MAXIMUS EDUCATION LLC
Federal contract award, Maximus, $303,129,964
Key CONT_AWD_91003124F0317_9100_91003123D0001_9100. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 127 days before this system saw it. One version on record.
Cite this row
1bf3063f5259be7597f7e52082e008b828b8cd4078e60dfe8cacccb809d83c4aThe source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.
Versions
| Version | Amount | Change | Occurred | Published | Retrieved | How it arrived | Content hash |
|---|---|---|---|---|---|---|---|
| 1 current | $303,129,964 | first version | June 28, 2024 | May 1, 2026 | 2026-09-05T00:49:14Z | historical sweep | 1bf3063f5259 |
Archived copy
None on file. An archived copy is optional corroboration and never a condition of this filing’s provenance, which is the stored response and its hash above; see the methodology page.
What the amount is made of
56 recorded actions, so the amount is the award's current total across all of them. 44 of them obligated money. Measured 2026-10-23, when USAspending reported a total obligation of $301,664,602.
| Action date | Modification | Type | Obligated | Description as recorded |
|---|---|---|---|---|
| October 14, 2026 | P00055 | FUNDING ONLY ACTION | −$2,790,392 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING THAT IS NOT NEEDED. |
| September 28, 2026 | P00056 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,333,268 | THE PURPOSE OF MODIFICATION P00056 IS TO DOCUMENT THE UNITED STATES CIVILIAN BOARD OF CONTRACT APPEALS RULING FOR CBCA 8407 AND 8408 DATED SEPTEMBER 2, 2026, BETWEEN MAXIMUS EDUCATION LLC, DBA AIDVANTAGE AND THE DEPARTMENT OF EDUCATION. |
| September 14, 2026 | P00054 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$8,238 | THE PURPOSE OF MODIFICATION P00054 IS TO FINALIZE A SETTLEMENT BETWEEN THE CONTRACTOR AND GOVERNMENT DUE TO THE TERMINATION OF CONVENIENCE OF CR 7192. |
| May 1, 2026 | P00053 | FUNDING ONLY ACTION | −$21,041 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING THAT IS NOT NEEDED. |
| February 19, 2026 | P00052 | CHANGE ORDER | +$274,481 | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE REQUIREMENTS AND FIRM FIXED PRICE FUNDING FOR THE CHANGE ORDER ISSUED FOR CR7213 NATIONAL STUDENT LOAN DATA SYSTEM (NSLDS) JOINT CONSOLIDATION LOAN SEPARATION AND REVISES THE IMPLEMENTATION DATES FOR |
| December 18, 2025 | P00051 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | THE PURPOSE OF MODIFICATION P00051 IS TO UPDATE IMPLEMENTATION DATE OF CHANGE REQUEST 6972 CATCH UP CR FOR USDS SERVICERS REQUIREMENT 5001.050 |
| December 12, 2025 | P00050 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$5,341,404 | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE EXCESS QUANTITIES AND FUNDING THAT IS NOT NEEDED. |
| December 1, 2025 | P00049 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | THIS MODIFICATION IS ISSUED TO PROVIDE EXTENSIONS TO STOP WORK ORDERS IN ACCORDANCE WITH CONTRACT FAR CLAUSE 52.242-15 STOP WORK ORDER (AUG 1989). |
| October 27, 2025 | P00048 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | THE PURPOSE OF THIS MODIFICATION IS TO REVISE IMPLEMENTATION DATES FOR CRS 7420 OB3 SERVICER IBR CHANGES AND CR 6822 FINE GRAIN FORBEARANCE REPORTING'S PHASE 4. |
| September 17, 2025 | P00047 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$197,599 | THE PURPOSE OF THIS MODIFICATION IS TO FORMALIZE REQUIREMENTS AND FUNDING FOR THE CHANGE ORDER ISSUED FOR CR 7213, AND TO ADD FUNDING AND REQUIREMENTS ASSOCIATED WITH IMPLEMENTING CRS 7428 AND 7429. |
| September 9, 2025 | P00046 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | THIS MODIFICATION IS ISSUED TO DOCUMENT THE ISSUANCE OF AND PROVIDE EXTENSIONS TO STOP WORK ORDERS IN ACCORDANCE WITH CONTRACT FAR CLAUSE 52.242-15 STOP WORK ORDER (AUG 1989). |
| August 27, 2025 | P00045 | CHANGE ORDER | +$525,263 | THE PURPOSE OF MODIFICATION P00045 IS TO ADD FUNDING AND REQUIREMENTS ASSOCIATED WITH IMPLEMENTING CR7420 OBBA SERVICER IBR CHANGES, ADD FUNDING ASSOCIATED WITH THE LATEST EMPLOYMENT COST INDEX (ECI) RELEASE, IN ACCORDANCE WITH THE ECONOMIC PRICE ADJ |
| August 13, 2025 | P00044 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | STOP WORK EXTENSION FOR SINGLE SIGN ON AND CR7312 - FY25 FINANCIAL AUDIT HANDOUTS - NON-DEFAULTED LOANS |
| July 30, 2025 | P00043 | FUNDING ONLY ACTION | −$8,810 | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE EXCESS FUNDING ON TASK ORDER 91003124F0317. |
| July 30, 2025 | P00042 | EXERCISE AN OPTION | +$40,955,779 | THE PURPOSE OF THE MODIFICATION P00042 IS TO EXTEND THE CURRENT TASK ORDER BY INCREASING THE QUANTITY AND VALUES OF THE OPTION, AND TO EXERCISE THE INCREASE TO THE OPTION PERIOD CLINS IN THE TOTAL AMOUNT OF $40,955,778.74 WITH A PERIOD OF PERFORMANCE |
| July 28, 2025 | P00041 | CHANGE ORDER | +$265,814 | THE PURPOSE OF MODIFICATION P00041 IS TO DEFINITIZE REQUIREMENTS AND FIRM FIXED PRICE FUNDING FOR CR 7233 - MOVING OF FEBRUARY AND MARCH 2025 IDR ANNIVERSARY DATES FOR SAVE AND COMBO BORROWERS DUE TO SAVE INJUNCTION AND 7150 - SPS PHASE 3 INTEGRATION |
| July 21, 2025 | P00040 | CHANGE ORDER | +$8,438 | THE PURPOSE OF MODIFICATION P00040 IS TO ADD FUNDING AND REQUIREMENTS ASSOCIATED WITH IMPLEMENTING CR7398 FSA CLOUD NETWORK FOR KAFKA BROKER BEING REHOSTED ON MSK. |
| July 9, 2025 | P00039 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$131,608 | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING AND REQUIREMENTS ASSOCIATED WITH IMPLEMENTING CHANGE REQUEST 7357 AND CHANGE REQUEST 7385. |
| June 18, 2025 | P00038 | CHANGE ORDER | no money | THIS MODIFICATION IS ISSUED TO DOCUMENT THE ISSUANCE OF AND PROVIDE EXTENSIONS TO STOP WORK ORDERS IN ACCORDANCE WITH CONTRACT FAR CLAUSE 52.242-15 STOP WORK ORDER (AUG 1989). |
| June 17, 2025 | P00037 | CHANGE ORDER | no money | THE PURPOSE OF THE MODIFICATION IS TO UPDATE THE IMPLEMENTATION DATE OF CHANGE REQUEST 6822. |
| June 13, 2025 | P00036 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$44,182 | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR MAY SERVICES IN THE TOTAL AMOUNT OF $44,181.71. |
| June 12, 2025 | P00035 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$857,343 | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE EXCESS FUNDING THAT IS NOT NEEDED. |
| June 5, 2025 | P00034 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$1,300,000 | HE PURPOSE OF MODIFICATION P00034 IS TO ADD AT RISK INCENTIVE FUNDING AND DETAILS. |
| May 30, 2025 | P00033 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$40,445,332 | THE PURPOSE OF THE MODIFICATION P00033 IS TO EXTEND THE CURRENT TASK ORDER BY INCREASING THE QUANTITY AND VALUES OF THE OPTION, AND TO EXERCISE THE INCREASE TO THE OPTION PERIOD CLINS IN THE TOTAL AMOUNT OF $40,445,332.02 WITH A PERIOD OF PERFORMANCE |
| May 9, 2025 | P00032 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$2,457 | FULLY FUND CR 7191 RESUME PROCESSING IBR/ICR/PAYE |
| May 8, 2025 | P00031 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$851,021 | THE PURPOSE OF MODIFICATION P00031 IS TO DEFINITIZE REQUIREMENTS AND FIRM FIXED PRICE FUNDING FOR CRS 7031, 7187, 7189, 7219. |
| May 2, 2025 | P00030 | CHANGE ORDER | +$84,345 | THE PURPOSE OF MODIFICATION P00030 IS TO DEFINITIZE REQUIREMENTS AND FIRM FIXED PRICE FUNDING FOR CR 7339 - MOVING OF FEB 2025 THROUGH JAN 2026 IDR ANNIVERSARY DATES FOR NON-SAVE BORROWERS. |
| May 2, 2025 | P00029 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$76,524 | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR APRIL SERVICES IN THE TOTAL AMOUNT OF $76,524.39. |
| May 1, 2025 | P00028 | EXERCISE AN OPTION | +$20,512,357 | EXTEND THE CURRENT TASK ORDER BY ADDING OPTION PERIOD CLINS, INCREASE THE QUANTITY AND VALUES OF THE OPTION, AND EXERCISE THE OPTION PERIOD CLINS IN THE TOTAL AMOUNT OF $20,512,357.00 WITH A PERIOD OF PERFORMANCE OF 05/01/25-05/31/25. |
| April 22, 2025 | P00027 | CHANGE ORDER | +$77,915 | THE PURPOSE OF MODIFICATION P00027 IS TO DEFINITIZE REQUIREMENTS AND FIXED PRICE FUNDING FOR CR 7340 - SPOUSAL TREATMENT CHANGES FOR PROCESSING IBR, ICR, AND PAYE REPAYMENT PLANS. |
| April 15, 2025 | P00026 | CHANGE ORDER | +$18,687 | THE PURPOSE OF MODIFICATION P00026 IS TO DEFINITIZE REQUIREMENTS AND FIXED PRICE FUNDING FOR CRS 7248, 7249, 7304, AND 7331 |
| April 10, 2025 | P00025 | CHANGE ORDER | no money | THE PURPOSE OF THIS MODIFICATION IS TO MEMORIALIZE THE ISSUANCE AND LIFTING OF THE STOP-WORK ORDER ISSUED ON JANUARY 17, 2025, FOR TPD TRANSFERS. MAXIMUS IS AUTHORIZED TO RESUME ALL WORK RELATED TO TPD TRANSFERS. |
| April 9, 2025 | P00024 | FUNDING ONLY ACTION | +$220,320 | THE PURPOSE OF THE MODIFICATION P00024 IS TO ADD FUNDING FOR MARCH SERVICES IN THE TOTAL AMOUNT OF $220,320.45. |
| March 31, 2025 | P00023 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$20,535,990 | THE PURPOSE OF MODIFICATION P00023 IS TO EXTEND THIS TASK ORDER FOR ONE-MONTH IN ACCORDANCE WITH FAR 52.217-8 OPTION TO EXTEND SERVICES. THE PERIOD OF PERFORMANCE WILL BE EXTENDED FROM APRIL 1, 2025 THROUGH APRIL 30, 2025. |
| March 3, 2025 | P00022 | OTHER ADMINISTRATIVE ACTION | no money | THIS MODIFICATION IS ISSUED TO DOCUMENT THE ISSUANCE ON FEBRUARY 26, 2025 OF A STOP WORK ORDER IN ACCORDANCE WITH CONTRACT FAR CLAUSE 52.242-15 STOP WORK ORDER (AUG 1989). THE STOP WORK ORDER ENTITLED 2025 STOPPING IDR PROCESSING IS ATTACHED. |
| March 3, 2025 | P00021 | DEFINITIZE CHANGE ORDER | −$5,456,433 | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE EXCESS FUNDING ON TASK ORDER 91003124F0317. |
| February 13, 2025 | P00020 | CHANGE ORDER | +$30,323 | CHANGE ORDER CR7331 MOVING OF APRIL THROUGH JAN 2026 IDR ANNIVERSARY DATES FOR SAVE AND COMBO BORROWERS |
| January 30, 2025 | P00018 | EXERCISE AN OPTION | +$40,390,351 | THE PURPOSE OF MODIFICATION IS TO EXERCISE THE OPTION PERIOD CLINS ADD FUNDING FOR JANUARY SERVICES AND ADD FUNDING FOR CR6969 MAILING CHARGES. |
| January 16, 2025 | P00017 | FUNDING ONLY ACTION | no money | THE PURPOSE OF THIS MODIFICATION IS REPLACE FUNDING DOCUMENT ON CLIN 2004 (EDOFSA-25-000442) WITH FUNDING DOCUMENT EDOFSA-25-000490 TO REPLACE THE OBJECT CLASS CODE. |
| January 13, 2025 | P00016 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$149,298 | THE PURPOSE OF MODIFICATION P00016 IS TO DEFINITIZE THE FIRM FIXED PRICE FUNDING FOR CHANGE REQUEST 7067 ISSUED AS NOT TO EXCEED. |
| December 30, 2024 | P00015 | EXERCISE AN OPTION | +$20,089,405 | THE PURPOSE OF MODIFICATION P00015 IS TO ADJUST THE QUANTITY AND VALUES OF THE OPTIONS TO EXERCISE THE OPTION PERIOD CLINS, WITH A PERIOD OF PERFORMANCE OF 1/1/2025-1/31/2025, AND TO ADD OPTIONAL CLINS FOR THE PERIOD OF 2/1/2025-3/31/2025. |
| December 30, 2024 | P00014 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | THE PURPOSE OF MODIFICATION P00014 IS TO MAKE CORRECTIONS FROM P00012. |
| December 20, 2024 | P00013 | FUNDING ONLY ACTION | +$107,409 | THE PURPOSE OF MODIFICATION P00013 IS TO PROVIDE FUNDING IN THE AMOUNT OF $107,409.00 FOR FULFILLMENT (IDIQ CLIN 006). FUNDS IN THE AMOUNT OF $101,960.00 ARE PROVIDED FOR ON CLIN 1012AB FULFILLMENT - SCANNED DOCS AND FUNDS IN THE AMOUNT OF $5,449.00 |
| December 19, 2024 | P00012 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | −$476,099 | THE PURPOSE OF MODIFICATION P00012 IS TO DEFINITIZE CHANGE ORDERS 4,5,6,7,8,10&11, ADD CR 7036, AND TO ADD THE FEDCONNECT INSTRUCTIONS. |
| December 10, 2024 | P00011 | FUNDING ONLY ACTION | −$1,000,000 | DEOBLIGATION IN THE AMOUNT OF $1,000,000.00. CLIN 0003AC IS DECREASED FROM $1,000,000.00, BY $1,000,000.00, TO $0.00. |
| November 1, 2024 | P00010 | CHANGE ORDER | +$2,087,583 | THE PURPOSE OF MODIFICATION P00010 IS TO FORMALIZE REQUIREMENTS AND FUNDING FOR CHANGE ORDERS ISSUED IN OCTOBER 2024AND ISSUE A CHANGE ORDER TO ADD CR 7031-SPS PHASE 2 INTEGRATION WITH USDS SERVICERS. FUNDING IS ADDED AS A NOT TO EXCEED VALUE. |
| October 29, 2024 | P00009 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$45,063,803 | THE PURPOSE OF MODIFICATION P00009 IS TO ADD ADDITIONAL FUNDING IN THE AMOUNT OF $906,557 TO FUND THE CURRENT POP OF 7/1/2024-10/31/2024 AND EXERCISE THE OPTION PERIOD IN THE AMOUNT OF $44,157,245.74 WITH A POP OF 11/1/2024-12/31/2024. |
| September 27, 2024 | P00008 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$5,241,475 | THE PURPOSE OF THIS MODIFICATION IS TO FORMALIZE REQUIREMENTS AND FUNDING FOR CHANGE ORDERS ISSUED IN JULAND AUG 2024, ADD FUNDS FOR CR7170-IDR-MOVING OF NOVEMBER 2024 IDR ANNIVERSARY DATES, ADD O&M FUNDING, AND AT RISK INCENTIVE FUNDING AND DETAILS. |
| September 20, 2024 | P00007 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$519,539 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CR 6822 - FINE GRAIN FORBEARANCE REPORTING TO NSLDS - REVISED AND PROVIDE ADDITIONAL FUNDING IN THE AMOUNT OF $519,539.08 |
| September 16, 2024 | P00006 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$353,691 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CR 7054 - NSLDS IDR PROXY INELIGIBLE MONTHS AND PROVIDE ADDITIONAL FUNDING IN THE AMOUNT OF $353,691.37. |
| September 4, 2024 | P00005 | OTHER ADMINISTRATIVE ACTION | +$254,473 | THE PURPOSE OF MODIFICATION P00005 IS ADDING FUNDING ASSOCIATED WITH THE LATEST EMPLOYMENT COST INDEX (ECI) RELEASE, IN ACCORDANCE WITH THE ECONOMIC PRICE ADJUSTMENT TERMS AS WRITTEN IN THE CONTRACT. |
| August 19, 2024 | P00004 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$193,021 | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING AND REQUIREMENTS ASSOCIATED WITH IMPLEMENTING CHANGE REQUEST - 7067 - JOINT CONSOLIDATION LOAN SEPARATION - PHASE 1 FOR THE FIXED PRICE OF $193,020.73. |
| August 19, 2024 | P00003 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | no money | THE PURPOSE OF THIS MODIFICATION IS FUNDING AND REQUIREMENTS FOR CR 7125-USDS SERVICER INFORMATION PORTAL INTEGRATION WITH AIMS MFA-NELNET, FIRM-FIXED PRICE OF $0.00. NELNET ADDED URLS TO BE INTEGRATED WITH THE AIMS SYSTEM. A CONTINUATION OF CR 6889. |
| July 23, 2024 | P00002 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$223,662 | THE PURPOSE OF THIS MODIFICATION IS ADDING FUNDING AND REQUIREMENTS FOR CR 6972 -USDS-3RD CATCH-UP CR FOR USDS SERVICERS TO PROVIDE UPDATE TO BUSINESS REQUIREMENTS AND TO CORRECT TYPOS, ADD MISSING PUNCTUATION, AND PROVIDE CONSISTENT DOCUMENT FORMAT |
| July 22, 2024 | P00001 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | +$819,820 | THE PURPOSE OF MODIFICATION P00001 IS ADDING FUNDING AND REQUIREMENTS AS FOLLOWS CR 6676 USDS CONSOLIDATION ORIGINATOR UPDATES AND CR 7026 USDS REAMORITIZATION SCHEDULE |
| June 28, 2024 | base | not on file | +$76,239,768 | OPERATIONS AND MAINTENANCE (O&M) TASK ORDER FOR STUDENT LOAN SERVICING IN ACCORDANCE WITH THE REQUIREMENTS OF THE USDS CONTRACT. ALL WORK AND DELIVERABLES PROVIDED MUST BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT FOR THE TASK ORDER. |
Last refreshed November 4, 2026 at 2:31 PM UTC.