, 2024 | P00077 | FUNDING ONLY ACTION | −$1,283,972 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING UNDER OPTION YEAR 3. |
| August 12, 2024 | P00076 | FUNDING ONLY ACTION | +$110,000 | INCREMENTAL FUNDING AND REALIGNMENT |
| August 7, 2024 | P00075 | OTHER ADMINISTRATIVE ACTION | no money | ADMIN MOD TO CORRECT THE LINE OF ACCOUNTING (LOA) FOR THE PROCUREMENT OF POST DEPLOYMENT SOFTWARE SUSTAINMENT AND POST-PRODUCTION SOFTWARE SUSTAINMENT |
| August 5, 2024 | P00074 | FUNDING ONLY ACTION | +$773,422 | INCREMENTAL FUNDING |
| July 2, 2024 | P00073 | FUNDING ONLY ACTION | +$703,800 | INCREMENTAL FUNDING |
| June 20, 2024 | P00072 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | REALIGNMENT OF FUNDS AND POP EXTENSION. |
| May 29, 2024 | P00071 | FUNDING ONLY ACTION | +$315,000 | INCREMENTAL FUNDING |
| May 24, 2024 | P00070 | FUNDING ONLY ACTION | +$4,355,668 | INCREMENTAL FUNDING MOD |
| May 7, 2024 | P00069 | EXERCISE AN OPTION | no money | EXERCISE 52.217-8 OPTION |
| April 9, 2024 | P00068 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$385,485 | ADD FUNDING |
| April 3, 2024 | P00067 | FUNDING ONLY ACTION | +$289,966 | INCREMENTAL FUNDING MOD |
| March 19, 2024 | P00066 | OTHER ADMINISTRATIVE ACTION | +$243,391 | FUNDING MOD |
| February 26, 2024 | P00065 | OTHER ADMINISTRATIVE ACTION | no money | ADMIN MOD TO CORRECT LOA ERROR |
| February 5, 2024 | P00064 | FUNDING ONLY ACTION | +$1,446,099 | ADDING INCREMENTAL FUNDING |
| January 22, 2024 | P00063 | FUNDING ONLY ACTION | +$500,000 | ADDING INCREMENTAL FUNDING |
| January 22, 2024 | P00063 | FUNDING ONLY ACTION | +$79,731 | ADDING INCREMENTAL FUNDING |
| December 26, 2023 | P00062 | FUNDING ONLY ACTION | +$1,593,171 | ADDING INCREMENTAL FUNDING |
| October 3, 2023 | P00061 | OTHER ADMINISTRATIVE ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO TRANSFER PURCHASING OFFICE RESPONSIBILITY FROM W56JSR (ACC-APG DIVISION E) TO W15P7T (ACC-APG DIVISION B). |
| September 28, 2023 | P00060 | FUNDING ONLY ACTION | +$62,762 | THIS IS FOR POST DEPLOYMENT SOFTWARE SUPPORT, POST PRODUCTION SOFTWARE SUPPORT, MAINTENANCE, AND SUSTAINMENT FOR MULTIPLE PROGRAMS OF RECORD, SOFTWARE SYSTEMS, AND SOFTWARE DEVELOPMENT NETWORKS. |
| September 27, 2023 | P00059 | FUNDING ONLY ACTION | +$147,650 | THIS IS FOR POST DEPLOYMENT SOFTWARE SUPPORT, POST PRODUCTION SOFTWARE SUPPORT, MAINTENANCE, AND SUSTAINMENT FOR MULTIPLE PROGRAMS OF RECORD, SOFTWARE SYSTEMS, AND SOFTWARE DEVELOPMENT NETWORKS. |
| September 27, 2023 | P00059 | FUNDING ONLY ACTION | +$711,905 | THIS IS FOR POST DEPLOYMENT SOFTWARE SUPPORT, POST PRODUCTION SOFTWARE SUPPORT, MAINTENANCE, AND SUSTAINMENT FOR MULTIPLE PROGRAMS OF RECORD, SOFTWARE SYSTEMS, AND SOFTWARE DEVELOPMENT NETWORKS. |
| September 19, 2023 | P00058 | FUNDING ONLY ACTION | +$2,881,579 | MOD TO OBLIGATE FUNDING ON OPTION PERIOD 4. |
| September 13, 2023 | P00057 | FUNDING ONLY ACTION | +$1,084,267 | DECREASE FUNDING ON SLIN 400901 AND INCREASE OP4 SEC FUNDS. |
| August 11, 2023 | P00056 | FUNDING ONLY ACTION | +$450,000 | MOD TO CORRECT LOA, EXTEND POP, OBLIGATE FUNDING AND ADD CLAUSE UNDER OPTION PERIOD 4. |
| August 11, 2023 | P00056 | FUNDING ONLY ACTION | +$35,740 | MOD TO CORRECT LOA, EXTEND POP, OBLIGATE FUNDING AND ADD CLAUSE UNDER OPTION PERIOD 4. |
| July 11, 2023 | P00055 | FUNDING ONLY ACTION | −$379,250 | OBLIGATION OF FUNDING UNDER OPTION YEAR 4. |
| July 11, 2023 | P00055 | FUNDING ONLY ACTION | +$2,137,818 | OBLIGATE FUNDING ON TAM 242, 257, AND 263 ON OPTION YEAR 4. |
| June 30, 2023 | P00054 | FUNDING ONLY ACTION | −$1,687,420 | DE-OBLIGATION OF FUNDING UNDER OPTION YEAR 3. |
| June 30, 2023 | P00054 | FUNDING ONLY ACTION | −$379,250 | DE-OBLIGATION OF FUNDING UNDER OPTION YEAR 3. |
| May 24, 2023 | P00053 | EXERCISE AN OPTION | +$4,187,461 | RE-ALIGN FUNDING FROM 7712 TO 7200. EXERCISE AND OBLIGATE FUNDING UNDER OPTION PERIOD 4. |
| May 24, 2023 | P00053 | EXERCISE AN OPTION | +$182,060 | EXERCISE AND OBLIGATE FUNDING ON OPTION PERIOD 4. |
| May 2, 2023 | P00052 | FUNDING ONLY ACTION | +$270,605 | OBLIGATE AND RE-ALIGN FUNDING ON OPTION YEAR 3 AND CORRECTION ON CLIN 8300 ON FEE AND COST. |
| March 31, 2023 | P00051 | FUNDING ONLY ACTION | +$2,073,847 | ADDING FUNDING AND EXTENDING 1 CLIN TO 3/1/2023 |
| February 10, 2023 | P00050 | FUNDING ONLY ACTION | +$40,000 | ADD FUNDING, UPDATE PWS, CORRECT LINE OF ACCOUNTING |
| February 10, 2023 | P00050 | FUNDING ONLY ACTION | +$23,496 | ADDS FUNDING- FMS FUNDS |
| January 19, 2023 | P00049 | OTHER ADMINISTRATIVE ACTION | no money | ADDING GFP LIST, GFP CLAUSES |
| December 27, 2022 | P00048 | FUNDING ONLY ACTION | +$640,748 | FUNDING AND EXTEND CLIN |
| December 8, 2022 | P00047 | FUNDING ONLY ACTION | −$533,774 | DEOBLIGATE FUNDS |
| December 8, 2022 | P00047 | FUNDING ONLY ACTION | −$546,686 | DEOBLIGATION, ADDS FUNDING |
| November 1, 2022 | P00046 | FUNDING ONLY ACTION | +$774,159 | FUNDING |
| September 28, 2022 | P00045 | FUNDING ONLY ACTION | +$1,258,208 | ADD FUNDING |
| August 31, 2022 | P00044 | FUNDING ONLY ACTION | +$4,314,379 | FUNDING, EXTEND CLINS |
| July 29, 2022 | P00043 | FUNDING ONLY ACTION | +$714,788 | ADD FUNDING, UPDATE PROPERTY ATTACHMENT 0008, DEOBLIGATE FUNDS |
| July 29, 2022 | P00043 | FUNDING ONLY ACTION | +$736,094 | FUNDING, ATTACHMENT 0008, PROPERTY LIST UPDATED, DEOBLIGATE FUNDS |
| May 24, 2022 | P00042 | EXERCISE AN OPTION | +$13,496,619 | AWARD OPTION PERIOD 3, CHANGE ADMINISTRATION OFFICE, EXTEND COMPLETION SLINS |
| May 24, 2022 | P00042 | EXERCISE AN OPTION | +$833,225 | AWARD OPTION PERIOD 3, CHANGE ADMINISTRATION OFFICE, EXTEND COMPLETION SLINS |
| March 30, 2022 | P00041 | OTHER ADMINISTRATIVE ACTION | +$350,397 | ADDS FUNDING THE TASK ORDER PROVIDES SYSTEM AND SOFTWARE ACQUISITION SUPPORT, SOFTWARE SUSTAINMENT & ENHANCEMENT & PROVIDES POST DEPLOYMENT SOFTWARE SUPPORT & POST PRODUCTION SOFTWARE SUPPORT |
| March 23, 2022 | P00040 | FUNDING ONLY ACTION | −$853,565 | DEOBLIGATION OF EXCESS FUNDS, OBLIGATION OF FUNDS, THE TASK ORDER PROVIDE SYSTEM AND SOFTWARE ACQUISITION SUPPORT, SOFTWARE SUSTAINMENT AND ENHANCEMENT AND PROVIDE POST DEPLOYMENT SOFTWARE SUPPORT (PDSS) AND POST PRODUCTION SOFTWARE SUPPORT (PPSS), SUPPORT TO SEC SOFTWARE ENVIRONMENTS AND FACILITIES, AND INFORMATION TECHNOLOGY INFRASTRUCTURE SUPPORT |
| March 23, 2022 | P00040 | FUNDING ONLY ACTION | +$65,518 | OBLIGATE FUNDS THE TASK ORDER PROVIDE SYSTEM AND SOFTWARE ACQUISITION SUPPORT, SOFTWARE SUSTAINMENT AND ENHANCEMENT AND PROVIDE POST DEPLOYMENT SOFTWARE SUPPORT (PDSS) AND POST PRODUCTION SOFTWARE SUPPORT (PPSS), SUPPORT TO SEC SOFTWARE ENVIRONMENTS AND FACILITIES, AND INFORMATION TECHNOLOGY INFRASTRUCTURE SUPPORT |
| February 8, 2022 | P00039 | FUNDING ONLY ACTION | +$119,556 | FUNDING ADDED FOR TAM 168, PWS AND CDRLS UPDATED, REALIGNMENT TO FUND TAM 164 |
| December 29, 2021 | P00038 | FUNDING ONLY ACTION | +$430,547 | ADD FUNDING AND CHANGE THE END DATE OF ONE CONTRACT LINE ITEM NUMBER |
| December 15, 2021 | P00037 | FUNDING ONLY ACTION | +$39,620 | FUNDING FOR TAM 186 |
| December 10, 2021 | P00036 | OTHER ADMINISTRATIVE ACTION | no money | DATE EXTENSION FOR 6666 CLIN |
| September 24, 2021 | P00035 | FUNDING ONLY ACTION | +$2,434,327 | FUNDING ADDED |
| September 24, 2021 | P00035 | FUNDING ONLY ACTION | +$466,294 | FUNDING |
| September 2, 2021 | P00033 | FUNDING ONLY ACTION | −$213,142 | ADDS FUNDING, DEOBLIGATIONS |
| September 2, 2021 | P00033 | FUNDING ONLY ACTION | +$9,584,633 | FUNDING |
| August 31, 2021 | P00034 | FUNDING ONLY ACTION | +$286,423 | FUNDING |
| August 26, 2021 | P00032 | FUNDING ONLY ACTION | +$4,415,234 | DEOBLIGATE FUNDS & ADD FUNDS |
| August 26, 2021 | P00032 | FUNDING ONLY ACTION | −$32,295 | DEOBLIGATE FUNDS, ADD FUNDS |
| May 24, 2021 | P00031 | EXERCISE AN OPTION | +$7,736,681 | OPTION 2 , FUNDING, DEOBLIGATION |
| May 24, 2021 | P00031 | EXERCISE AN OPTION | +$2,694,071 | OPTION 2, FUNDING, DEOBLIGATION |
| May 21, 2021 | P00030 | FUNDING ONLY ACTION | +$44,802 | ADDING FUNDS TO TAM 118, EXTEND 5200 |
| April 6, 2021 | P00029 | FUNDING ONLY ACTION | −$44,802 | DEOBLIGATION OF FUNDS |
| March 18, 2021 | P00028 | FUNDING ONLY ACTION | +$147,568 | FUNDING |
| March 18, 2021 | P00028 | FUNDING ONLY ACTION | +$695,993 | FUNDING |
| January 12, 2021 | P00027 | FUNDING ONLY ACTION | +$3,011,799 | ADD FUNDING |
| January 8, 2021 | P00026 | FUNDING ONLY ACTION | +$1,041,152 | FUNDING MODIFICATION |
| January 8, 2021 | P00026 | FUNDING ONLY ACTION | +$1,114,664 | ADD FUNDING, INCREASE CEILING |
| October 30, 2020 | P00025 | FUNDING ONLY ACTION | +$77,545 | ADDS FUNDING TO SUPPORT TAM 112 TPQ 50 V 2.1.4 |
| September 29, 2020 | P00024 | FUNDING ONLY ACTION | +$10,195,925 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN SUPPORT OF THE FIRES DIVISION OF THE SOFTWARE ENGINEERING CENTER'S COMMAND, CONTROL, COMMUNICATIONS: TACTICAL POST DEPLOYMENT SOFTWARE SUSTAINMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT MISSION. |
| September 25, 2020 | P00023 | FUNDING ONLY ACTION | +$277,857 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN SUPPORT OF THE SOFTWARE ENGINEERING CENTER'S FIRES DIVISION'S COMMAND, CONTROL, COMMUNICATIONS: TACTICAL (C3T) POST DEPLOYMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT. |
| September 18, 2020 | P00022 | FUNDING ONLY ACTION | −$1,859,106 | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE CURRENT YEAR FUNDING AND TO INCORPORATE SECTION 889(A)(1)(B) INTO THE TASK ORDER. |
| September 4, 2020 | P00021 | FUNDING ONLY ACTION | −$809,647 | THE PURPOSE OF THIS MODIFICATION IS TO ALLOCATE THROUGH REALIGNMENT, OBLIGATION AND DEOBLIGATION FUNDING IN SUPPORT OF THE C3T POST DEPLOYMENT SOFTWARE SUSTAINMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT FOR THIS SOFTWARE ENGINEERING CENTER'S (SEC) SSESNEXGEN TASK ORDER. |
| August 20, 2020 | P00020 | FUNDING ONLY ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING IN SUPPORT OF THE SOFTWARE ENGINEERING CENTER FIRES DIVISION'S SOFTWARE SUSTAINMENT MISSION. |
| July 24, 2020 | P00019 | FUNDING ONLY ACTION | +$83,036 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING IN SUPPORT OF THE C3T PDSS&PPSS TASK ORDER UNDER THE SSES NEXGEN IDIQ AND TO IMPROVE THE CONTRACT LINE ITEM STRUCTURE FOR PURPOSES OF CONTRACT ADMINISTRATION. |
| June 12, 2020 | P00018 | OTHER ADMINISTRATIVE ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE PAYMENT INSTRUCTIONS FOR THE SSES NEXGEN TASK ORDER W15P7T-12-D-E001 W56JSR-19-F-0069. |
| May 29, 2020 | P00017 | FUNDING ONLY ACTION | −$694,421 | THE PURPOSE OF THIS MODIFICATION IS PROVIDED FUNDING IN SUPPORT OF THE SOFTWARE ENGINEERING CENTER'S OPTION YEAR 1 OF THE C3T POST DEPLOYMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT TASK ORDER UNDER THE SSES NEXGEN IDIQ. |
| April 29, 2020 | P00016 | FUNDING ONLY ACTION | +$5,827,027 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN SUPPORT OF THE SOFTWARE ENGINEERING CENTER'S COMMAND, CONTROL, AND COMMUNICATIONS: TACTICAL POST DEPLOYMENT SOFTWARE SUSTAINMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT TASK ORDER UNDER THE SSES NEXGEN IDIQ. |
| April 28, 2020 | P00015 | EXERCISE AN OPTION | +$11,286,700 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD 1 FOR THE SOFTWARE ENGINEERING CENTERS COMMAND, CONTROL, COMMUNICATIONS: TACTICAL DIVISION POST DEPLOYMENT SOFTWARE SUSTAINMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT TASK ORDER UNDER THE SSES NEXGEN IDIQ. |
| April 15, 2020 | P00014 | FUNDING ONLY ACTION | +$516,460 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN SUPPORT OF THE SOFTWARE ENGINEERING CENTER'S POST DEPLOYMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT OF MISSION COMMAND AND FIRES DIVISION SYSTEMS. |
| April 14, 2020 | P00013 | OTHER ADMINISTRATIVE ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO RESTRUCTURE THE CONTRACT LINE ITEMS FOR THE OPTION PERIOD 1 TO BETTER FACILITATE CONTRACT ADMINISTRATION FOR BOTH THE GOVERNMENT AND THE CONTRACTOR. |
| March 23, 2020 | P00012 | FUNDING ONLY ACTION | +$1,228,789 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN SUPPORT OF THE SOFTWARE ENGINEERING CENTER'S TASK ORDER FOR COMMAND, CONTROL, COMMUNICATIONS: TACTICAL POST DEPLOYMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT. |
| March 23, 2020 | P00011 | OTHER ADMINISTRATIVE ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN THE TOTAL ESTIMATED COST ACROSS THE CLINS IN ACCORDANCE WITH THE TASK ORDER'S PERFORMANCE WORK STATEMENT. |
| February 21, 2020 | P00010 | FUNDING ONLY ACTION | +$645,000 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN SUPPORT OF THE MISSION COMMAND COMMON SOFTWARE CONTRACT LINE ITEM NUMBER (CLIN). |
| February 4, 2020 | P00009 | FUNDING ONLY ACTION | +$2,406,004 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN SUPPORT OF THE SOFTWARE ENGINEERING CENTER'S COMMAND, CONTROL, COMMUNICATIONS: TACTICAL POST DEPLOYMENT SOFTWARE SUSTAINMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT TASK ORDER. |
| December 27, 2019 | P00008 | FUNDING ONLY ACTION | +$510,427 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN SUPPORT OF THE FIRES DIVISION OF THE SOFTWARE ENGINEERING CENTER FOR THE POST DEPLOYMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT MISSION. |
| November 27, 2019 | P00007 | FUNDING ONLY ACTION | +$2,015,996 | THIS MODIFICATION IS TO OBLIGATE FUNDING IN SUPPORT OF THE SOFTWARE ENGINEERING CETNER'S C3T POST DEPLOYMENT SOFTWARE SUSTAINMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT TASK ORDER UNDER THE SSESNEXGEN INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT. |
| November 19, 2019 | P00006 | FUNDING ONLY ACTION | +$900,000 | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING, REALIGN FUNDING AND REALIGN CONTRACTOR INITIATED TOTAL ESTIMATED COST AND FIXED FEE ACROSS THE CONTRACT LINE ITEMS IN SUPPORT OF THE SEC C3T PDSS&PPSS MISSION REQUIREMENTS. |
| September 25, 2019 | P00005 | FUNDING ONLY ACTION | +$4,492,440 | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXISTING AND OBLIGATE NEW FUNDING IN SUPPORT OF MISSION REQUIREMENTS UNDER THE SOFTWARE ENGINEER CENTER'S C3T POST DEPLOYMENT SOFTWARE SUSTAINMENT&POST PRODUCTION SOFTWARE SUSTAINMENT TASK ORDER ON THE SSES NEXGEN IDIQ. |
| September 23, 2019 | P00004 | OTHER ADMINISTRATIVE ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE BY REFERENCE FAR CLAUSE 52.222-62 WHICH IS REQUIRED BY INCLUSION OF FAR 52.222-41 WITHIN THE SSESNEXGEN BASE CONTRACT. ADDITIONALLY THIS MODIFICATION REALIGNS FUNDING IN SUPPORT OF THE C3T POST DEPLOYMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT MISSIONS. |
| July 12, 2019 | P00003 | OTHER ADMINISTRATIVE ACTION | +$451,934 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING SUMMARY OF TRAVEL CLIN 4200 WHICH INCORRECTLY SUMMARIZED THE TOTAL OBLIGATED AMOUNT FOR THAT CLIN, OBLIGATE FUNDING, AND INCORPORATE WAGE DETERMINATIONS INTO THE SSES NEXGEN TASK ORDER FOR C3T POST DEPLOYMENT SOFTWARE SUSTAINMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT. |
| May 24, 2019 | P00002 | FUNDING ONLY ACTION | +$3,952,563 | FUNDING MODIFICATION |
| May 20, 2019 | P00001 | OTHER ADMINISTRATIVE ACTION | no money | THIS MODIFICATION TO THE C3T PDSS&PPSS TASK ORDER UNDER THE SOFTWARE ENGINEERING CENTER'S MULTIPLE AWARD TASK ORDER INDEFINITE QUANTITY INDEFINITE DELIVERY CONTRACT IS ADMINISTRATIVE CHANGES TO ALLOW THE CONTRACTOR TO TRANSITION INTO FULL RESPONSIBILITY OVER THE REQUIREMENTS COME 25 MAY 2019. THIS ACTION WILL ALLOW FOR THE CONTRACTOR TO OBTAIN COMPUTER ACCESS CARDS AND CAMPUS BADGES. |
| April 25, 2019 | base | not on file | +$12,698,313 | THIS TASK ORDER UNDER THE SSES-NEXGEN MULTIPLE AWARD INDEFINITE QUANTITY INDEFINITE DELIVERY CONTRACT IS TO PROVIDE THE SOFTWARE ENGINEERING CENTER'S C3T DIRECTORATE WITH POST DEPLOYMENT SOFTWARE SUSTAINMENT AND POST PRODUCTION SOFTWARE SUSTAINMENT FOR A PERIOD OF 12 MONTHS WITH FOUR ADDITIONAL 12 MONTH OPTION PERIODS. |
| April 25, 2019 | base | not on file | no money | POST PRODUCTION SOFTWARE SUSTAINMENT AND POST DEPLOYMENT SOFTWARE SUSTAINMENT |
Last refreshed November 4, 2026 at 2:31 PM UTC.