MAXIMUS FEDERAL SERVICES, INC.

Federal contract award, Maximus, $892,757,975

Key CONT_AWD_EDFSA13C0021_9100_-NONE-_-NONE-. First seen by this system September 5, 2026 through the historical sweep, new to the watchlist, public 9 days before this system saw it. One version on record.

Cite this row

On this site https://evidence.ourrevolution.media/filings/maximus/CONT_AWD_EDFSA13C0021_9100_-NONE-_-NONE-
At the source https://www.usaspending.gov/award/CONT_AWD_EDFSA13C0021_9100_-NONE-_-NONE-
Observed 2026-09-05, version 1, retrieved 2026-09-05T00:49:14Z
Content hash 323ce96338d91dc16ee23d0bca4ab527fdf59797760bd8f8a2e229d2b8df9caf

The source record can change after this date; the key, hash and retrieval time name exactly the response this system stored. See license and citation.

Versions

VersionAmountChangeOccurredPublishedRetrievedHow it arrivedContent hash
1
current
$892,757,975first versionSeptember 27, 2013August 27, 20262026-09-05T00:49:14Zhistorical sweep323ce96338d9

Archived copy

None on file. An archived copy is optional corroboration and never a condition of this filing’s provenance, which is the stored response and its hash above; see the methodology page.

What the amount is made of

313 recorded actions, so the amount is the award's current total across all of them. 246 of them obligated money. Measured 2026-10-24, when USAspending reported a total obligation of $892,727,844.

Action dateModificationTypeObligatedDescription as recorded
September 23, 2026P00313SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE−$30,131THE PURPOSE OF MODIFICATION P00313 IS TO DEOBLIGATE UNUSED FUNDS.
August 27, 2026P00312OTHER ADMINISTRATIVE ACTION−$14,162,557DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) -THE PURPOSE OF MODIFICATION P00312 IS TO CANCEL CR 5478, 6737, 6855, 7071, 7054, 7008, 7136, 7103 AND DE-OBLIGATE FUNDS NO LONGER NEEDED ON DMCS CONTRACT:
September 16, 2025P00311FUNDING ONLY ACTION−$11,843DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) -DE-OBLIGATE FY22-24 FUNDS IN THE AMOUNT OF $11,842.93 FROM, CONTRACT LINE ITEM 7001AB, 7003AC, 7003AD, 8002AB, AND 8002AM.
August 19, 2025P00310OTHER ADMINISTRATIVE ACTION−$1,890,408DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) -DE-OBLIGATE FY24 FUNDS IN THE AMOUNT OF $1,890,408.31 FROM (REFERENCE CONTRACT MODIFICATION NO. P00304 PURCHASE REQUEST NO. EDOFSA-24-001121), UNDER CONTRACT
July 1, 2025P00309OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS)
February 21, 2025P00308FUNDING ONLY ACTION−$3,313,844DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS)
November 1, 2024P00307SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$658,143THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS OF $658.142.94 FOR CR 7103, GAP ANALYSIS FOR 3RD PARTY DEBT COLLECTION ON DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS CONTRACT (FSA'S BORROWER DEFAULT PORTFOLIO SYSTEM).
November 1, 2024P00306SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$230,744THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS OF $230,744.15 FOR CR 7136, BPO DCC DMCS COLLECTIONS SOLUTIONING, ON DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS CONTRACT (FSA'S BORROWER DEFAULT PORTFOLIO SYSTEM).
October 25, 2024P00305SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$55,971THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS OF $55,971.40 FOR CR 6964, MIGRATE FROM ALIEN VAULT TO MAXIMUS CLOUD SPLUNK ON DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS CONTRACT (FSA'S BORROWER DEFAULT PORTFOLIO SYSTEM).
September 25, 2024P00304EXERCISE AN OPTION+$18,109,106DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS CONTRACT (FSA'S BORROWER DEFAULT PORTFOLIO SYSTEM). EXERCISE FAR 52.217-8 OPTION TO EXTEND SERVICES FROM 01 NOV 2024 TO 31 JAN 2025 DUE TO DMCS-NEXT ACQUISITION DELAY.
September 20, 2024P00303SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$7,445,836THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS OF $7,445,836.20 FOR CR 7008, TOP 65 DAY NOTICES END OF FRESH START, ADDITIONAL FUNDING FOR BORROWER DEFENSE CR 6346, 5239 ON DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS CONTRACT (FSA'S BORROWER DEFAULT PORTFOLIO SYSTEM).
September 13, 2024P00302SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$116,074THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS OF $116.074.11 FOR CR 7054, NSLDS IDR PROXY INELIGIBLE MONTHS, ON DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS CONTRACT (FSA'S BORROWER DEFAULT PORTFOLIO SYSTEM).
September 6, 2024P00301SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$400,786THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS OF $400.786.24 FOR CR 7011, DMCS - NEW PAYMENT CALCULATION METHODOLOGY, ON DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS CONTRACT (FSA'S BORROWER DEFAULT PORTFOLIO SYSTEM).
August 26, 2024P00300FUNDING ONLY ACTION+$2,237,885THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDS OF $2,237,884.90 FOR MAILOUTS ON CR 7039, DMCS SDR - DMCS STUDENT DEBT RELIEF DISCHARGE PROCESSING ON DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS CONTRACT (FSA'S BORROWER DEFAULT PORTFOLIO SYSTEM).
August 21, 2024P00299FUNDING ONLY ACTION−$1,116,414THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FY22 FUNDING FROM DEBT MANAGEMENT AND COLLECTIONS SYSTEM CONTRACT IN THE AMOUNT OF $1,116,413.81 FOR PARTIAL CANCELLATION OF CR 6120, DMCS ENABLEMENT OF BPO FUNCTIONALITY.
July 29, 2024P00298EXERCISE AN OPTION+$18,109,106DEBT MANAGEMENT AND COLLECTIONS SYSTEM -DMCS EXERCISE FAR 52.217-8 OPTION TO EXTEND SERVICES FROM 1 AUG 2024 TO 31 OCT 2024 DUE TO DMCS-NEXT ACQUISITION DELAY.
July 16, 2024P00297SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$441,425THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST 7039 DMCS STUDENT DEBT RELIEF DISCHARGE PROCESSING, ON THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS).
July 2, 2024P00296SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$372,874THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST 7070, CREATE SKIP TRACING PROCESS FOR DMCS, ON TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) FOR SWEET BORROWERS AND FUTURE SKIP TRACING NEEDS.
June 27, 2024P00295FUNDING ONLY ACTION+$2,470,000THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDS OF $2,470,000.00 FOR DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS FOR MAINTENANCE FOR CR 6346, CR 5239, CR 4753, AND CR 4619 BORROWER DEFENSE DISCHARGES.
June 17, 2024P00294SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$4,690,367THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST 7071 - DMCS POSTAL MAIL NOTICES END OF FRESH START, ON TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS).
June 14, 2024P00293OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) THE PURPOSE OF THIS MODIFICATION IS TO ORDER A STOP WORK ON CR 6955, BORROWER DEFENSE CONSOLIDATION ADJUSTMENTS RESEARCH, FORMALLY OBLIGATED ON MODIFICATION P00289.
June 3, 2024P00292FUNDING ONLY ACTION+$8,000,000THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEMS CONTRACT FOR O&M UNDER SUBCLIN 8001AM IN THE AMOUNT OF $3,600,000.00 AND 8002AL IN THE AMOUNT OF $4,400,000.00 FOR JUNE AND JULY, 2024.
May 31, 2024P00291OTHER ADMINISTRATIVE ACTIONno moneyDMCS CONTRACT - THIS MODIFICATION AUTHORIZES A PRICE ADJUSTMENT IN LABOR COST PURSUANT TO EXECUTIVE ORDER 14026 AND EFFECTIVE JANUARY 1, 2024.
April 30, 2024P00290FUNDING ONLY ACTION+$6,036,369THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEMS CONTRACT FOR O AND M UNDER SUBCLIN 8001AL IN THE AMOUNT OF $2,750,368.70 AND 8002AK IN THE AMOUNT OF $3,286,000.00.
April 23, 2024P00289SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$940,694THE PURPOSE OF THIS MODIFICATION IS TO EXECUTE CR 6955, BORROWER DEFENSE CONSOLIDATION ADJUSTMENTS RESEARCH, ON TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THIS IS WORK TOWARDS SWEET BORROWER DEFENSE DISCHARGE SETTLMENT.
April 4, 2024P00288SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$354,040THE PURPOSE OF THIS MODIFICATION IS TO PLACE CR 6628, FEDLOAN SERVICING INTEREST RATE CORRECTIONS, ON TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS).
March 26, 2024P00287FUNDING ONLY ACTION+$6,036,369THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEMS CONTRACT FOR O AND M UNDER SUBCLIN 8001AK IN THE AMOUNT OF $2,750,368.70 AND 8002AJ IN THE AMOUNT OF $3,286,000.00.
March 21, 2024P00286SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$2,499,099THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST 6855, IBR FUNCTIONALITY FOR DMCS DEFAULTED BORROWERS BEGINNING OCTOBER 1, 2024, ON TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS).
February 23, 2024P00285SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$155,387THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST 6737, TREASURY OFFSET PROGRAM REFUND REPORTING TO DMCS, ON THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM CONTRACT.
February 23, 2024P00284SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$11,280THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST 6918, FRESH START CORRECTION MAILING TO DOJ BORROWERS, MEMORIALIZE NO COST CHANGE REQUESTS AND CANCELLED CHANGE REQUESTS, AND UPDATE CHANGES IN KEY PERSONNEL, ON THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM CONTRACT,
January 17, 2024P00283FUNDING ONLY ACTION+$520,000THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDS OF 400,000.00 FOR DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS AND $120,000.00 FOR MAINTENANCE FOR CR 4280 AND CR 6341, BORROWER DEFENSE DISCHARGE.
December 21, 2023P00282FUNDING ONLY ACTION+$12,200,000THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEMS CONTRACT FOR O AND M UNDER SUBCLIN 8001AJ IN THE AMOUNT OF $5,490,000.00 AND 8002AH IN THE AMOUNT OF $6,710,000.00.
November 14, 2023P00281FUNDING ONLY ACTION+$15,750,000THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEMS CONTRACT FOR O AND M UNDER SUBCLIN 8001AH IN THE AMOUNT OF $12,197,167.98 AND 8002AG IN THE AMOUNT OF $3,552,832.02.
September 27, 2023P00279FUNDING ONLY ACTION+$600,000THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING FOR CHANGE REQUEST 4619, BDD STOP COLLECTION IN THE AMOUNT OF $600,000.00.
September 27, 2023P00278FUNDING ONLY ACTION+$400,000THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING TO THE CR 5931 CARES ACT DMCS REVERSE DEFAULT GA LOANS FULFILLMENT IN THE AMOUNT OF 400,000.00.
September 27, 2023P00277SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$104,070THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST 6791 - DMCS PAYMENT FILE FOR SERVICERS - BORROWER DEFENSE DISCHARGES, ON THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM CONTRACT.
September 27, 2023P00276FUNDING ONLY ACTION+$4,761,041THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEMS CONTRACT UNDER SUBCLIN 8002AF FOR O AND M SERVICING IN THE AMOUNT OF $4,761,041.05 AND RE-PURPOSE FUNDS ON CLIN 8002AD FOR ADDITIONAL O AND M SERVICING FOR THE PERIOD OF 10/16/23 - 11/14/23.
September 22, 2023P00275CHANGE ORDERno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO UPDATE DEPARTMENT OF EDUCATION CYBER AND PERSONNEL SECURITY CLAUSES TO BE IN COMPLIANCE.
September 19, 2023P00274SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$220,054THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST 6675, USDS - CRI SERVICER & SPECIALTY PROCESSING SUBSYSTEM (SPS) SETUP, ON THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM CONTRACT.
September 1, 2023P00273FUNDING ONLY ACTION+$2,000,000THE PURPOSE OF MODIFICATION P00273 IS TO RECLASSIFY SELECT DMCS CONTRACT EXPENSES RELATED TO CUSTOMER SERVICE UNDER MANDATORY FUNDING AS APPROVED BY OMB AND TO ADD ADDITIONAL FUNDS FOR PREVIOUSLY APPROVED CHANGE REQUESTS.
August 21, 2023P00272FUNDING ONLY ACTION−$2,571,044THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FY22 FUNDING FROM DEBT MANAGEMENT AND COLLECTIONS SYSTEM CONTRACT IN THE AMOUNT OF $2,251,044.20.
July 27, 2023P00271EXERCISE AN OPTION+$21,044,272DEBT MANAGEMENT AND COLLECTIONS SYSTEM THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD VIII (LAST OPTION) IN ACCORDANCE WITH FAR 52.217-9, OPTION TO EXTEND TERM OF THE CONTRACT WITH A PERIOD OF PERFORMANCE FROM AUGUST 1, 2023 THROUGH JULY 31, 2024. INCREMENTALLY FUNDED TO 15 OCT 2023.
June 23, 2023P00269SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$210,444THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST 6570 GREAT LAKES DECOMMISSION ON THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM CONTRACT AND EXTEND THE STOP WORK ORDER FOR CR 6120 BY 90 DAYS.
June 13, 2023P00268SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPEno moneyTHE PURPOSE OF THIS MODIFICATION IS TO COMPLY WITH FAC 2023 04, EFFECTIVE JUNE 2, 2023, AND INCORPORATE FAR CLAUSE 52.204 27, PROHIBITION ON A BYTEDANCE COVERED APPLICATION, INTO THE CONTRACT.
June 3, 2023P00270FUNDING ONLY ACTION−$1,008,207THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FY19, FY20, AND FY21 FUNDING FROM DEBT MANAGEMENT AND COLLECTIONS SYSTEM CONTRACT IN THE AMOUNT OF 1,008,206.69.
May 25, 2023P00256OTHER ADMINISTRATIVE ACTIONno moneyTHE PURPOSE OF THIS MODIFICATION IS TO SEPARATE CONTRACT LINE ITEMS 7001 AND 8001 FOR OPERATIONS AND MAINTENANCE INTO CLINS FOR IT SYSTEM OPERATIONS TO BE PAID OUT OF DISCRETIONARY FUNDING AND CUSTOMER SERVICE TO BE PAID OUT OF MANDATORY FUNDING.
May 24, 2023P00267SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$203,846THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST 6613, IDR ONE-TIME ADJUSTMENT OPT-OUT ON THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM CONTRACT.
May 4, 2023P00266FUNDING ONLY ACTION+$19,800,000THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEMS CONTRACT IN THE AMOUNT OF 19,800,000.
May 2, 2023P00265OTHER ADMINISTRATIVE ACTIONno moneyTHIS MODIFICATION AUTHORIZES A PRICE ADJUSTMENT IN LABOR COSTS PURSUANT TO EXECUTIVE ORDER 14026 AND EFFECTIVE JANUARY 1,2023.
April 27, 2023P00264SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$38,920THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST 6568, IDR ONE-TIME ADJUSTMENT OPT-OUT ON THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM.
April 25, 2023P00263OTHER ADMINISTRATIVE ACTIONno moneyTHE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO CHANGE FINANCIAL CODING ON DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATION AND MAINTENANCE LINE-ITEM FUNDS ON PREVIOUS AWARDED CONTRACT MODIFICATION P00262.
April 20, 2023P00262SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$153,188THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST 6238, ELECTRONIC PROCESS FOR GA ASSIGNMENTS ON THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM.
April 7, 2023P00261OTHER ADMINISTRATIVE ACTION+$400,000THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDS OF 400,000.00 FOR DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS AND MAINTENANCE FOR CR 4280, BORROWER DEFENSE DISCHARGE.
April 3, 2023P00260SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE−$3,200,000THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS FROM CR 5599, CARES ACT RESUME COLLECTIONS 2ND MAILING, IN THE AMOUNT OF 3,200,000.00 FROM THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM CONTRACT.
March 31, 2023P00259FUNDING ONLY ACTION+$6,600,000THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEMS CONTRACT UNDER SUBCLIN 7001AQ FOR THE AMOUNT OF $6,600,000.00.
March 27, 2023P00258SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$165,971THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS FOR DEBT MANAGEMENT AND COLLECTIONS SYSTEM CHANGE REQUEST 6341, FRESH START FOR NEW AID RECIPIENTS.
March 23, 2023P00257CHANGE ORDERno moneyTHE PURPOSE OF THIS MODIFICATION IS TO ISSUE A STOP WORK ORDER ON ALL TASKS RELATED TO CR 6120 - DEBT MANAGEMENT AND COLLECTIONS SYSTEM, ENABLEMENT OF BPO FUNCTIONALITY, PLACED UNDER BY CONTRACT MODIFICATION P00212.
March 14, 2023P00255OTHER ADMINISTRATIVE ACTIONno moneyTHE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO CHANGE FINANCIAL CODING FOR DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATION AND MAINTENANCE LINE ITEM 7004AL CHANGED TO 7004AS.
March 9, 2023P00254FUNDING ONLY ACTION+$3,400,000THE PURPOSE OF THIS MODIFICATION IS TO ADDITIONAL FUNDS OF $3,400,000.00 FOR CR 6346, BORROWER DEFENSE GROUP DISCHARGES, TO CONTRACT LINE ITEM 7004AR. CR 6346 WAS PREVIOUSLY ADDED ON MOD P00225.
March 9, 2023P00253SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$127,682THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS FOR CHANGE REQUEST 6430, DEBT MANAGEMENT AND COLLECTIONS SYSTEM IDR ACCOUNT ADJUSTMENT, PHASE 1 ONE TIME ACCOUNT ADJUSTMENT.
March 2, 2023P00252OTHER ADMINISTRATIVE ACTIONno moneyTHIS MODIFICATION AUTHORIZES A PRICE ADJUSTMENT IN LABOR COSTS PURSUANT TO FAR CLAUSE 52.222-55. CLIN 7001 FUR CHANGES FROM $0.96 TO $0.963 FOR THE PERIOD AUGUST 1 - DECEMBER 31, 2022.
February 24, 2023P00251FUNDING ONLY ACTION+$40,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) THE PURPOSE OF THIS MODIFICATION IS TO ADDITIONAL FUNDS OF $40,000.00 FOR DMCS CR 6323, DMCS DEFAULT CONTROL MAIL, TO CONTRACT LINE ITEM (CLIN) 7004AQ FOR ADDITIONAL INCREASES IN VOLUME FOR FIXED UNIT RATE ITEMS NOT PREVIOUSLY ANTICIPATED AT THE TIME CR 6323 WAS ADDED BY CONTRACT MODIFICATION P00226.
February 24, 2023P00250FUNDING ONLY ACTION+$6,728,000THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS TO OPERATIONS AND MAINTENANCE TO SUBCLIN 7001AP IN THE AMOUNT OF $6,728,000.00 TO THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM CONTRACT.
February 9, 2023P00249OTHER ADMINISTRATIVE ACTIONno moneyTHE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO CHANGE FINANCIAL CODING ON DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATION AND MAINTENANCE LINE-ITEM FUNDS 7004AH TO 7004AM.
February 9, 2023P00248OTHER ADMINISTRATIVE ACTIONno moneyTHE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO CHANGE FINANCIAL CODING FOR FIVE DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATION AND MAINTENANCE LINE ITEMS.
January 30, 2023P00247FUNDING ONLY ACTION+$6,768,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS TO OPERATIONS AND MAINTENACE TO SUBCLIN 7001AK IN THE AMOUNT OF $6,768,000.00.
January 5, 2023P00246OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO MEMORIALIZE NO COST CHANGE REQUESTS AND CANCELLED CHANGE REQUESTS.
December 29, 2022P00245FUNDING ONLY ACTION+$6,768,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS TO OPERATIONS AND MAINTENACE TO SUBCLIN 7001AJ IN THE AMOUNT OF $6,768,000.00.
December 20, 2022P00244FUNDING ONLY ACTION+$2,014,051DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS TO OPERATIONS AND MAINTENACE TO SUBCLIN 7001AH IN THE AMOUNT OF $2,014,051.00 AND UPDATE CLAUSE EDAR 3452.232-72 LIMITATION OF GOVERNMENT OBLIGATION. JUN 2022.
December 16, 2022P00243SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$962,772DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS FOR CHANGE REQUEST (CR) 6407 FRESH START COMMUNICATION TO DEFAULTED BORROWERS.
December 1, 2022P00242OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS)THIS CONTRACT MODIFICATION ADDS EDAR CLAUSE 3452.232.72 - LIMITATION OF GOVERNMENT'S OBLIGATION, (JUN 2022) IS INTO SUBJECT CONTRACT.
November 17, 2022P00241FUNDING ONLY ACTION+$6,500,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDS OF $6,500,00.00 FOR OPERATIONS AND MAINTENANCE 11/20/22-12/20/22.
November 17, 2022P00240FUNDING ONLY ACTION+$50,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDS OF $50,000.00 FOR OPERATIONS AND MAINTENANCE FOR CR 5236 STOP COLLECTION MAILINGS
November 17, 2022P00239FUNDING ONLY ACTION+$200,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM- DMCS.THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDS OF $200,00.00 FOR OPERATIONS AND MAINTENANCE FOR CR 4753 CEMS BDD PROCESSING.
November 17, 2022P00238FUNDING ONLY ACTION+$200,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM - DMCS. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDS OF $200,000.00 FOR OPERATIONS AND MAINTENACE FOR CR 4280.
October 20, 2022P00237FUNDING ONLY ACTION−$71,718DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO CANCEL AND DEOBLIGATE FUNDS IN THE AMOUNT OF $71,718.06 FROM CR 6436, DMCS DRG TO REMAIN OPEN ON OCTOBER 9 AND 10 -COLUMBUS DAY WEEKEND.
October 14, 2022P00236SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$32,936DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE THE TOTAL FUNDS CR 6453, LD - OCTOBER SUNDAY HOURS,
October 14, 2022P00235SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$7,701DEBT MANAGEMENT AND COLLECTIONS SYSTEM, THE PURPOSE OF THIS MODIFICATION IS TO APPROVE COST PROPOSAL FOR CR 6437 AND OBLIGATED ADDITIONAL FUNDS.
October 13, 2022P00234FUNDING ONLY ACTION−$1,747,452DEBT MANAGEMENT AND COLLECTIONS SYSTEM, DMCS, THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FY22 FUNDS FROM OPERATIONS AND MAINTENANCE IN THE AMOUNT OF $1,747,452.34.
September 30, 2022P00233SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$62,424DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS FOR CR 6445, LD DMCS PAYMENT ACTIVITY FILE
September 30, 2022P00232FUNDING ONLY ACTION+$190,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE A BUDGET IN ADVANCE OF NEGOTIATIONS FOR CR 6437, LD-DEBT RELIEF OPERATION AND OVERSIGHT RESPONSE.
September 30, 2022P00231FUNDING ONLY ACTION+$1,151,817DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS. THE PURPOSE OF THIS MODIFICATION WAS TO ADD FUNDING TO CR 6391 FOR FIXED RATE ON-GOING CONTINUING SERVICES.
September 30, 2022P00230SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$90,235DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND FUND CHANGE REQUEST 6440, LD SERVICERS ACCEPTING OPT OUT REQUESTS FOR DEBT RELIEF.
September 30, 2022P00229SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$71,718DEBT MANAGEMENT AND COLLECTIONS SYSTEM - DMCS THE PURPOSE OF THIS MODIFICATION IS TO APPROVE THE CHANGE REQUEST 6436 DMCS DRG TO REMAIN OPEN FOR OCTOBER 9 AND OCTOBER 10 COLUMBUS DAY WEEKEND
September 30, 2022P00228FUNDING ONLY ACTION+$5,702,304DEBT MANAGEMENT AND COLLECTIONS SYSTEM - DMCS THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDS FOR NOVEMBER OPERATIONS AND MAINTENANCE OF THE DMCS.
September 30, 2022P00227SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$259,221DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE A SEPTEMBER 9, 2022 AUTHORITY TO PROCEED FOR CHANGE REQUEST 6391, LD SERVICER DISCHARGE REQUEST PROCESS.
September 15, 2022P00226SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$40,822DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS FOR CHANGE REQUEST 6323 DMCS DEFAULT CONTROL MAIL.
September 12, 2022P00225SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$212,499DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS FOR CHANGE REQUESTS 6365, BORROWER DEFENSE GROUP DISCHARGES.
September 8, 2022P00224SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$128,465DEBT MANAGEMENT COLLECTIONS SYSTEM CONTRACT. THE PURPOSE OF THIS MODIFICATION IS TO PLACE CHANGE REQUEST NO. 6365, FRESH START PLUS LOANS FROM GAS UNDER CONTRACT.
September 6, 2022P00223SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$87,341DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST 6312 FRESH START PLUS.
July 29, 2022P00222SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$113,629DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS).THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST 6237, UPDATE SCAF FILE TO INCLUDE ADDITIONAL DECOMMISSIONING SERVICERS CONSOLIDATION ADJUSTMENTS.
July 26, 2022P00221EXERCISE AN OPTION+$19,456,970DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD VII IN ACCORDANCE WITH FAR 52.217-9, OPTION TO EXTEND TERM OF THE CONTRACT WITH A PERIOD OF PERFORMANCE OF AUG 01, 2022, THROUGH JUL 31, 2023.
July 22, 2022P00220SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$729,824DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE THE FOLLOWING CHANGE REQUEST CR 6288, FRESH START FOR DMCS BORROWERS A PRESIDENTIAL INITIATIVE.
July 15, 2022P00219OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE THE FOLLOWING CHANGE REQUESTS (CRS)AT NO COST TO GOVERNMENT CRS 6223,6225,6229,6231,6232, 6235,6240,6247,6261,6276,6289,6295,6185,6320,6321,6316 AND CANCEL CRS 5984,6030,6070,6113,6307.
June 27, 2022P00218SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPEno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS).THE PURPOSE OF THIS MODIFICATION IS TO ADD FAR CLAUSE 52.222-55, MINIMUM WAGES UNDER EXECUTIVE ORDER 14026.
May 31, 2022P00217FUNDING ONLY ACTION+$14,000,000DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS).THIS MODIFICATION WILL PROVIDE ADDITIONAL FUNDS OF $14,000,000.00 FOR OPERATIONS AND MAINTENANCE.
May 4, 2022P00216FUNDING ONLY ACTION+$6,537,160DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THIS MODIFICATION WILL PROVIDE ADDITIONAL FUNDS OF $6,537,159.87 FOR DMCS OPERATIONS AND MAINTENANCE.
April 25, 2022P00215ENTITY ADDRESS CHANGEno moneyDEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS).THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO ISSUE AN ENTITY ADDRESS CHANGE TO CORRECT THE CONTRACTOR PHYSICAL ADDRESS FOR MAXIMUS FEDERAL TO READ 1600 TYSONS BLVD STE 300 MCLEAN VA 22102-4894.
April 1, 2022P00214FUNDING ONLY ACTION+$6,581,254DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THIS MODIFICATION WILL PROVIDE ADDITIONAL FUNDS OF $6,581,254.00 FOR DMCS OPERATIONS AND MAINTENANCE.
March 11, 2022P00213SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$146,373DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS ADD FUNDS TO CR 5462 CREDIT REPORTING CHANGES, AND APPROVE AT NO COST CRS 6148, 6092, 6189, 6197, 5689, 6181, AND 6035, 6158.
February 11, 2022P00212SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$1,753,654DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE THE CHANGE REQUEST 6120, DMCS ENABLEMENT OF BPO FUNCTIONALITY, AND OBLIGATE $1,753,654.40.
February 3, 2022P00211FUNDING ONLY ACTION+$6,785,790DEBT MANAGEMENT COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO PROVIDE ADDITIONAL O&M FUNDING IN THE AMOUNT OF $7,785,790.00.
February 1, 2022P00210FUNDING ONLY ACTION−$401,167DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS FROM CR 6051, CREDIT REPORTING OF TRANSFERRED LOAN IN THE AMOUNT OF $401,167.01
January 26, 2022S00003OTHER ADMINISTRATIVE ACTION−$157,601DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THIS SYSTEM MODIFICATION TO REMOVE $157,601.43 FROM CLIN 0002 FROM CPSS FOR FMSS BALANCE. FUNDS WERE EXPIRED FY19 AND REMOVED ON FMSS.
January 4, 2022P00209OTHER ADMINISTRATIVE ACTION−$166,168DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS IN THE AMOUNT OF $166,168.30 FROM CLIN 5003AE.
December 15, 2021P00208FUNDING ONLY ACTION+$3,200,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDS TO CR 5599, CARES ACT RESUME COLLECTION MAILINGS SECOND NOTICE).
December 2, 2021P00207FUNDING ONLY ACTION+$13,728,096DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING TO OPERATIONS AND MAINTENANCE FOR 01/01/22 - 02/28/22.
November 29, 2021P00206SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPEno moneyEO14042 DEBT MANAGEMENT COLLECTION SYSTEM (DMCS). PURPOSE OF THIS CONTRACT MODIFICATION IS TO INCORPORATE CLAUSE FAR 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS.
October 26, 2021P00205SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$113,981DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). TO OBLIGATE FUNDS AND APPROVE DMCS DME, CR 5462 CREDIT REPORTING CHANGES
October 22, 2021P00204FUNDING ONLY ACTION+$6,910,437DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) THE PURPOSE OF THIS MODIFICATION IS TO ADD O&M FUNDING.
October 20, 2021P00203SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$139,677DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS FOR CR 6037, SSA AUTOMATIC TPD DISCHARGE.
September 30, 2021P00202SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$401,167DEBT MANAGEMENT COLLECTION SERVICES (DMCS). APPROVE CR 6051, CREDIT REPORTING OF TRANSFERRED LOANS, MAXIMUS FINAL PRICE PROPOSAL, DATED SEPTEMBER 29, 2021, IN THE AMOUNT OF $401,167.01
September 28, 2021P00201FUNDING ONLY ACTION+$3,399,265DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) THE PURPOSE OF THIS MODIFICATION IS TO ADD O&M FUNDING.
August 25, 2021P00199SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$233,629DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). SUBJECT MODIFICATION APPROVES AND OBLIGATES FUNDS FOR CR 5938, DMCS REHAB SERVICER CHANGES.
August 24, 2021P00200FUNDING ONLY ACTION+$100,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). ADDITIONAL FUNDING OF $100,000 IS PROVIDED FOR CR 5669, CARES ACT AWG EMPLOYER OUTREACH.
August 16, 2021P00198OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS. THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO UPDATE THE WAGE DETERMINATION REVISIONS ISSUED IN RESPONSE TO THE GOVERNMENTS EXERCISE OF OPTION YEAR VI THROUGH CONTRACT MODIFICATION P00196.
August 3, 2021P00197SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$134,769DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS FOR CR 5903, DMCS OBTAIN BORROWER ADDRESSES FROM TREASURY.
July 28, 2021P00196EXERCISE AN OPTION+$22,612,327DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION YEAR PERIOD VI EFFECTIVE AUGUST 1,2021.
July 27, 2021P00195SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$1,251,422THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS FOR CR5859, REVISED SKIP TRACE FOR REFUNDS DUE UNDER THE CARES ACT.
July 16, 2021P00194SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$589,192DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS THE PURPOSE OF THIS MOD IS TO DOCUMENT THE AUTHORITY TO PROCEED, THE APPROVAL OF CR 5931,CARES ACT DMCS REVERSE DEFAULT GA LOANS, OBLIGATE FUNDS, UPDATE DELIVERABLES AND ADD SECURITY CLAUSE 3452.204 72.
July 8, 2021P00193FUNDING ONLY ACTION+$300,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS).THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDS TO CR 4280, BORROWER DEFENSE DISCHARGE - OTHER SPECIAL DISCHARGE INSTRUCTIONS.
June 24, 2021P00192FUNDING ONLY ACTION+$42,336DEBT MANAGEMENT AND COLLECTIONS SYSTEM THIS MODIFICATION ADDS FUNDS TO CR 5239, APPROVAL OF CHANGE REQUESTS AT NO COST TO FSA: CR 5780,5798,5805,5809,5820,5830,5835,5848,5849,5851,5857,5868,5701, 5854 AND CANCELS: CR 5720,5721,5800,5834,5840,5848.
June 8, 2021P00191FUNDING ONLY ACTION+$7,400,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR OPERATIONS AND MAINTENANCE FUNDS IN THE AMOUNT OF $7,400,000.00.
April 9, 2021P00190FUNDING ONLY ACTION+$14,600,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE OPERATIONS AND MAINTENANCE FUNDS IN THE AMOUNT OF $14,600,000.00.
April 7, 2021P00189FUNDING ONLY ACTION−$284,817DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS IN THE AMOUNT OF $284,816.52 FROM THE CONTRACT. FROM CARES ACT CR 5478, NATIONAL EMERGENCY 2020 STOP DEFAULT COLLECTION ACTIVITY CR 5669, CARES ACT AWG EMPLOYER OUTREACH
February 26, 2021P00188FUNDING ONLY ACTION+$7,326,345DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE OPERATIONS AND MAINTENANCE FUNDS IN THE AMOUNT OF $7,326,344.58.
February 23, 2021P00187FUNDING ONLY ACTION−$36,575DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FY18 AND FY19 FUNDS IN THE AMOUNT OF $29,534.22 FROM CR 4379-BORROWER DEFENSE ADJUSTMENTS PHASE 1 AND $7,041.01 FROM CR 4841, BDD CLEANUP.
February 17, 2021P00186FUNDING ONLY ACTION+$7,483,946DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO OPERATIONS AND MAINTENANCE IN THE AMOUNT OF $7,323945.76 AND $157,601.42 ADDITIONAL FUNDS FOR CR 2600,PROACTIVELY MANAGE CREDIT BALANCES AND CR 2496,OUTGOING SERVICER ADJUSTMENTS.
January 20, 2021P00185FUNDING ONLY ACTION+$7,323,946DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS FOR OPERATIONS AND MAINTENANCE IN THE AMOUNT OF $7,323,945.76.
December 7, 2020P00184SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$196,036TO APPROVE CHANGE REQUEST CR 5688, INSTALLATION OF BLAZE RMA FOR DEBT MANAGER, DATED NOVEMBER 6, 2020, IN THE AMOUNT $196, 036.31.
September 25, 2020P00183FUNDING ONLY ACTION+$7,607,102DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING FOR OPERATIONS AND MAINTENANCE FROM DECEMBER 31, 2020 TO JANUARY 31, 2021.
September 21, 2020P00182SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$157,343DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS FOR CR 5669 CARES ACT AWG EMPLOYER OUTREACH. TO APPROVE AT NO COST CR 5649 CARES ACT REHABILITATION ELIGIBILITY FOR PAYING BORROWERS AND CR 5656 CARES ACT REHABILITATION EXTENSION. PLUS CANCEL CR 5462 CREDIT REPORTING CHANGES.
September 1, 2020P00181FUNDING ONLY ACTION+$300,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDS TO CR 4280, BORROWER DEFENSE DISCHARGE: OTHER DISCHARGE/SPECIAL INSTRUCTIONS.
September 1, 2020P00180FUNDING ONLY ACTION+$5,379,622DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS).THE PURPOSE OF THIS MODIFICATION IS TO ADD OPERATIONS AND MAINTENANCE FUNDING TO THE DMCS CONTRACT THROUGH DECEMBER 31, 2020.
August 19, 2020P00179OTHER ADMINISTRATIVE ACTION−$5,137,266DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS IN THE AMOUNT OF $5,137,265.78 FROM THE CONTRACT.
August 13, 2020P00178SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$45,864DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS).THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING TO CR 4859, IMMINENT DANGER PAY AND HOSTILE FIRE PAY AND DMCS SCRA PROCESSING OF BENEFITS.
August 10, 2020P00177SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$113,594DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST (CR) 5587 CARES TOP INACTIVATION OF VOLUNTARY PAYERS.
August 10, 2020P00176SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$3,261,207DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS).THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST (CR) 5599, CARES ACT RESUME COLLECTION MAILINGS IN THE AMOUNT OF $3,261,207.00.
July 30, 2020P00175FUNDING ONLY ACTION+$600,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING TO THE CHANGE REQUESTS CR 4753, CUSTOMER ENGAGEMENT SYSTEMS (CEMS) BORROWER DEFENSE ENHANCEMENTS IMPACTING SERVICERS, CR 4619, BDD STOP COLLECTION, AND CR 4280, BORROWER DEFENSE DISCHARGE: OTHER DISCHARGE-SPECIAL INSTRUCTIONS.
July 30, 2020P00174SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$281,239DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS FOR CHANGE REQUESTS CR 5239, AUTOMATE COLLECTION SUSPENSIONS ON BORROWER DEFENSE ACCOUNTS.
July 24, 2020P00173EXERCISE AN OPTION+$32,371,622DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD V.
July 21, 2020P00172SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPEno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS.THE PURPOSE OF THIS MODIFICATION IS TO AMEND FAR CLAUSE 52.204 25, APPROVE FIVE CHANGE REQUESTS AT NO COST TO THE GOVERNMENT AND CANCEL TWO CHANGE REQUESTS.
June 9, 2020P00171FUNDING ONLY ACTION+$15,000,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS. THE PURPOSE OF THIS MODIFICATION IS ADD FUNDS TO MONTHLY OPERATIONS AND MAINTENANCE, AUTHORITY TO PROCEED CHANGE TO ADD AN ADDITIONAL CERTIFIED LETTER MAILING UNDER CR5478, CARES ACT AND TO CANCEL CR 5268, PEPS RE-PLATFORM SCHOOL FILE INTERFACE TESTING.
May 29, 2020P00170SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$300,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM - DMCS. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDS FOR CHANGE REQUEST CR 4753, CEMS BORROWER DEFENSE ENHANCEMENTS IMPACTING SERVICERS, CR 4280, BORROWER DEFENSE DISCHARGE AND CR 4619, BDD STOP COLLECTION.
May 13, 2020P00169SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$257,134DEBT MANAGEMENT AND COLLECTIONS SYSTEM - DMCS. THE PURPOSE OF THIS MODIFICATION IS TO MAKE CHANGES TO DELIVERABLES AND CREATE A THIRD LETTER MAILING TO EMPLOYERS WHO CONTINUE TO GARNISH BORROWER WAGES UNDER CHANGE REQUEST CR 5478, NATIONAL EMERGENCY 2020 - STOP DEFAULT COLLECTION ACTIVITY.
May 11, 2020P00168FUNDING ONLY ACTION+$410,689DEBT MANAGEMENT AND COLLECTIONS SYSTEM-DMCS.THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDS OF $410,688.75 FOR 547,585 CARES ACT LETTERS.
April 29, 2020P00167SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$130,775DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS FOR CHANGE REQUEST 5530 IN SUPPORT OF THE CARES ACT.
April 27, 2020P00166FUNDING ONLY ACTION+$7,560,521DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS.THE PURPOSE OF THIS MODIFICATION IS OBLIGATE COVID- 19 CHANGE REQUESTS FUNDS WITH THE CORRECT FINANCIAL APPROPRIATION DATA. CR 5478, NATIONAL EMERGENCY 2020-STOP COLLECTION ACTIVITY CR 5510, CARES ACT MAILING CR, SMALL BUSINESS SUBCONTRACTOR SUPPORT FOR BORROWERS INQUIRIES
April 24, 2020P00165FUNDING ONLY ACTION−$7,560,521THE PURPOSE OF THIS MODIFICATION IS DE-OBLIGATE COVID-9 CHANGE REQUESTS FUNDS DUE TO INCORRECT FINANCIAL CODING FOR THE CHANGE REQUEST CR 5478 NATIONAL EMERGENCY 2020-STOP COLLECTION ACTIVITY,CR 5510, CARES ACT MAILING AND CONTRACT MODIFICATIONS P00159 AND P00160.
April 14, 2020P00164SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$2,390,400DEBT MANAGEMENT AND COLLECTIONS SYSTEM - DMCS. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBILGATE FUNDS FOR SMALL BUSINESS SUBCONTRACTOR SUPPORT FOR BORROWERS INQUIRIES ABOUT COVID-19 RELIEF MEASURES.
April 14, 2020P00163SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$83,066DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUESTS 5359, REPORT LATEST DATE OF DELINQUENCY FOR TOP CERTIFICATIONS, AND OBLIGATE FUNDS FOR THIS CR.
April 9, 2020P00162SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$3,309,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST 5510 CARES ACT MAILING AND OBLIGATE FUNDS TO CR. PLUS, APPROVE THE FOLLOWING CHANGE REQUESTS AT NO ADDITIONAL COST TO THE GOVERNMENT: CR 5384, REPLACING DUNS WITH UNIQUE ENTITY IDENTIFIER CR 5511, PAY.GOV 7.12 AVAILABLE FOR AGENCY TESTING
April 9, 2020P00161DEFINITIZE CHANGE ORDER+$1,361,121DEBT MANAGEMENT AND COLLECTIONS SYSTEM - DMCS. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE, DEFINITIZE NEGOTIATIONS, AND OBLIGATE FUNDS FOR CHANGE REQUESTS 5478, NATIONAL EMERGENCY 2020 - STOP DEFAULT COLLECTION ACTIVITY.
April 7, 2020P00160FUNDING ONLY ACTION+$15,000,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR MONTHLY OPERATIONS AND MAINTENANCE THROUGH MAY 2020.
April 6, 2020P00159CHANGE ORDER+$500,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF MODIFICATION P00159 IS TO ISSUE A CHANGE ORDER DUE TO THE CORONA VIRUS PANDEMIC COVID-19 NATIONAL EMERGENCY FOR CHANGE REQUEST CR 5478 NATIONAL EMERGENCY 2020 STOP DEFAULT COLLECTION ACTIVITY IN AN AMOUNT NOT TO EXCEED $500,000.
April 2, 2020P00158FUNDING ONLY ACTION+$200,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDS TO CR 4753 AND CR 4619 PLUS APPROVE CHANGE REQUEST CR 5472, NOTIFICATION OF LAWSUIT IMPACTING ED HELD ASSETS NOT RELATED TO BANKRUPTCY, AT NO ADDITIONAL COST TO GOVERNMENT.
March 23, 2020P00157SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$32,770DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND FUND THE CHANGE REQUEST (CR) 5379, BD FSA SERVICER DATA REQUESTS AND REPORTING IN THE AMOUNT OF $32,770.29.
March 23, 2020P00156SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$164,376DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND FUNDS CHANGE REQUEST (CR) 5274, SCRA LETTERS IN THE TOTAL AMOUNT OF $164,375.59. PLUS APPROVE THE FOLLOWING CR AT NO COST TO GOVERNMENT CR 5475, NATIONAL EMERGENCY 0.00% INTEREST AND CANCEL CR 5392, REVISED NEXT GEN FSA DCC DIGITAL PLATFORM RELEASE 3.0
March 20, 2020P00155FUNDING ONLY ACTION−$239,649DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDS IN THE TOTAL AMOUNT OF $239,649.33 FROM CONTRACT LINE ITEMS 0025 ($33,443.07), 0043 ($10,918.00), 0063 ($23,153.40), 0068 ($3,363.11), AND 0099 ($168,771.75).
March 12, 2020P00154SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$7,059DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST, CR 5341, QUERO TCI CLOSED SCHOOL DISCHARGE SETTLEMENT.
March 12, 2020P00153SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$207,872DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUESTS CR 5363 - OUTREACH TO EMPLOYERS WHO IGNORE STOP GARNISHMENT NOTICE CR 5426, HHS POVERTY GUIDELINES UPDATE-2020 CR 5428, IMPROVE DISCHARGE SCREEN CR 5330, IMPROVE DISCHARGE SCREEN AND CANCEL CR 5392, REVISED - NEXT GEN FSA- DCC DIGITAL PLATFORM RELEASE.
March 12, 2020P00152SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$151,070DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST 5273, QUARTERLY TPD REVIEW AND REMOVE NON-FINANCIAL METRIC 3-CUSTOMER SATISFACTION FROM THE DMCS PERFORMANCE METRICS PLAN EFFECTIVE PRIOR 2017-2018.
March 6, 2020P00151OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO UPDATE AND ADD DEPARTMENT OF EDUCATION CYBER AND PERSONNEL SECURITY CLAUSES TO BE IN COMPLIANCE WITH LAWS AND REGULATIONS.
March 6, 2020P00150OTHER ADMINISTRATIVE ACTIONno moneyCORRECT THE CONTRACT LINE ITEM NUMBERING (CLIN) NUMBERING FOR CONTRACT MODIFICATION P00149. CLIN 4001 IS REPLACED BY CLIN 4004 TO REFLECT ADDITIONAL OPERATIONS AND MAINTENANCE (O&M)FUNDING FOR CR 4753 AND CR 4619.
February 7, 2020P00149FUNDING ONLY ACTION+$200,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING TO OPERATIONS AND MAINTENANCE FOR CR 4619 AND 4753 AND TO APPROVE THE FOLLOWING CHANGE REQUESTS AT NO ADDITIONAL COST TO FSA. CR 5343, TPD/DMCS DUPLICATE ADJUSTMENTS - DMCS REQUIREMENTS FOR PREVIOUS CR 5144 CR 5351, FY20 - FINANCIAL AUDIT HANDOUTS CR 5375, UPDATE CONNECTIONS WITH PCA RELIANT INC CR 5349, RESUME SENDING CAIVRS FILE TO HUD CR 5323, TREASURY OFFSETS OF SERVICER REFUNDS
January 30, 2020P00148FUNDING ONLY ACTION+$20,000,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDS IN THE AMOUNT $20,000,000.00 FOR CONTRACT LINE ITEM (CLIN) 0001, DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS AND MAINTENANCE.
December 23, 2019P00147OTHER ADMINISTRATIVE ACTION+$7,800,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS. THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR MONTHLY OPERATIONS AND MAINTENANCE TO SERVICE BORROWER ACCOUNTS AND APPROVE THE FOLLOWING CHANGE REQUESTS (CR) AT NO COST TO GOVERNMENT: CR 5307, DMCS TO USE EFT SERVER FOR FILE TRANSMISSION WITH TREASURY CR 5334, NEW CONNECTIONS FOR PCA CREDIT ADJUSTMENTS, INC. ALSO, TO DOCUMENT CANCELLATION OF CR 5048, VIRTUALIZE THE FSA DATABASE PLATFORM
December 4, 2019P00146OTHER ADMINISTRATIVE ACTIONno moneyTHE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO IMPLEMENT THE REQUIREMENTS OF FAR SUBPART 4.10 FOR THE UNIFORM USE OF CONTRACT LINE ITEMS (CLINS) AND SUBCONTRACT LINE ITEMS (SUBCLINS).
November 15, 2019P00145FUNDING ONLY ACTION+$200,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDS TO OPERATIONS AND MAINTENANCE FOR CHANGE REQUEST (CR) 4619 BDD STOP COLLECTION AND CR 4753 CUSTOMER ENGAGEMENT SYSTEMS CEMS BORROWER DEFENSE ENHANCEMENTS IMPACTING SERVICERS.
November 15, 2019P00144SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$246,840DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) - THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST (CR) 5198, REMOVE SOCIAL SECURITY NUMBER FROM TREASURY OFFSET PROGRAM DEBT NUMBER. APPROVE CHANGE REQUESTS CR 5296 - DMCS ESCHEATMENT/UNESCHEATMENT CHANGE, CR 5307 - DMCS TO USE EFT SERVER FOR FILE TRANSMISSION WITH TREASURY, CR 5327 - NATIONAL RECOVERIES INC. ISP AND VPN CONNECTION CHANGES TO DMCS AT NO ADDITIONAL COST TO THE GOVERNMENT. CANCEL CR 5297 DMCS ESCHEATMENT TRANSACTIONS TO FMS.
September 18, 2019P00142SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$450,387DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUESTS (CR)5170, CORE SYSTEM ROADMAP 2019-4 CLOSED TO ARCHIVE FOR $450,387.26 AND CR 5238, REQUIRE DOCUMENTATION FOR ALL NAME CHANGES, AT NO ADDITIONAL COST TO FSA.
August 30, 2019P00141OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCES FOR CR 4810, POAM INSIDER THREAT MECHANISMS,CR 4811, POAM PIVI AND SERVICE ACCOUNT ACCESS CR 4812, POAM AUDIT LOG MONITORING, TO 07/31/20.
August 27, 2019P00140OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO IMPLEMENT FAR CASE 2018-17 BY INCORPORATING FAR CLAUSE 52.204-25 AUG 2019, PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT AND TO UPDATE THE WAGE DETERMINATION FOR DUVAL COUNTY, FLORIDA (2015-4539), TO REVISION 9.
August 6, 2019P00139FUNDING ONLY ACTION+$200,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDS OF $200,000.00 FOR TWO CONTRACT CHANGE REQUESTS (CR): CR 4619, BDD STOP COLLECTION AND CR 4753, CUSTOMER ENGAGEMENT SYSTEMS BORROWER DEFENSE ENHANCEMENTS IMPACTING SERVICERS.
July 31, 2019P00138OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE DEFAULT BORROWER RATE FROM CONTRACT MODIFICATION NO. P00136 FOR OPTION PERIOD IV FROM $0.95 TO $0.96 AND TO NOTE PREVIOUSLY APPROVED CHANGE REQUESTS (CRS) WITH PERIODS OF PERFORMANCE THAT WERE EXPIRED ON 7/31/19 AND ARE NOW EXTENDED INTO OPTION YEAR IV WITH EXPIRATION OF 7/31/20.
July 26, 2019P00137OTHER ADMINISTRATIVE ACTION+$62,642DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS FOR OPTION YEAR IV PERSONAL IDENTITY VERIFICATION AND TO APPROVE VARIOUS CHANGE REQUESTS AT NO COST TO FSA.
July 26, 2019P00136EXERCISE AN OPTION+$37,630,000DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD IV AND TO PROVIDE FUNDING FOR OPERATIONS AND MAINTENANCE.
June 18, 2019P00135SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$64,880DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST CR 5001, AUTOMATED CLOSED SCHOOL DISCHARGE DATA PROVIDER NOTIFICATION.
June 13, 2019P00134SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$104,100DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS).THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST CR 5000, AUTOMATED CLOSE SCHOOL DISCHARGE NSLDS REPORTING.
June 12, 2019P00133OTHER ADMINISTRATIVE ACTION−$6,718DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS DE-OBLIGATE THE FY18 FUNDS IN THE AMOUNT OF $6,717.83 FROM LINE ITEM 0060 AND TO UPDATE KEY PERSONNEL.
June 7, 2019P00132SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$19,296DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST (CR) 5152, MAILINGS TO BORROWERS RECALLED FROM FIVE AWARD TERM EXTENSION PRIVATE COLLECTION AGENCIES AND OBLIGATE FUNDS $19,295.67.
May 31, 2019P00131FUNDING ONLY ACTION+$80,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING FOR CHANGE REQUEST (CR) 4619, BORROWER DEFENSE STOPPED COLLECTIONS AND CR 4753,CUSTOMER ENGAGEMENT SYSTEMS (CEMS) BORROWER DEFENSE ENHANCEMENTS IMPACTING SERVICERS.
May 6, 2019P00130FUNDING ONLY ACTION+$19,500,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS AND MAINTENANCE AND TO APPROVE THE FOLLOWING CHANGE REQUESTS AT NO ADDITIONAL COST TO FSA: CR 5049, UPGRADES TO MEET DM 10.2 AND 11.1 PLATFORM REQUIREMENTS AND CR 5091, CLOSED SCHOOL-EXCEPTIONAL CIRCUMSTANCES-GLOBE UNIVERSITY AND MINNESOTA SCHOOL OF BUSINESS. ALSO TO DOCUMENT THE CANCELLATION OF THE FOLLOWING CHANGE ORDERS: CR 2647, FOS-LAST DISBURSEMENT DATE/REQ 16, CR 4761, NEW IP ADDRESS FOR WINDHAM IA REQUEST, CR 4900, CANCER TREATMENT DEFERMENT CR 5058, FSA DOWNLOAD TRANSITION TO IFAP -NAME/URL UPDATES AND POSTING REQUEST PROCESS.
April 19, 2019P00129SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$622,225DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE THE FOLLOWING CHANGE REQUEST: CR 4859 IMMINENT DANGER PAY AND HOSTILE FIRE PAY AND CR 4947 DMCS SCRA PROCESSING OF BENEFITS
April 8, 2019P00128FUNDING ONLY ACTION+$7,230,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING TO OPERATIONS AND MAINTENANCE FOR THE MONTH OF APRIL 2019.
March 14, 2019P00127FUNDING ONLY ACTION+$200,000DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING FOR CR 4753, CUSTOMER ENGAGEMENT SYSTEMS (CEMS) BORROWER DEFENSE ENHANCEMENTS IMPACTING SERVICERS AND CR 4691, BDD STOP COLLECTION.
February 28, 2019P00126FUNDING ONLY ACTION+$80,000DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING, $80,000.00 FOR CONTRACT LINE ITEM (CLIN) 0001, DEBT MANAGEMENT AND COLLECTIONS SYSTEM OPERATIONS AND MAINTENANCE.
February 22, 2019P00125SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$16,403DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO CANCEL CR 4902, ANALYSIS OF RECORDS MANAGEMENT AND PRESERVATION AND APPROVE THE FOLLOWING CHANGE REQUESTS(CRS): 4941, TPD LHN INVOICE FILE($16,402.55) 4982, POAM 35387 FY18 DHS SAR DM ARCHIVING (NO COST) 4996, ACCEPTING PLASTIC DEBIT/PREPAID CARD PAYMENT VIA THE IVRU (NO COST) 4881, STOP APPLYING TAG (NO COST)
February 14, 2019P00124OTHER ADMINISTRATIVE ACTION+$208,408DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE APPROVAL CR 4869 AND OBLIGATE $208,408.32 FOR THIS CR. ALSO,TO DOCUMENT THE APPROVAL OF CR 5008, 3657, 4876 AT NO COST TO FSA AND THE CANCELLATION OF CR 4985 AND 4909.
February 14, 2019P00123FUNDING ONLY ACTION+$13,650,000DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE OPERATIONS AND MAINTENANCE FUNDS IN THE AMOUNT OF $13,650,000.00.
January 25, 2019P00122OTHER ADMINISTRATIVE ACTION+$118,512DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND OBLIGATE FUNDS OF $118,512.12 FOR CR 4892,REVISE CREDIT REFORM CODE (CRC) EDITS FOR FFEL CONSOLIDATION LOAN AND CR 4899, CRC RISK CATEGORY ALSO, DOCUMENTING CORRECTION ON MOD P00117 CR4812, POAM AUDIT LOG MONITORING, ITEM 14C, PERIOD OF PERFORMANCE TO READ JANUARY 29, 2019 THROUGH JULY 31, 2019 AND ON MOD P00120 THE TOTAL AMOUNT OF FUNDS AVAILABLE FOR CR 4619, BORROWER DEFENSE STOPPED COLLECTIONS, TO READ $134,664.00.
January 15, 2019P00143OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE THE FOLLOWING CHANGE REQUESTS (CRS)AT NO COST TO FSA: CR 5268, PEPS RE-PLATFORM SCHOOL FILE INTERFACE TESTING CR 4606, RETIRE PCA PARTNER AREA OF MYEDDEBT.ED.GOV SITE CR 5277, THIRD PARTY AUTHORIZATION FORM CR 5278, MODIFY CONNECT: DIRECT FOR FH CANN CR 5282, INCREASE TOLERANCE ON ACCOUNT BALANCE RECONSTRUCTIONS CR 5295, CHANGE SALUTATION IN WG21 NOTICE CR 5265, TRANSITION NEW JERSEY HIGHER EDUCATION STUDENT ASSISTANCE AUTHORITY (NJHESAA) TO KENTUCKY HIGHER EDUCATION ASSISTANCE AUTHORITY (KHEAA) CR 5254, TRANSITION FINANCE AUTHORITY OF MAINE (FAME) TO EDUCATION CREDIT MANAGEMENT (ECMC)
December 27, 2018P00121OTHER ADMINISTRATIVE ACTION+$168,772DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CR 4797 AND TO OBLIGATE FUNDS OF $168,771.75 FOR CR 4797.
December 27, 2018P00120FUNDING ONLY ACTION+$150,000DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS OF $75,000 TO CR 4753 AND $75,000 TO CR 4619.
December 21, 2018P00119FUNDING ONLY ACTION+$7,300,000DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE OPERATIONS AND MAINTENANCE FUNDS IN THE AMOUNT OF $7,300,000.00.
December 21, 2018P00118OTHER ADMINISTRATIVE ACTION+$197,045DEBT MANAGEMENT AND COLLECTION SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDS OF $197, 044.61 FOR CR 4841, AND TO DOCUMENT THE CANCELLATION OF CR 2849, DMCS LETTER ACCESS, EFFECTIVE DECEMBER 13, 2018.
December 14, 2018P00117SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$895,338DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE POAM CR 4810, 4812,DOCUMENT REVISED PROPOSAL FOR CR 4841 RECEIVED AND ACCEPTED ON NOVEMBER 16, 2018 AND TO OBLIGATE $895,338.27 IN FUNDS.
November 27, 2018P00116OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CR 4876 AND 4884, CHANGE PERFORMANCE DATE ON CR 4636, AND CANCEL CR 4558, 4813, 4823, 4857, 4109, 4727.
October 3, 2018P00115OTHER ADMINISTRATIVE ACTIONno moneyTHE PURPOSE OF THIS MODIFICATION IS TO APPROVE CR 4757L AND CR4870 AND CANCEL CR 4086.
September 26, 2018P00114FUNDING ONLY ACTION+$200,000THE PURPOSE OF MODIFICATION P00114 IS TO PROVIDE ADDITIONAL FUNDING FOR CR 4757, CEASE RETRO ADJUSTMENTS. THE TOTAL AMOUNT OBLIGATED WILL INCREASE BY $200,000.00 FROM $361,133,072.80 TO $361,333,072.80.
September 26, 2018P00113SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$144,000THE PURPOSE OF MODIFICATION P00113 IS TO PROVIDE ADDITIONAL FUNDING FOR CR 4280 AND CR 4619 AND TO DOCUMENT THE APPROVAL OF CR 4841.
September 25, 2018P00112SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$102,578HE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE APPROVAL OF MAXIMUS FEDERAL SERVICES PRICE PROPOSAL VERSION 1.0 DATED SEPTEMBER 7, 2018 FOR CR 4561, TPD AND DEATH 1099-C REQUIREMENT REVISION.
September 20, 2018P00111OTHER ADMINISTRATIVE ACTIONno moneyTHE PURPOSE OF THIS MODIFICATION IS TO APPROVE CR 4852,CR 4806, CR 4627 AND CR 4788;CANCEL CR 2834, CR 2574 AND CR 4787 PLUS UPDATE SECURITY CLAUSES.
September 6, 2018P00110SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$61,438THE PURPOSE OF THIS MODIFICATION IS TO APPROVE PRICE PROPOSAL FOR CHANGE REQUEST(CR)4753 - CEMS BORROWER DEFENSE ENHANCEMENTS IMPACTING SERVICERS IN THE AMOUNT OF $61,437.65 FOR THE FIRST THREE MONTHS OF CONTRACT YEAR AUGUST 2018 THRU JULY 2019.
August 30, 2018P00109SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$226,427DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND ADD FUNDING FOR CHANGE REQUEST (CR) 4636, LOAN HOLDER NOTIFICATION PHASE 1 IN THE AMOUNT OF $226,426.76.
August 15, 2018P00108SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$170,087THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR CHANGE REQUEST (CR) 2474, IMPROVE SSN CHANGE FUNCTIONALITY REQ. 106 IN THE AMOUNT OF $170,087.48.
July 26, 2018P00107EXERCISE AN OPTION+$36,116,768THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD III, TO PROVIDE FUNDING FOR OPERATIONS AND MAINTENANCE CLIN 0001, AND TO EXERCISE THE OPTIONS FOR PIV-I YEAR 3.
July 25, 2018P00106OTHER ADMINISTRATIVE ACTIONno moneyTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE FSA 39-7 CONTRACTOR SECURITY RESPONSIBILITIES(AUG 2018),FSA 39-8 SUPPLEMENTAL INSTRUCTIONS TO EDAR 3452.239-72, DEPARTMENT SECURITY REQUIREMENTS (JULY 2018)AND REVISED CONTRACT DELIVERABLES.
June 22, 2018P00105SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$131,806THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR CHANGE REQUEST (CR) 4598 - NEW CONSOLIDATION ELVC IN THE AMOUNT OF $131,805.67.
June 19, 2018P00104FUNDING ONLY ACTION+$6,500,000THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $6,500,000.00 TO CLIN 0001 OPERATIONS AND MAINTENANCE.
June 11, 2018P00103SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$6,694THE PURPOSE OF THIS MODIFICATION IS TO ADD AN INTERFACE CONTROL DOCUMENT (ICD) TO PREVIOUSLY APPROVED CHANGE REQUEST 4362 (DMCS LOCKBOX CHANGEOVER)IN THE AMOUNT OF $6,693.60.
May 18, 2018P00102FUNDING ONLY ACTION+$6,500,000THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $6,500,000.00 TO CLIN 0001 OPERATIONS AND MAINTENANCE.
May 16, 2018P00101FUNDING ONLY ACTION+$160,000THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING FOR CHANGE REQUEST (CR) 4280 - BORROWER DEFENSE DISCHARGE/SPECIAL INSTRUCTIONS IN THE AMOUNT OF $160,000.00.
April 27, 2018P00100SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$29,664THE PURPOSE OF THIS MODIFICATION IS TO APPROVE FUNDING FOR CHANGE REQUEST 4619 BORROWERS DEFENSE STOPPED COLLECTIONS DATED APRIL 20, 2018 IN THE AMOUNT OF $29,664.00.
April 16, 2018P00099FUNDING ONLY ACTION+$7,400,000THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO CLIN 0001 OPERATIONS AND MAINTENANCE.
March 26, 2018P00098SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$263,880THE PURPOSE OF THIS MODIFICATION IS TO APPROVE FUNDING FOR CHANGE REQUEST(CR) 3944, PASSWORD POLICY AND PROCEDURE UPDATE, VERSION 2 DATED MARCH 14, 2018 IN THE AMOUNT OF $263,880.41.
March 16, 2018P00097FUNDING ONLY ACTION+$7,300,000THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO CLIN 0001 OPERATIONS AND MAINTENANCE.
March 16, 2018P00096FUNDING ONLY ACTION+$60,000THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING FOR CHANGE REQUEST (CR) 4280 - BORROWER DEFENSE DISCHARGE/SPECIAL INSTRUCTIONS IN THE AMOUNT OF $60,000.00.
March 2, 2018P00095FUNDING ONLY ACTION+$7,200,000THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO CLIN 0001 OPERATIONS AND MAINTENANCE.
February 15, 2018P00094OTHER ADMINISTRATIVE ACTIONno moneyTHE PURPOSE OF THIS MODIFICATION IS TO ADD CONTRACTING OFFICERS AND CONTRACT SPECIALISTS TO THIS CONTRACT.
January 31, 2018P00093OTHER ADMINISTRATIVE ACTION+$7,129,071IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND FUND CHANGE REQUEST(CR) 4362 - DMCS LOCKBOX CHANGEOVER. THE PURPOSE OF THIS CR IS TO ACCOMMODATE THE U.S. TREASURY DEPARTMENT'S CHANGE FROM BANK OF AMERICA TO US BANK AS THE LOCKBOX VENDOR THAT WILL BE USED TO PROCESS CHECK PAYMENTS. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO CLIN 0001 OPERATIONS AND MAINTENANCE. THIS MODIFICATION ALSO DOCUMENTS THE APPROVAL OF NO COST CRS 4422, 4469, 4486, 4507, 4544, AND 4345. IT ALSO CHANGES THE STATUS OF CR 3902 FROM APPROVED TO ON HOLD. THIS MODIFICATION ALSO CHANGES THE CO FROM MURTHLYN ALDRIDGE TO PATTY QUEEN-HARPER.
December 20, 2017P00092OTHER ADMINISTRATIVE ACTION+$7,300,000IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING TO CLIN 0001 OPERATION AND MAINTENANCE, AND TO REPLACE LOCAL CLAUSE FSA 32-2 WITH FSA 32-3.
December 20, 2017P00091SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$302,057IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CR 4280 BORROWER DEFENSE DISCHARGE: OTHER DISCHARGE/SPECIAL INSTRUCTIONS, CR 3984 RESTRICT PCA REPORT BUILDER CAPABILITIES, AND UPDATE THE PRICE PROPOSAL FOR CR 3568. THE PURPOSE OF CR 4280 IS THAT FSA HAS A NEED FOR SERVICERS TO PROCESS BORROWER DEFENSE DISCHARGES AND/OR SPECIAL INSTRUCTIONS ON BORROWERS IN PROCESS OF A BORROWER DEFENSE REVIEW/DISCHARGE. SOME WILL REQUIRE DIFFERENT PROCESSING THAN WHAT HAS BEEN DONE TO DATE. THE PURPOSE FOR CR 3984 IS TO PREVENT PCAS FROM GETTING ACCESS TO INFORMATION ABOUT BORROWERS THAT ARE NOT ASSIGNED TO THEM, WHO ARE IN DMCS. THIS WAS PART OF A SECURITY FINDING, AND THE CR WILL CLOSE THIS LOOPHOLE. THE PURPOSE OF THE UPDATE OF THE PRICE PROPOSAL OF CR 3568 IS TO CHANGE THE POST-IMPLEMENTATION VALIDATION PERIOD FROM 60 DAYS TO 90 DAYS. THIS MODIFICATION ALSO DOCUMENTS THE APPROVAL OF THE FOLLOWING NO COST CRS: 4416 ESIR REPLACEMENT, 4389 INELIGIBLE BORROWER PROCEDURAL CHANGES, 4429 MODIFY MONTHLY DMCS REPORTS, 4170 QUARTERLY FISMA REPORTING METRICS FOR CONTRACTORS, AND 4215 WEB APPLICATION SURVEILLANCE (WAS) PROGRAM. THIS ALSO DOCUMENTS THE ISSUANCE OF 400 VERSIGN ID PROTECTION PERSONAL IDENTITY VERIFICATION TOKENS TO MAXIMUS.
November 29, 2017P00090OTHER ADMINISTRATIVE ACTION+$29,664IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND FUND CHANGE REQUEST (CR) 4379 - BORROWER DEFENSE DISCHARGE ADJUSTMENTS (PHASE 1). THE PURPOSE OF CR 4379 IS TO ADJUST THE INTEREST ON LOANS FOR BORROWERS WHO HAVE FILED A BORROWER DEFENSE DISCHARGE (BDD) CLAIM.
November 22, 2017P00089OTHER ADMINISTRATIVE ACTION+$87,861IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND FUND CHANGE REQUEST(CR) 4362 - DMCS LOCKBOX CHANGEOVER. THE PURPOSE OF THIS CR IS TO ACCOMMODATE THE U.S. TREASURY DEPARTMENT'S CHANGE FROM BANK OF AMERICA TO US BANK AS THE LOCKBOX VENDOR THAT WILL BE USED TO PROCESS CHECK PAYMENTS.
November 15, 2017P00088OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF CRITICAL FUNCTION. OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE KEY PERSONNEL CHANGES FOR THE FOLLOWING POSITIONS: - PROGRAM MANAGER - SYSTEMS DEVELOPMENT/ INTEGRATION DIRECTOR
November 15, 2017P00087OTHER ADMINISTRATIVE ACTION+$300,395IGF::CT::IGF CRITICAL FUNCTION. OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND FUND CHANGE REQUEST 4174 - BORROWER DEFENSE - IRS REPORTING UPDATES. THIS CR REQUIRES THE BORROWER DEFENSE DISCHARGES FOR CERTAIN SCHOOLS SHOULD NOT RESULT IN THE DISCHARGE BEING CONSIDERED TAXABLE INCOME AND THEREFORE THE BORROWER AND THE IRS SHOULD NOT RECEIVE A FORM 1099 RELATED TO THE DISCHARGE.
November 15, 2017P00086OTHER ADMINISTRATIVE ACTION+$102,371IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND FUND CHANGE REQUEST (CR) 4375 - COMPLIANCE WITH SETTLEMENT IN SALAZAR V. DEVOS. THE PURPOSE OF THIS CR IS TO REQUIRE THE CONTRACTOR TO MAIL TO CLASS MEMBERS THE CURRENT ATB DISCHARGE APPLICATION BY NO LATER THAN DECEMBER 9, 2017.
October 31, 2017P00085OTHER ADMINISTRATIVE ACTION−$1,105,853IGF::CT::IGF CRITICAL FUNCTION. OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS DE-OBLIGATE FUNDING UNDER LINE ITEM 0002 - DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) DEVELOPMENT AND UPGRADES AND DOCUMENT THE APPROVAL OF CHANGE REQUEST (CR) 4347 DIRECT LOAN PAPER MPN/PROMISSORY NOTE IMAGES AVAILABLE VIA COD WEB. ALL DIRECT LOAN PROMISSORY NOTE IMAGES (DIRECT SUBSIDIZED LOAN, DIRECT UNSUBSIDIZED LOAN, AND DIRECT PLUS LOAN, INCLUDING THE ENDORSER ADDENDUM TO THE DIRECT PLUS LOAN MPN) WILL BE AVAILABLE ONLY THROUGH COD WEB WITH THE IMPLEMENTATION OF THIS CR.
September 20, 201783OTHER ADMINISTRATIVE ACTION+$141,079IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST (CR) 3568 - CAIVRS TO DO NOT PAY. THIS CR REQUIRES THE CONTRACTOR TO PLACE THE MONTHLY EXTRACT FROM THE CAIVRS FILE ONTO THE DNP BUSINESS CENTER'S SECURE FILE TRANSFER PROTOCOL SERVER WITH A UNIQUE USER IDENTIFICATION CODE AND PASSWORD THAT HAVE BEEN ASSIGNED FOR DATA TRANSFERS, AND TRANSMIT A MONTHLY COPY OF THE CAIVRS FILE TO DO NOT PAY.
September 15, 201784OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF CRITICAL FUNCTION OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS AS FOLLOWS: 1. CHANGE THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). 2. ADD CLAUSE FSA 39-6 SECURITY PROTOCOL FOR REPORTING CONTRACT EMPLOYEE DEPARTURE FROM A CONTRACT WHICH REQUIRES THE CONTRACTOR TO PROVIDE TIMELY NOTIFICATION OF A CONTRACTOR OR SUBCONTRACTOR EMPLOYEE'S DEPARTURE. 3. REMOVE CLAUSE FSA 32-1 INVOICE CLAUSE (MAR 2012) AND REPLACE IT WITH CLAUSE FSA 32-2 INVOICE AND CONTRACT FINANCING REQUESTS SUBMISSION - INVOICE PROCESSING PLATFORM (AUG 2017), WHICH REQUIRES THE CONTRACTOR TO SUBMIT INVOICES ELECTRONICALLY VIA A WEB-BASED SYSTEM. 4. DOCUMENT THE APPROVAL OF CHANGE REQUEST (CR) 4255 - TRANSITION MONTANA GA TO GREAT LAKES, WHICH REQUIRES THE MONTANA GUARANTY AGENCY TO NOW TRANSFER THEIR BORROWERS OVER TO GREAT LAKES. 5. DOCUMENT THE APPROVAL OF CR 4256- 2017 AWG HARDSHIP CALCULATOR, WHICH REQUIRES THE CONTRACTOR TO BEGIN USING THE 2017 VERSION OF THE AWG HARDSHIP CALCULATOR. 6. TO DOCUMENT THE APPROVAL OF CR 4337 - NSLDS REPORTING - ECMC/BANKRUPTCY CHAPTER 13 TRANSFERS, WHICH REQUIRES THE CONTRACTOR TO MODIFY THE PROCESS TO REPORT DEBTS TO NSLDS WITH A CODE FOR LOAN STATUS 'DB' WHEN THE BBKCXFD TAG IS PRESENT. 7. DOCUMENT THE APPROVAL OF CR 4352 - WHITELIST NEW IP ADDRESS FOR PCA RELIANT, WHICH REQUIRES THE CONTRACTOR TO WHITELIST A NEW IP ADDRESS FOR A PRIVATE COLLECTION AGENCY VENDOR. 8. DOCUMENT THE APPROVAL OF CR 4366 - EXPANDED FEMA DISASTER FORBEARANCE GUIDANCE, WHICH REQUIRES THE CONTRACTOR TO EXTEND THE EXISTING FORBEARANCE GUIDANCE FOR BORROWERS IMPACTED BY A MAJOR DISASTER. 7. DOCUMENT THE APPROVAL OF CR 4346 - INBOUND SKILLS BASED ROUTING ADDITION - PHASE 1, WHICH REQUIRES THE CONTRACTOR TO ROUTE CALLERS WITH A "CONSUMER MISSING" TAG DIRECTLY TO AN AGENT WITH NSLDS ACCESS.
September 12, 201782SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$320,448IGF::CT::IGF CRITICAL FUNCTION OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS. THE PURPOSE OF THIS MODIFICATION IS APPROVE CR 3861 SCRA BALANCE CORRECTIONS PHASE 2. PHASE 2 OF CR 3861 WILL CLEAN UP EXISTING ACCOUNTS THAT HAD INTEREST RATES CHARGING SERVICE MEMBERS HIGHER THAN 6%. AFTER THE CLEAN UP, A CONTINUED MAINTENANCE SYSTEM UPDATE WILL BE DEVELOPED AND BUILT TO ENSURE NEW ACCOUNTS OF THIS SORT WILL CONTINUE TO HAVE THE APPROPRIATE INTEREST RATE.
August 23, 201781OTHER ADMINISTRATIVE ACTION−$16,086IGF::CT::IGF CRITICAL FUNCTION OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS. THE PURPOSE OF THIS MODIFICATION IS REPLACE LOCAL CLAUSE FSA 39-1 REPORTING REQUIREMENTS FOR DEPARTED CONTRACTOR EMPLOYEES (AUG 2012) WITH FSA 39-5, MONTHLY VENDOR EMPLOYEE REPORT (AUG 2017), DOCUMENT THE APPROVAL OF CR 4279 NEW BORROWER DEFENSE AND HOLDFEMA TAGS, CR 4226 REMOVE GENERAL INFORMATION FROM MYEDEDB.ED.GOV/BORROWER (V.1.2), AND CR 4233 LEG DIRECT LOAN INTEREST RATES EFFECTIVE JULY 1, 2017, AND CANCEL CR 3305 SUPPORT FSA APPLICATION DEVELOPMENT PHASE 2 AND DEOBLIGATE FUNDING UNDER LINE ITEM 0022 IN THE AMOUNT OF $16,085.58.
July 27, 201779OTHER ADMINISTRATIVE ACTION+$14,262,893IGF::CT::IGF CRITICAL FUNCTION OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM DMCS. THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD 2, TO PROVIDE FUNDING FOR OPERATION AND MAINTENANCE, TO EXERCISE OPTION YEAR 2 FOR PIV I PHASE 2, TO RETRACT THE APPROVAL OF CR 4094 SUSPEND TREASURY FMS ADDRESS REQUESTS PREVIOUSLY APPROVED VIA MOD 0075, TO DOCUMENT THE APPROVAL OF THE REVISED VERSION OF CR 4094, WHICH WILL SUSPEND UNTIL FURTHER NOTICE INITIATING REQUESTS TO HAVE FSA UPDATE A BORROWER'S ADDRESS IN THE TREASURY FMS SYSTEM. THIS MOD ALSO DOCUMENTS THE APPROVAL OF CR 4256 2017 AWG HARDSHIP CALCULATOR, WHICH REQUIRES THE SERVICER TO BEGIN USING THE 2017 VERSION OF THE AWG HARDSHIP CALCULATOR, DOCUMENTS THE APPROVAL OF CR 3950 TRUSTED INTERNET CONNECTION BANNERS, WHICH REQUIRES FSA WEBSITES NOT TO DISPLAY COMMERCIAL PRODUCT OR SERVICE LOGOS OR ADVERTISEMENTS, AND DOCUMENTS THE APPROVAL OF CR 4149 ACCESS TO ECSI IMAGE REPOSITORY, WHICH GIVES DMCS ACCESS TO THE PROMISSORY NOTES TO VALIDATE THE DEBT AS REQUIRED BY THE FAIR DEBT COLLECTION PRACTICES ACT AFTER THE PERKINS SERVICER BEGINS ASSIGNING DEFAULTED LOANS TO DMCS.
June 28, 201778OTHER ADMINISTRATIVE ACTION+$31,100,000IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING FOR OPERATION AND MAINTENANCE, TO RETRACT THE APPROVAL OF CHANGE REQUEST (CR)4153 - CORRECTING LINKS WITHIN TEACH COUNSELING CORRESPONDENCE, AND CR 4154 - REPAY EST. DISABLE EMAIL. APPROVAL OF BOTH OF THESE CRS WERE INCORPORATED VIA MODIFICATION 0075 IN ERROR. THIS MODIFICATION ALSO DOCUMENTS THE APPROVAL OF CR 4200 - SYSTEM SECURITY DOCUMENTATION FOR BUSINESS OPERATION (V. 1.0) WHICH REQUIRES ALL APPLICATION SUPPORT CONTRACTORS THAT SUPPORT THE BUSINESS OPERATIONS COMPUTER SYSTEMS TO PROVIDE THEIR SYSTEM SECURITY DOCUMENTATION TO THE APPROPRIATE ISSO AND/OR CONTRACTING OFFICE (CO AND CORS) AT LEAST ANNUALLY. THE APPROVAL OF CR 4229 - UNDELIVERABLE MAIL RETENTION POLICY WAS ALSO DOCUMENTED IN THIS MODIFICATION WHICH WILL REQUIRE THE DMCS SERVICER TO RETAIN ALL MAIL FOR AT LEAST 90 DAYS BEFORE DESTROYING IT. THIS MODIFICATION ALSO INCORPORATES THE CURRENT U.S. DEPARTMENT OF LABOR WAGE DETERMINATIONS.
June 15, 201777OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST (CR) 4090 - IST WITH PERKINS SERVICER. THE PURPOSE OF THIS CR IS TO REQUIRE THE DMCS SERVICER TO CONDUCT INTEGRATED SYSTEM TESTING (IST) WITH THE PERKINS SERVICER FOR THE TRANSFER OF DEFAULTED LOANS FROM PERKINS TO DMCS. THE MOD ALSO REVISES NON-FINANCIAL METRIC 3 - CUSTOMER SATISFACTION, AND REVISES THE TIMELINESS DEFINITION FOR CREDIT BUREAU DISPUTES FOR THE NON-FINANCIAL PERFORMANCE METRIC 8 - RESPONSE MANAGEMENT.
May 12, 201776OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST 4179 - ADDENDUM - PROACTIVELY MANAGE CREDIT BALANCES. THE PURPOSE OF THIS CR IS TO REQUIRE THE CONTRACTOR TO CREATE AND AUTOMATICALLY APPLY A UNIQUE NEW TRANSACTION THAT WRITES UP THE CREDIT BALANCE TO ZERO FOR OVERPAYMENTS THAT ARE CAUSE BY A DEPT. OF JUSTICE OVERPAYMENTS.
May 11, 201775OTHER ADMINISTRATIVE ACTION+$8,000,000IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR OPERATION AND MAINTENANCE AND TO DOCUMENT THE APPROVAL OF MULTIPLE NO-COST CHANGE REQUESTS.
April 14, 201774OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST 2509 - CLEANUP INVALID CREDIT REFORM CODES.
April 13, 201773FUNDING ONLY ACTION+$6,899,000IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR OPERATION AND MAINTENANCE.
March 3, 201772OTHER ADMINISTRATIVE ACTION+$7,550,000IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR OPERATION AND MAINTENANCE.
February 24, 201771OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION 2.0 DELIVERABLES, DOCUMENT THE APPROVAL OF CHANGE REQUEST 4076 - HHS POVERTY GUIDELINES REVISION FOR 2017, AND TO DOCUMENT THE ISSUANCE OF 120 VERSIGN ID PROTECTION PERSONAL IDENTITY VERIFICATION (PIV) TOKENS.
February 16, 201770OTHER ADMINISTRATIVE ACTION+$38,535IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND FUND CR 3828 FSA NEXT GENERATION DATA CENTER TRANSITION .
January 27, 201769FUNDING ONLY ACTION+$7,000,000IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO CLIN 0001 FOR OPERATION AND MAINTENANCE.
January 27, 201768OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE DELIVERABLES TABLE, TO DOCUMENT THE APPROVAL OF CHANGE REQUESTS, AND TO UPDATE SECTION I. OF THE CONTRACT.
January 12, 201767FUNDING ONLY ACTION+$5,400,000IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS ADD FUNDING IN SUPPORT OF OPERATIONS AND MAINTENANCE AND TO DOCUMENT THE APPROVAL CHANGE REQUEST 3900 ENHANCED SCHOOL-BASED DISCHARGE REPORTING.
January 12, 201766OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST (CR) 2496 OUTGOING SERVICER ADJUSTMENTS AND CR 2600 PROACTIVELY MANAGE CREDIT BALANCES FUNDING AND IDENTIFY THE FUNDS THAT WILL SUPPORT THESE CRS.
December 21, 201665OTHER ADMINISTRATIVE ACTION−$103,180IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING AND DOCUMENT THE CANCELLATION OF A CHANGE REQUEST.
December 2, 201664OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE APPROVAL OF CHANGE REQUESTS AND KEY PERSONNEL CHANGES.
November 22, 201663OTHER ADMINISTRATIVE ACTION+$36,342IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND FUND A CHANGE REQUEST (CR) 3379 - SCRA BALANCE CORRECTIONS. THE PURPOSE OF THIS CR IS TO ENSURE THAT ANY BORROWERS ON ACTIVE DUTY ON OR BEFORE 8/14/2008 WERE NOT CHARGED AN INTEREST RATE HIGHER THAN 6%.
November 18, 201662OTHER ADMINISTRATIVE ACTION−$49,974IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A CORRECTION AND TO DEOBLIGATE FUNDING.
November 10, 201661OTHER ADMINISTRATIVE ACTION+$345,728IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND PROVIDE FUNDING FOR THE REMAINING PHASES OF A CHANGE REQUEST.
November 2, 201660OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND CANCEL CHANGE REQUESTS.
September 29, 201659OTHER ADMINISTRATIVE ACTION−$19,829IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING.
September 27, 201658OTHER ADMINISTRATIVE ACTION−$179,093IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING.
September 26, 201657FUNDING ONLY ACTION+$5,050,411IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR CLIN 0001 - OPERATION AND MAINTENANCE.
September 23, 201656OTHER ADMINISTRATIVE ACTION+$251,112IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND FUND THE DMCS 2016-08C RELEASE, EXTEND THE PERIOD OF PERFORMANCE FOR A CLIN 0002, AND TO REVISE THE KEY PERSONNEL.
September 9, 201655DEFINITIZE CHANGE ORDER+$541,513IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE AND FUND A CHANGE REQUEST 3379 TREASURY REPORT ON RECEIVABLES (TROR) DATA CALL SPECS FOR DMCS.
August 26, 201654CHANGE ORDERno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE AN AUTHORITY TO PROCEED FOR CHANGE REQUEST (CR) 3379 TREASURY REPORT ON RECEIVABLES (TROR) DATA CALL SPECS FOR DMCS. THE PURPOSE OF THIS CR IS TO REVISE TROR GUIDANCE TO IMPLEMENT DEBT COLLECTION REQUIREMENTS OF THE DATA ACT.
August 11, 201653OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF CRITICAL FUNCTION THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE SECURITY LANGUAGE IN THE CONTRACTS.
August 10, 201652FUNDING ONLY ACTION+$89,489IGF::CT::IGF CRITICAL FUNCTION THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CR 3772 - DMCS GFE DECOMMISSIONING TECHNICAL AND PRICE PROPOSAL AND PROVIDE ADDITIONAL FUNDING IN THE AMOUNT OF $89,488.88.
August 5, 201651FUNDING ONLY ACTION+$21,628IGF::CT::IGF "CRITICAL FUNCTION" OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE ACQUISITION OF SOFTWARE - VERIMOVE IN SUPPORT OF CLIN 0004 OTHER DIRECT COSTS AND DESIGNATE FUNDING FOR PIV-I PHASE 2 OPTION YEAR 1.
July 29, 201650EXERCISE AN OPTION+$31,360,547IGF::CT::IGF "CRITICAL FUNCTION" OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION YEAR I OF AND PROVIDE FUNDING IN SUPPORT OF CLIN 0001 DMCS OPERATION AND MAINTENANCE.
July 29, 201649OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF "CRITICAL FUNCTION" OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO MAKE CORRECTIONS TO MODIFICATION 0046.
June 29, 201648OTHER ADMINISTRATIVE ACTION+$1,134,032IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR THE REQUEST FOR EQUITABLE ADJUSTMENT - TRANSITION.
June 23, 201647OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF -CRITICAL FUNCTION- OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT COLLECTION SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE DELIVERABLES CHART IN SECTION 2.0 AND INCORPORATE CHANGES TO EARNED VALUE MANAGEMENT.
June 16, 201646OTHER ADMINISTRATIVE ACTION−$45,925IGF::CT::IGF - CRITICAL FUNCTION- OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MOD IS TO REPURPOSE FUNDING AND APPROVE NUMEROUS CRS AT NO ADDITIONAL COST TO THE GOVERNMENT.
May 26, 201645SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE+$228,383IGF::CT::IGF "CRITICAL FUNCTION" OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE THE CHANGE REQUESTS FOR THE FOLLOWING CHANGE REQUEST 2581 PERKINS ASSIGNMENTS IN THE AMOUNT OF $45,925.16. CHANGE REQUEST 2871 FIX LOAN ASSIGNMENT PROBLEMS IN THE AMOUNT OF $63,275.51. CHANGE REQUEST 3281 SECURE CONNECTIONS ACROSS FEDERAL WEBSITES AND WEB SERVICES AT NO ADDITIONAL COST TO THE GOVERNMENT. CHANGE REQUEST 3379 TREASURY REPORT ON RECEIVABLES (TROR) DATA CELL SPECS FOR DMCS IN THE AMOUNT $46,087.19. CHANGE REQUEST 3562 NEW OMB LOAN CONSOLIDATION FORMS AND ELVC FILE LAYOUT FOR DIRECT LOAN CONSOLIDATION IN THE AMOUNT OF $15,471.36. CHANGE REQUEST 3565 CORRECT CREDIT REPORTING IN THE AMOUNT $57,623.41. CHANGE REQUEST 3641 LDAP ACCESS MANAGEMENT PROGRAM (LAMP) AT NO ADDITIONAL COST TO THE GOVERNMENT.
May 26, 201644OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF "CRITICAL FUNCTION" OPERATION AND MAINTENANCE OF THE DEBT MANAGMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE APPROVAL OF THE FOLLOWING CHANGE REQUESTS (CR) CR 3705, CR 3591, CR 3704, CR 3661.
May 6, 201643OTHER ADMINISTRATIVE ACTION+$726,866IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE PAYMENT OF THE REA FOR CR 2696 AND MODIFY THE PRICING TABLE.
May 6, 201642DEFINITIZE CHANGE ORDERno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE A CHANGE ORDER FOR PIV-I IMPLEMENTATION.
April 22, 201641OTHER ADMINISTRATIVE ACTION+$21,390,000IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR OPERATION AND MAINTENANCE AND DOCUMENT THE APPROVAL OF CHANGE REQUESTS.
April 11, 201640OTHER ADMINISTRATIVE ACTION+$9,226IGF::CT::IGF CRITICAL FUNCTION THE PURPOSE OF THIS MODIFICATION IS TO APPROVED CR 3609 - ENTERPRISE COMPLAINT SYSTEM - DMCS INTERIM PROCESS AND TO PROVIDE ADDITIONAL FUNDING.
April 8, 201639OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF CRITICAL FUNCTION THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT APPROVAL OF CRS 3577,3544,3661,3668,3603,AND 3664.
March 23, 201638OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO RETRACT THE APPROVAL OF A CHANGE REQUEST, DOCUMENT THE APPROVAL OF TWO CHANGE REQUESTS, AND INCORPORATE A KEY PERSONNEL CHANGE.
March 21, 201637OTHER ADMINISTRATIVE ACTION+$6,415,555IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE MULTIPLE CHANGE REQUESTS, PROVIDE FUNDING FOR OPERATIONS AND MAINTENANCE, AND TO INCORPORATE A KEY PERSONNEL CHANGE.
February 19, 201636OTHER ADMINISTRATIVE ACTION+$5,943,100IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR O&M AND TO DOCUMENT THE APPROVAL OF CHANGE REQUESTS.
February 12, 201635OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE EVALUATION CRITERIA FOR THE CHANGE MANAGEMENT PLAN.
January 27, 201634OTHER ADMINISTRATIVE ACTION+$587,006IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE AND FUND THE APRIL 2016 RELEASE.
January 22, 201633FUNDING ONLY ACTION+$6,554,210IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITONAL FUNDING FOR OPERATIONS AND MAINTENANCE AND OTHER DIRECT COSTS.
January 6, 201632OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO REVISE NON-FINANCIAL PERFORMANCE METRICS IN THE DMCS CONTRACT.
January 4, 201631FUNDING ONLY ACTION+$34,982IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING FOR CR 2792.
December 18, 201530OTHER ADMINISTRATIVE ACTION+$6,334,895IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING IN SUPPORT OF O&M, APPROVE TWO CHANGE REQUESTS, AND TO REMOVE A REQUIREMENT ITEM.
December 14, 201529OTHER ADMINISTRATIVE ACTION+$103,180IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT APPROVAL OF THREE CHANGE REQUESTS, UPDATE KEY PERSONNEL AND DEFINITIZE PIV-I IMPLEMENTATION PHASE 1.
December 10, 201528OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE CHANGE MANAGEMENT PLAN FROM AN INFORMAL TO FORMAL DELIVERABLE.
November 2, 201527OTHER ADMINISTRATIVE ACTION+$41,108IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE TWO CHANGE REQUESTS, INCORPORATE KEY PERSONNEL CHANGE, INCORPORATE REVISED SUBCONTRACTING PLAN, AND TO INCORPORATE ADDITIONAL GFP.
October 27, 201526CHANGE ORDERno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL REQUIREMENTS TO PIV-I IMPLEMENTATION.
September 25, 201525OTHER ADMINISTRATIVE ACTION+$650,000IGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR PIV-I IMPLEMENTATION.
September 25, 201524OTHER ADMINISTRATIVE ACTION+$136,707OPERATIONS AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. IGF::CT::IGF.
September 11, 201523OTHER ADMINISTRATIVE ACTION+$2,537,656OPERATIONS AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM. IGF::CT::IGF.
August 27, 201522CHANGE ORDERno moneyOPERATIONS AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
August 12, 201521FUNDING ONLY ACTION+$22,231,425IGF::CT::IGF CRITICAL FUNCTION THE PURPOSE OF MODIFICATION 0021 IS TO ADD ADDITIONAL FUNDING TO CLIN 0001.
August 12, 201520OTHER ADMINISTRATIVE ACTIONno moneyOPERATIONS AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF.
July 24, 201519OTHER ADMINISTRATIVE ACTION+$77,041OPERATIONS AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF.
July 10, 201518OTHER ADMINISTRATIVE ACTIONno moneyIGF::CT::IGF - CRITICAL FUNCTION - OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS). THE PURPOSE OF THIS MODIFICATION IS TO APPROVE CHANGE REQUEST 3286 - CYBER SECURITY SPRINT.
June 23, 201517OTHER ADMINISTRATIVE ACTION+$12,085,869OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
April 17, 201516OTHER ADMINISTRATIVE ACTION+$12,353,000OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
March 13, 201515FUNDING ONLY ACTION+$22,500OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
February 20, 201514FUNDING ONLY ACTION+$10,844,526OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
February 6, 201513OTHER ADMINISTRATIVE ACTIONno moneyOPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
December 22, 201412OTHER ADMINISTRATIVE ACTION+$11,393,073OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
November 7, 201411OTHER ADMINISTRATIVE ACTION−$23,956OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
September 26, 201410FUNDING ONLY ACTION+$262,745OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR CRS 2205 -TREASURY REPORT ON RECEIVABLES (TROR), CR 2657 - BORROWER HISTORY ANALYSIS REPORT (BHAR) AND CR 2755 - SALLIE MAE CORPORATION NAME CHANGE TO NAVIENT
July 31, 20149FUNDING ONLY ACTION+$27,261,398OPERATION AND MAINTENANCE OF THE DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
July 16, 20148OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEMS (DMCS) IGF::CT::IGF
June 18, 20147OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
May 27, 20146OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
March 28, 20145OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
February 24, 20144OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
November 13, 20133OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
October 17, 20132OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
October 1, 20131OTHER ADMINISTRATIVE ACTIONno moneyDEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF
September 27, 2013basenot on file+$7,285,000DEBT MANAGEMENT AND COLLECTIONS SYSTEM (DMCS) IGF::CT::IGF

Last refreshed November 4, 2026 at 2:31 PM UTC.